3442 search results for REPORT NUMBER

9510100-724origind

documents (such as a treatment certification, a treating report, and an assay report). All calls, to the appropriate specifications. The certification shall include: the project/order number, timber species, charge numbers, and assay retention results. The producer/treater shall maintain all

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/internal/9510100-724origind.pdf?sfvrsn=aaba0cef_1

9850000-722resp

name, style number, roll dimensions and LOT numbers must be clearly labeled on all packaging, of the specification. The NTPEP Audit Report is limited to Structural Geosynthetic Materials. NTPEP Audit Report

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/comments-responses/9850000-722resp.pdf?sfvrsn=8d32bcfc_2

Section35V2-725cln

at each supply location with their APL number. (C) A current list of tests and qualifications, lab is not operational. (D) The tank identification numbers with the corresponding volumes, report, Asphalt Binder 3-5-4 Topic No.: 675-000-000 Materials Manual Effective: October 13, 2014, of sampling. Ensure that the tank number, Supplier’s LOT number, material grade, and sample date, , as applicable: (A) Material grade and APL number (B) Quantity of material (in Gallons) (C) Anti

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/materials-manual/section35v2-725cln.pdf?sfvrsn=3a949b33_1

Section3.5-051018_1-19WB

) An updated list of materials being supplied at each supply location with their APL number. (C, numbers with the corresponding volumes (in gallons). (E) The sampling and testing procedures for QC, a statement that the transport vehicle inspection report, Topic No.: 675-000-000 Effective: October 13, 2014, that the tank number, Supplier’s LOT number, material grade, and sample date is clearly labeled, : (A) Material grade and APL number (B) Quantity of material (in Gallons) (C) Anti-strip name, amount

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/materials-manual/section3-5-051018_1-19wb.pdf?sfvrsn=917015bc_1

Section35-051815 1-16

. (B)An updated list of materials being supplied at each supply location with their APL number. (C, laboratory for situations where the primary lab is not operational. (D)The tank identification numbers, that the transport vehicle inspection report, signed by the responsible inspector, shall be maintained, from the date of sampling. Ensure that the tank number, Supplier’s LOT number, material grade, of the following items, as applicable: (A)Material grade and APL number (B)Quantity of material

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/materials-manual/section35-051815-1-16.docx?sfvrsn=22c51609_1

section3.5-vii

supplied at each supply location with their APL number. Topic No.: 675-000-000 Effective: October, where the primary lab is not operational. (D) The tank identification numbers, vehicle inspection report, signed by the responsible inspector, shall be maintained, of sampling. Ensure that the tank number, Supplier’s LOT number, material grade, and sample date, Material Asphalt Binder 3-5-7 (A) Material grade and APL number (B) Quantity of material (in Gallons

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/materials-manual/section3-5-vii.pdf?sfvrsn=542b41d2_1

Section3.5-051018_1-19WB

) An updated list of materials being supplied at each supply location with their APL number. (C, numbers with the corresponding volumes (in gallons). (E) The sampling and testing procedures for QC, a statement that the transport vehicle inspection report, Topic No.: 675-000-000 Effective: October 13, 2014, that the tank number, Supplier’s LOT number, material grade, and sample date is clearly labeled, : (A) Material grade and APL number (B) Quantity of material (in Gallons) (C) Anti-strip name, amount

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/materials-manual/section3-5-051018_1-19wb.pdf?sfvrsn=4d59cebb_1

2024FDM131PlansProcessing

Quantities Report, and other contract and transmittal documents. PS&E Submittals are numbered, Management Office. (6) Authorization Estimate: The Authorization Estimate is a report generated, Package with all required components. Show the new Proposal/Contract ID number on the Key Sheet(s

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm131plansprocessing.pdf?sfvrsn=966fc248_1

2024FDM131PlansProcessing

and BIM.zip, Specification Package, the Estimated Quantities Report, and other contract and transmittal documents. PS&E Submittals are numbered consecutively, and re-submittals are required until the project, : The Authorization Estimate is a report generated by the Design Quantities and Estimates (DQE, with all required components. Show the new Proposal/Contract ID number on the Key Sheet(s). Project

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm131plansprocessing.pdf?sfvrsn=153bb58d_1

2025FDM131PlansProcessing

, the Estimated Quantities Report, and other contract and transmittal documents. PS&E Submittals are numbered consecutively, and re-submittals are required until the project is accepted by the District Program Management Office. (6) Authorization Estimate: The Authorization Estimate is a report, ID number on the Key Sheet(s). Project documents in Central Office from the previous submittal

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm131plansprocessing.pdf?sfvrsn=3e9edc1d_1

2025FDM131PlansProcessing

Plans and BIM.zip, Specification Package, the Estimated Quantities Report, and other contract and transmittal documents. PS&E Submittals are numbered consecutively, and re-submittals are required, : The Authorization Estimate is a report generated by the Design Quantities and Estimates (DQE, number on the Key Sheet(s). Project documents in Central Office from the previous submittal

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm131plansprocessing.pdf?sfvrsn=298735de_1

9900100.origind

for inclusion on the APL shall include the FHWA WZ numbered acceptance letter with attachments and vendor, of proprietary temporary barrier systems for inclusion on the APL must be the NCHRP Report 350 TL-3, of crash cushions for inclusion on the APL must be the NCHRP Report 350 TL-2 or TL-3 criteria or MASH

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/internal/9900100.origind.pdf?sfvrsn=44c97cd6_0

Constructability Phase Checklist

(CRAS) Report ☐ Wildlife Study Report or Natural Resource Evaluation (NRE) ☐ Wetland Survey Report, /Exemption) ☐ Bridge Asbestos Report/Lead Based Paint Report ☐ Level I and II Contamination Assessment Report ☐ OFF SHS ☐ON SHS ☐CRITICAL PROJECT (Structural Elements) Page 2 of 4 Agency: Completion,  LAP Manual, Chapter 21  Include page numbers under “Requirement Location” for reference, Justification Report  AASHTO Roadway Lighting Design Guide  FDM, Chapter 231.4 □ NO change to access

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/designsupport/districts/d4lap/projectmanagementanddistrictresources/design/archive/constructability-phase-checklist.pdf?sfvrsn=e4dd307d_2

E54B2Addenda001

FINANCIAL PROJECT NUMBER(s): 442884-1-52-01, 442884-1-52-02, 442874-1-52-01, 442874-1-52-02 and 446544-1-52-01 CONTRACT NUMBER: E54B2 COUNTY: Volusia DESCRIPTION: SR A1A, from International Speedway, REVISION The Estimated Quantities Report for 442884-1 and 442874-1 have been revised. Please go, : Financial Project ID (Lead number only) Proposal/Contract ID SUPPLEMENTAL SPECIFICATIONSPACKAGE NUMBER SheetNo(s).Rev.Date Description Summary of Quantities Pay Item Sheet No.Add. / Del. / Rev.Old

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2024/may07/e54b2addenda001.pdf?sfvrsn=7a11512c_1

E6O89Addendum001

Revision #1  Estimate of Quantities Report Revision #1  Plans Revision #1 If you are a BID, ://cpp.fdot.gov/ to download the Amendment file for this addendum. FPID Sheet Number Revision Date, to Index PLANS REVISION NUMBER 01 Sheet Number Revision Date Description 1-3 7/23/2024 Deleted, Bridge Decks) SUPPLEMENTAL SPECIFICATION PACKAGE NUMBER 01 Generated on: 7/16/2024 4:25:45 PM Date: 7/16/2024 Financial Project ID: (Lead Number Only) 444803-1 E6O89 Proposal/Contract ID: FPID

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/lettings/2024/jul25/e6o89addendum001.pdf?sfvrsn=d3c9c494_1

Reeval QA QC Checklist-2023

figures and graphics are legible ☐ ☐ Check that figures are numbered and referenced correctly, are summarized in the Cultural Resources Assessment Survey (CRAS) Report addendum) Before Initial Submittal, in previous Re-evaluations when applicable) such as alignment, number of lanes, their width, major structures, to the PCR ☐ ☐ ☐ ☐ The applicable Federal Aid Project (FAP) number is used in the PCR ☐ Comments, Report, Natural Resources Evaluation (NRE), Noise Study Report (NSR), Pond Siting Report (PSR), Surveys

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/pdeman/reeval-qa-qc-checklist-2023.pdf?sfvrsn=68329e4e_1

4600402.FHWA

traceability in a report type format that correlates heat numbers to their respective locations, be numbered consecutively beginning with the number 1, at the start of each project. Erectors will start, facility, submittals must be numbered consecutively beginning with the number 1, at the start, the entire fabrication process. Document this material traceability in a report type format that correlates heat numbers to their respective locations in the completed members. Submit diagrams

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/fhwa/4600402.fhwa.pdf?sfvrsn=95b91a2c_0

9260100-724IMPL

test report ***Accepted by certification ARTICLE 926-8 is deleted and the following substituted, the serial or LOT numbers of the containers certified

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/implemented/9260100-724impl.pdf?sfvrsn=79705a61_1

A51

Select a report... Inspection Report 04-16-2024 Inspection Report 04-14-2023 Inspection Report 04-19-2022 Inspection Report 04-23-2021 Inspection Report 06-04-2020 Inspection Report 05-03-2019 Inspection Report 04-03-2018 Inspection Report 04-28-2017 Inspection Report 04-19-2016, 06-13-1988 Inspection Record 02-02-1988 Inspection Record 01-21-1987 Inspection Report 09-04-1985, Airfield Pavement Management Program Summary Report. The summary reports

https://www.fdot.gov/aviation/airportslist/a51

LCQ

Archives Historical AirportInspection Reports Select a report... Inspection Report 04-17-2024 Inspection Report 04-11-2023 Inspection Report 04-20-2022 Updated Inspection Report 04-20-2022 Inspection Report 04-20-2021 Inspection Record 06-10-2020 Inspection Record 04-30-2019 Inspection Report 04-04-2018 Inspection Record 04-25-2017 Inspection Record 04-22-2016, Pavement Management Program Summary Report. The summary reports

https://www.fdot.gov/aviation/airportslist/LCQ
20 of 3442 results