District Five Letting & Project Information
Current Letting and Project Information
2025 Lettings
Expand all
Collapse all
Important Letting Documents
|
Proposal ID | County | Major Work Type | Addendum |
E51D9-R0 | Lake, Orange | BDI Aesthetics | |
E59C0-R0 | Districtwide | BDI Pavement Markings | |
E59C2 | Lake | MOVED TO FEBRUARY 4, 2025 LETTING | 1 |
Important Letting Documents
|
Proposal ID | County | Major Work Type | Addendum |
E52D6-R0 | Lake, Orange | Aesthetics | |
E55F2 | Flagler | Resurfacing | |
E55F3 | Volusia | Resurfacing | |
E57D5-R0 | Lake, Orange, Seminole | Wekiva Parkway Landscape Maintenance | |
E57D9 | Seminole | Wekiva Parkway Acrylic Screen Wall | |
E59C2 | Lake | Pavement Markings | 1, 2, 3 |
Important Letting Documents
|
Proposal ID | County | Major Work Type | Addendum |
E55F6 | Orange | Resurfacing | |
Z5090 | Districtwide | Pre-Event Emergency Traffic Signal Permanent (Type II) Repair |
Important Letting Documents
|
Proposal ID | County | Major Work Type | Addendum |
E53F1 | Brevard | Resurfacing | 1, 2 |
E54F9 | Districtwide | Traffic Ops Roadway Pushbutton Contract with Mobilization | |
E55F0 | Districtwide | Traffic Operations Pushbutton Signalization With Mobilization | |
E55F4 | Brevard | Clearing and Grubbing | |
E55F5 | Seminole | ITS Surveillance System | |
E56F2 | Seminole | Resurfacing | 1 |
E56F7 | Osceola | Resurfacing | |
E58D1-R0 | Volusia | Aesthetics This Contract includes an option for renewal. |
Important Letting Documents
|
Proposal ID | County | Major Work Type | Addendum |
E51D7 | Brevard | Traffic Signal Repair | |
E55F7 | Brevard | Bascule Bridge Rehabilitation | |
E56F1 | Districtwide | Traffic Operations Pushbutton APS With Mobilization | |
E56F4 | Volusia | Resurfacing | |
E56F5 | Brevard | BDI SR A1A Landscape Installation & Establishment | |
E57D8 | Volusia | WITHDRAWN | |
E57F7 | Districtwide | Landscape Installation & Establishment Pushbutton | |
E58D0-R0 | Brevard | Drainage Repair | |
E58D3 | Lake | Drainage Repair |
Important Letting Documents
|
Proposal ID | County | Major Work Type | Addendum |
E57F9 | Districtwide | Traffic Ops Roadway Pushbutton Contract with Mobilization | |
E58D4-R0 | Lake, Seminole | Shoulder/ Slope Repair | |
E58D8-R0 | Orange | MOT Services | |
Z5091 | Districtwide | Pre-Event Emergency Generator Installation | |
Z5092 | Districtwide | Pre-Event Emergency Sign Permanent Repair and Replacement |
Important Letting Documents
|
Proposal ID | County | Major Work Type | Addendum |
E53D9-R0 | Brevard, Orange, Osceola, Volusia | Pavement Markings | |
E56F9 | Orange | Landscape Installation & Establishment | |
E57F0 | Orange | BDI Resurfacing |
Important Letting Documents
|
Proposal ID | County | Major Work Type | Addendum |
E53D8 | Brevard | Pavement Markings | |
E55F8 | Volusia | Bridge-Repair/Rehabilitation | |
E55F9 | Districtwide/Seminole, Volusia | Bridge-Repair/Rehabilitation | |
E57D1-R0 | Orange, Seminole | Pavement Markings | |
E57D3-R0 | Orange, Seminole | Drainage Repair | |
E58F4 | Osceola | Resurfacing | |
E59F3 | Seminole | Resurfacing | |
E59F5 | Brevard | Landscape Installation & Establishment | |
Z5093 | Districtwide | Pre-Event Cut & Toss/Heavy Equipment Crew |
Important Letting Documents
|
Proposal ID | County | Major Work Type | Addendum |
E53D2-R0 | Brevard | Performance Aesthetics-Maintenance | 1 |
E56D0 | Marion | Desilt & Video | |
E56D1 | Marion | Pavement Markings | |
E56D6-R0 | Orange | Performance Sidewalk & Inlet Top Management | |
E57D2 | Orange | Concrete Roadway Repair | |
E58F0 | Brevard | Resurfacing | |
E58F1 | Sumter | Resurfacing | 1 |
E58F2 | Sumter | Resurfacing | |
E58F3 | Sumter | BDI Resurfacing | |
E59F2 | Orange | Resurfacing / Drainage / Roadway Signing |
Important Letting Documents
|
Proposal ID | County | Major Work Type | Addendum |
E53D7-R0 | Brevard | MOVED TO NOVEMBER 4, 2025 LETTING | 1 |
E59F7 | Lake | Traffic Operations Pushbutton Signalization Contract with Mobilization | |
E59F8 | Marion | Traffic Operations Pushbutton Signalization Contract with Mobilization |
Important Letting Documents
|
Proposal ID | County | Major Work Type | Addendum |
E50G0 | Orange | Traffic Ops Improvement | |
E55D1-R0 | Lake, Orange | Pavement Markings | |
E55D4-R0 | Lake, Orange | Drainage Repair | |
E58F5 | Brevard | Resurfacing | |
E58F6 | Orange | Resurfacing | |
E59D3-R0 | Lake, Orange | Concrete Repair | |
E59D9 | Lake | Drainage Repair | |
E53D7-R0 | Brevard | Concrete Repair | 1, 2 |
2025 Award & Posting / Bid Tabulations
Expand all
Collapse all
Posted February 18, 2025
8:00 AM
PROPOSAL/CONTRACT NO. - BID TAB | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E52D6-R0 | Rotolo Consultants, Inc. | 2/24/2025 |
E55F2 | P&S Paving, Inc. | 2/24/2025 |
E55F3 | P&S Paving, Inc. | 2/24/2025 |
E57D5-R0 | Lafleur Nurseries and Garden Center | 2/24/2025 |
E57D9 | Premier Paving, LLC | 2/24/2025 |
E59C2 | TRP Construction Group, LLC | 2/24/2025 |
Posted April 15, 2025
8:00 AM
PROPOSAL/CONTRACT NO. - BID TAB | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
Masci General Contractor, Inc. | 4/21/2025 | |
E54F9 | REJECT ALL BIDS | N/A |
E55F0 | Sice, Inc. | 4/21/2025 |
E55F4 | Collins Land Services, LLC | 4/21/2025 |
E55F5 | Chinchor Electric, Inc. | 4/21/2025 |
E56F2 | JR. Davis Construction Company, Inc. | 4/21/2025 |
E56F7 | Middlesex Paving, LLC | 4/21/2025 |
E58D1-R0 | Grow Care Outdoor Solutions, LLC | 4/21/2025 |
Posted May 20, 2025
8:00 AM
PROPOSAL/CONTRACT NO. - BID TAB | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
Traffic Control Devices, LLC | 5/27/2025 | |
E55F7 | Seacoast Incorporated | 5/27/2025 |
E56F1 | Chinchor Electric, Inc. | 5/27/2025 |
E56F4 | P & S Paving, Inc. | 5/27/2025 |
E56F5 | REJECT ALL BIDS | N/A |
E57D8 | WITHDRAWN | N/A |
E57F7 | Superior Landscaping & Lawn Service | 5/27/2025 |
E58D0-R0 | National Water Main Cleaning Company | 5/27/2025 |
Posted June 23, 2025
10:30 AM
PROPOSAL/CONTRACT NO. - BID TAB | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E58D3 | Premier Paving, LLC | 6/27/2025 |
Posted June 17, 2025
8:00 AM
PROPOSAL/CONTRACT NO. - BID TAB | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E57F9 | Rogar Management & Consulting of Florida, LLC | 6/23/2025 |
E58D4-R0 | Cyclone Contracting Services, LLC | 6/23/2025 |
E58D8-R0 | Cornerstone Barricades, Inc. | 6/23/2025 |
Z5091 | Signal Technology and Installation Corp. | 6/23/2025 |
Z5092 | Chinchor Electric, Inc. | 6/23/2025 |
Posted August 19, 2025
11:00 AM
PROPOSAL/CONTRACT NO. - BID TAB | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
E53D8 | P & P Striping, LLC | 8/25/2025 |
E55F8 | Seacoast Incorporated | 8/25/2025 |
E55F9 | Bridge Masters Construction, LLC | 8/25/2025 |
E57D1-R0 | McShea Contracting, LLC | 8/25/2025 |
E57D3-R0 | National Water Main Company | 8/25/2025 |
E58F4 | Ajax Paving Industries of Florida, LLC | 8/25/2025 |
E59F3 | Hubbard Construction Company | 8/25/2025 |
E59F5 | Grow Care Outdoor Solutions, LLC | 8/25/2025 |
Z5093 | Premier Paving, LLC | 8/25/2025 |
Posted September 16, 2025
8:00 AM
PROPOSAL/CONTRACT NO. - BID TAB | INTENT TO AWARD - CONTRACTOR'S NAME | DATE AWARDED |
Faith Construction Group, Inc. | 9/22/2025 | |
Maer Homes, LLC | 9/22/2025 | |
E56D1 | P & P Striping, LLC | 9/22/2025 |
E56D6-R0 | Yoroca Engineering Contractors, LLC | 9/22/2025 |
Yoroca Engineering Contractors, LLC | 9/22/2025 | |
E58F0 | Preferred Materials, Inc. | 9/22/2025 |
E58F1 | C.W. Roberts Contracting, Inc. | 9/22/2025 |
E58F2 | C.W. Roberts Contracting, Inc. | 9/22/2025 |
E58F3 | Pigott Asphalt and Sitework, LLC | 9/22/2025 |
E59F2 | Atlantic Civil Constructors Corp | 9/22/2025 |
Other Letting Information
Letting and Posting Dates Schedule
Technical Review and Awards Committee Meeting Notices
Additional General Letting Documentation
Fixed Capital Outlay (FCO) Projects
Construction Manager / General Contractor Projects
Performance Bonds can be found in the appropriate Contract Document on the FACTS website: https://facts.fldfs.com/
Previous Lettings
2024 Letting Information: Letting, Project, Addenda, Award & Posting Information
2023 Letting Information: Letting, Project, Addenda, Award & Posting Information
2022 Letting Information: Letting, Project, Addenda, Award & Posting Information
2021 Letting Information: Letting, Project, Addenda, Award & Posting Information
2020 Letting Information: Letting, Project, Addenda, Award & Posting Information
2019 Letting Information: Letting, Project, Addenda, Award & Posting Information
2018 Letting Information: Letting, Project, Addenda, Award & Posting Information
Addenda & Amendments
Contractors will be notified of all Amendments and are required to download the Amendments from the CPP Online Ordering System per these instructions: Amendment Instructions (PDF)
Amendment files can be downloaded by clicking on the links. Amendments must be downloaded to the location of your original EBS file prior to preparing the bid.
If you do not have Acrobat Reader you can download it free at Get Acrobat Reader.