District 1 Freight Resources


District 1, with a land area of nearly 12,000 square miles, represents 12 counties in Southwestern Florida. The District has:

 

 

 1 deepwater seaport, Port Manatee, that is a Strategic Intermodal System (SIS) hub with both highway and rail connections

 

 121 private airports, and 18 public airports including one

 SIS and two emerging SIS facility

 

 5 railroad companies (CSX, Florida Midland Railroad, Port Manatee Railroad, South Central Florida Express, and Seminole Gulf Railway)

 

 CSX's Central Florida Intermodal Logistics Center (ILC) in Winter

 Haven is the largest ILC in the state and one of only three facilities

 of its kind in the U.S.

 

Freight Coordinator

Keith.Robbins@dot.state.fl.us

863-232-7525

 

D1

Regional Projects & Initiatives

Freight Activity Center Definition & Evaluation – The report summarizes methods used to identify and evaluate Freight Activity Center (FAC) Connectors in FDOT District One.  FAC Connectors are defined as local and state roadways connecting freight trip generating uses within FACs with Freight Mobility Corridors (FMCs) designated in the District Freight Mobility and Trade Plan (FMTP).  The definition and evaluation process were undertaken to identify issues impacting transportation and freight logistics along key corridors as part of the District’s ongoing efforts to provide more efficient and safe freight movement in the region.  The report provides a review of FAC Connector conditions district-wide and offers more detailed information on conditions of FAC Connectors in FACs with high levels of existing and potential industrial development activity.

Port Manatee Site Utilization & Network Analysis Study – The purpose of this study was to research and identify future capability and capacity improvements utilizing current and future Port Manatee properties, existing infrastructure, and identification of new infrastructure and facilities to maximize Port Manatee’s freight movement and handling capabilities.  The study identifies transportation requirements as a result of forecasted growth to include specific projects on and off port property to improve cargo and traffic flow on existing roadways and port connectors.  A Needs Assessment Study for Piney Point Road (Port Connector) was conducted as a result of recommendations in this study and will be followed by a PD&E in preparation for future improvements to this important SIS Highway Connector.

Airport Regional Transportation & Industrial Development Analysis (ARTIDA) – The purpose of this study is to research and identify future capability and capacity improvements to the state road network that may be required to accommodate the growth and expansion of transportation related activities at and within the study area (five miles) of five select airports.   Research includes a review of on and off airport property infrastructure and uses and the identification of new infrastructure and facilities to maximize those airport properties cargo movements and handling capabilities.  The process will also identify transportation project recommendations as a result of forecasted growth to include specific projects on and off airport properties to improve cargo and traffic flow on the existing roadways and airport connectors.  Airports in the study are Lakeland Linder International Airport, Southwest Florida International Airport, Sebring Regional Airport and Multimodal Logistics Center, Winter Haven Regional Airport, and Punta Gorda Airport.

Annual Freight and Ag-Transport Trucking Forum – In an ongoing series of engagement activities to provide updates on major projects and plans to the general freight and ag-specific trucking industry, District One hosts the Annual Freight Trucking Forum (typically in August) at Polk State’s Corporate College Campus in Bartow.  In the morning session we partner with the Florida Fruit & Vegetable Association to  focus specifically on ag-transport issues and concerns with participants from Florida Citrus Mutual, Florida Cattlemen’s Association, the Florida Trucking Association, Florida Highway Patrol, Florida Dept of AG Law Enforcement, and Federal Motor Carrier Safety Administration.  The afternoon session focuses on general freight issues with the same participants plus other offices within FDOT, the FBI, local Sheriff’s Departments, Florida Department of Law Enforcement, representatives from trucking companies/carriers and other industry segments from across the district and beyond.

Documents & Publications

Studies & Reports

Title Type Size
Concrete Intersection Report 2021_FINAL pdf 31386 KB DownloadConcrete Intersection Report 2021_FINAL
Piney Point NA 2020 Final pdf 49944 KB DownloadPiney Point NA 2020 Final
ARTIDA Report Final 11222020 pdf 409150 KB DownloadARTIDA Report Final 11222020
Freight-Activity-Center-Connector-Definition-and-Evaluation-Tech-Memo_2019 pdf 3404 KB DownloadFreight-Activity-Center-Connector-Definition-and-Evaluation-Tech-Memo_2019
Freight-Activity-Center-Connector-Definition-and-Evaluation-Tech-Memo-Appendix-A_2019 pdf 23575 KB DownloadFreight-Activity-Center-Connector-Definition-and-Evaluation-Tech-Memo-Appendix-A_2019
Freight-Activity-Center-Connector-Definition-and-Evaluation-Tech-Memo-Appendix-B_2019 pdf 41869 KB DownloadFreight-Activity-Center-Connector-Definition-and-Evaluation-Tech-Memo-Appendix-B_2019
Freight-Activity-Center-Connector-Definition-and-Evaluation-Tech-Memo-Appendix-C_2019 pdf 45646 KB DownloadFreight-Activity-Center-Connector-Definition-and-Evaluation-Tech-Memo-Appendix-C_2019
Port Manatee Site Utilization and Network Analysis Study Final Report_April 2019 pdf 13344 KB DownloadPort Manatee Site Utilization and Network Analysis Study Final Report_April 2019
District One Highway Rail Grade Sep_GIS Suitability Model_Ph II_Final_Jan2019 pdf 23635 KB DownloadDistrict One Highway Rail Grade Sep_GIS Suitability Model_Ph II_Final_Jan2019
Ag Shifts and Transportation Impacts Analysis_Oct 2017 pdf 2869 KB DownloadAg Shifts and Transportation Impacts Analysis_Oct 2017

Working Groups



Stakeholder Forums