GPS & Cable Mapping
The GPS & Cable Mapping course is a critical
course because data quality begins with the
people responsible for verifying and documenting
the current as-built condition so it can be
properly modeled in the ITS Facility Management
(ITSFM) system.
The course is designed to train a three-person crew through classroom and hands-on exercises developed from lessons learned across the state. The crew consists of a Crew Chief, GPS and cable technicians dedicated to tracing cables and mapping or “as-build” the ITS to determine its condition and actual installed location (Lat/Long), material make-up, quantities and configuration for input into the ITSFM.
The crew should be tasked by the District or Regional Partner to as-built map many miles of outside plant infrastructure supporting the ITS so the crew can master the process.
2025 Lettings
GPS & Cable Mapping
The GPS & Cable Mapping course is a critical
course because data quality begins with the
people responsible for verifying and documenting
the current as-built condition so it can be
properly modeled in the ITS Facility Management
(ITSFM) system.
The course is designed to train a three-person crew through classroom and hands-on exercises developed from lessons learned across the state. The crew consists of a Crew Chief, GPS and cable technicians dedicated to tracing cables and mapping or “as-build” the ITS to determine its condition and actual installed location (Lat/Long), material make-up, quantities and configuration for input into the ITSFM.
The crew should be tasked by the District or Regional Partner to as-built map many miles of outside plant infrastructure supporting the ITS so the crew can master the process.
2025 Award & Posting / Bid Tabulations
GPS & Cable Mapping
The GPS & Cable Mapping course is a critical
course because data quality begins with the
people responsible for verifying and documenting
the current as-built condition so it can be
properly modeled in the ITS Facility Management
(ITSFM) system.
The course is designed to train a three-person crew through classroom and hands-on exercises developed from lessons learned across the state. The crew consists of a Crew Chief, GPS and cable technicians dedicated to tracing cables and mapping or “as-build” the ITS to determine its condition and actual installed location (Lat/Long), material make-up, quantities and configuration for input into the ITSFM.
The crew should be tasked by the District or Regional Partner to as-built map many miles of outside plant infrastructure supporting the ITS so the crew can master the process.
Other Letting Information
Letting and Posting Dates Schedule
Technical Review and Awards Committee Meeting Notices
Additional General Letting Documentation
Fixed Capital Outlay (FCO) Projects
Construction Manager / General Contractor Projects
Performance Bonds can be found in the appropriate Contract Document on the FACTS website: https://facts.fldfs.com/
Previous Lettings
2024 Letting Information: Letting, Project, Addenda, Award & Posting Information
2023 Letting Information: Letting, Project, Addenda, Award & Posting Information
2022 Letting Information: Letting, Project, Addenda, Award & Posting Information
2021 Letting Information: Letting, Project, Addenda, Award & Posting Information
2020 Letting Information: Letting, Project, Addenda, Award & Posting Information
2019 Letting Information: Letting, Project, Addenda, Award & Posting Information
2018 Letting Information: Letting, Project, Addenda, Award & Posting Information
Addenda & Amendments
Contractors will be notified of all Amendments and are required to download the Amendments from the CPP Online Ordering System per these instructions: Amendment Instructions (PDF)
Amendment files can be downloaded by clicking on the links. Amendments must be downloaded to the location of your original EBS file prior to preparing the bid.
If you do not have Acrobat Reader you can download it free at Get Acrobat Reader.
GPS & Cable Mapping
The GPS & Cable Mapping course is a critical
course because data quality begins with the
people responsible for verifying and documenting
the current as-built condition so it can be
properly modeled in the ITS Facility Management
(ITSFM) system.
The course is designed to train a three-person crew through classroom and hands-on exercises developed from lessons learned across the state. The crew consists of a Crew Chief, GPS and cable technicians dedicated to tracing cables and mapping or “as-build” the ITS to determine its condition and actual installed location (Lat/Long), material make-up, quantities and configuration for input into the ITSFM.
The crew should be tasked by the District or Regional Partner to as-built map many miles of outside plant infrastructure supporting the ITS so the crew can master the process.