Will a noise wall be constructed?
To address potential increased traffic noise, a noise study will be conducted during the PD&E Study phase for this project. This study will evaluate the existing and projected noise levels and will determine if noise walls are feasible and cost reasonable in reducing noise levels for noise sensitive sites. The final determinations concerning noise abatement are based on the contract plans developed during final design. Results (potential noise wall locations) from the noise study conducted during the PD&E phase will be shown at the Public Hearing.
2025 Lettings
Will a noise wall be constructed?
To address potential increased traffic noise, a noise study will be conducted during the PD&E Study phase for this project. This study will evaluate the existing and projected noise levels and will determine if noise walls are feasible and cost reasonable in reducing noise levels for noise sensitive sites. The final determinations concerning noise abatement are based on the contract plans developed during final design. Results (potential noise wall locations) from the noise study conducted during the PD&E phase will be shown at the Public Hearing.
2025 Award & Posting / Bid Tabulations
Will a noise wall be constructed?
To address potential increased traffic noise, a noise study will be conducted during the PD&E Study phase for this project. This study will evaluate the existing and projected noise levels and will determine if noise walls are feasible and cost reasonable in reducing noise levels for noise sensitive sites. The final determinations concerning noise abatement are based on the contract plans developed during final design. Results (potential noise wall locations) from the noise study conducted during the PD&E phase will be shown at the Public Hearing.
Other Letting Information
Letting and Posting Dates Schedule
Technical Review and Awards Committee Meeting Notices
Additional General Letting Documentation
Fixed Capital Outlay (FCO) Projects
Construction Manager / General Contractor Projects
Performance Bonds can be found in the appropriate Contract Document on the FACTS website: https://facts.fldfs.com/
Previous Lettings
2024 Letting Information: Letting, Project, Addenda, Award & Posting Information
2023 Letting Information: Letting, Project, Addenda, Award & Posting Information
2022 Letting Information: Letting, Project, Addenda, Award & Posting Information
2021 Letting Information: Letting, Project, Addenda, Award & Posting Information
2020 Letting Information: Letting, Project, Addenda, Award & Posting Information
2019 Letting Information: Letting, Project, Addenda, Award & Posting Information
2018 Letting Information: Letting, Project, Addenda, Award & Posting Information
Addenda & Amendments
Contractors will be notified of all Amendments and are required to download the Amendments from the CPP Online Ordering System per these instructions: Amendment Instructions (PDF)
Amendment files can be downloaded by clicking on the links. Amendments must be downloaded to the location of your original EBS file prior to preparing the bid.
If you do not have Acrobat Reader you can download it free at Get Acrobat Reader.
Will a noise wall be constructed?
To address potential increased traffic noise, a noise study will be conducted during the PD&E Study phase for this project. This study will evaluate the existing and projected noise levels and will determine if noise walls are feasible and cost reasonable in reducing noise levels for noise sensitive sites. The final determinations concerning noise abatement are based on the contract plans developed during final design. Results (potential noise wall locations) from the noise study conducted during the PD&E phase will be shown at the Public Hearing.