District Five Letting & Project Information


Current Letting and Project Information

2025 Lettings

Is there an immediate solution to mitigate the existing traffic issue currently along Cove Road?

A project traffic study is being conducted as part of this PD&E Study and is evaluating both existing and future traffic conditions along Cove Road to determine recommended improvements to address traffic deficiencies. A safety analysis will also be conducted to determine where safety issues exist and identify the improvements that can be made to address safety issues.

 

2025 Award & Posting / Bid Tabulations

Is there an immediate solution to mitigate the existing traffic issue currently along Cove Road?

A project traffic study is being conducted as part of this PD&E Study and is evaluating both existing and future traffic conditions along Cove Road to determine recommended improvements to address traffic deficiencies. A safety analysis will also be conducted to determine where safety issues exist and identify the improvements that can be made to address safety issues.

 

Previous Lettings

2024 Letting Information:  Letting, Project, Addenda, Award & Posting Information

2023 Letting Information:  Letting, Project, Addenda, Award & Posting Information

2022 Letting Information:  Letting, Project, Addenda, Award & Posting Information

2021 Letting Information:  Letting, Project, Addenda, Award & Posting Information

2020 Letting Information:  Letting, Project, Addenda, Award & Posting Information

2019 Letting Information:  Letting, Project, Addenda, Award & Posting Information

2018 Letting Information:  Letting, Project, Addenda, Award & Posting Information

 

Addenda & Amendments

Contractors will be notified of all Amendments and are required to download the Amendments from the  CPP Online Ordering System per these instructions: Amendment Instructions (PDF)

Amendment files can be downloaded by clicking on the links.  Amendments must be downloaded to the location of your original EBS file prior to preparing the bid.

 

If you do not have Acrobat Reader you can download it free at Get Acrobat Reader.

Is there an immediate solution to mitigate the existing traffic issue currently along Cove Road?

A project traffic study is being conducted as part of this PD&E Study and is evaluating both existing and future traffic conditions along Cove Road to determine recommended improvements to address traffic deficiencies. A safety analysis will also be conducted to determine where safety issues exist and identify the improvements that can be made to address safety issues.