CAV Deployments
Florida is proud of our extensive work in the CAV field. With nearly 1,000 people moving to the state each day, the implementation of technologies that will improve safety and enhance mobility is imperative. While the CAV landscape is rapidly evolving, FDOT and our partners are strategically pursuing the deployment of the latest technologies as we drive towards Target Zero, FDOT's goal of achieving a fatality-free and congestion-free roadway network. Below is the image of the projects and initiatives in the state of Florida.

Learn more about a project by clicking the project name from the list provided below.

- Pinellas Advanced SmartTracs System Pass (PASS) – 2024 ATTAIN Grant
- Pinellas Advanced Technology for Traveler Information (PATI)

1. Manatee County – SR 686 Cortez Rd
2. City of St. Petersburg Smart Signal Corridor
3. City of Clearwater Pedestrian Warning System
5. Bicycle Detection Pilot Program
6. Pasco County SMART US-19
9. District 7 Integrated Corridor Management Hillsborough County Connected Vehicle Priority and Preemption Program (CVPP)
10. Hillsborough County Connected Vehicle Priority and Preemption Program CVPP

- Security Credential Management System (SCMS)
- Lane Closure Notification System (LCNS)
- I-4 FRAME (2019 ATCMTD)
- AV Shuttles at Lake Nona
- THEA CV Pilot
- Florida's Turnpike Mainline and Beachline CV Deployment
- Pinellas County SPaT
- Incident Response Vehicle (Smart Work Zone)
- I-75 FRAME Gainesville
- SR 434 CV Deployment
- NASA Blvd (T5780)
- Davis Highway CAV
- SR 436 PedSafe Project - City of Altamonte Springs
- US 90 Signal Phase and Timing (SPaT) Tallahassee
- US 98 Smart Bay
- FTE Suntrax
- State Road 423 Freight Signal Priority
- First Responder (Signal Siren)
- City of Tampa Advanced Traffic Management
- Florida Keys Connecting Overseas to Advance Safe Travels (Florida Keys COAST) Pilot Project
- City of Sarasota CAV Project
- Lakeland Intersection Collision Avoidance Safety Program (iCASP)
- Bee Ridge Corridor Smart Signals
- I-75 and I-95 Queue Warning System
- City of Altamonte Springs CraneRIDES
- Lake Mary Boulevard CV Project
- LeeTran US 41 Transit Signal Priority
- Collier Countywide Connected Traveler Information System (CTIS)
- Train Vehicle Crash Avoidance Pilot Project
- US 41 FRAME
- Data Exchange Platform for Operations Technology (DEPOT)
- SODATOP (E59A5) - Smart Orlando Downtown Advanced Traffic Operations Performance
- Pinellas SR 60 West Coast Signal Corridor Project
- Pinellas County Smart Community (2020 ATCMTD)
- U.S. 17-92 Connected Vehicle Deployment
- SR 29 Wildlife Protection
- CV Smart Signal - Lake County
- Ped/Safe II U.S. 441 / State Road 50
- SR-40 ITS Safety Deployment
- Plant City Connected Vehicle Preemption System (CVPS)
