File Name | Special Provisions | Usage Note |
SP0020100BDI | PROPOSAL REQUIREMENTS AND CONDITIONS (BUSINESS DEVELOPMENT INITIATIVE) (REV 4-21-16) (FA 4-21-16) (7-22) | Use with the approval of the District Program Management Office. Use with SP0030201BDI, SP0071302BDI and SP0080100BDI. |
SP0020400 | PROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK (REV 6-16-21) (FA 8-2-21)(7-22) | All Jobs (Add a phone number or email address) Do not use withSP0020400-60day. |
SP0020400-60day | PROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK (60 DAY AD) (REV 6-16-21) (FA 8-2-21) (7-22) | Jobs with 60-day Ads. (Add a phone number or email address) Do not use withSP0020400. |
SP0020501AB | PROPOSAL REQUIREMENTS AND CONDITIONS - PREPARATION OF PROPOSALS (A+B BIDDING) (REV 6-22-04) (FA 7-13-04) (7-22) | A+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0030100AB, SP0030203AB, SP0080701AB and SP0081300AB. |
SP0020501LR | PROPOSAL REQUIREMENTS AND CONDITIONS - PREPARATION OF PROPOSALS (LANE RENTAL) (REV 2-21-05) (FA 3-31-05) (7-22) | Lane Rental. Use with the approval of the District Construction Engineer. Use with SP0030100LR, SP0081300LRDR and SP0081300LR. |
SP0030100 | AWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS - SCOPE ALTERNATES (REV 11-3-15) (FA 11-20-15) (7-22) | Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions. *Notify Contracts Office on Transmittal Memo. |
SP0030100AB | AWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (A+B BIDDING) (REV 11-5-97) (FA 1-20-98) (7-22) | A+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030203AB, SP0080701AB and SP0081300AB. |
SP0030100BC | AWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (BUDGETARY CONSTRAINTS) (REV 11-3-15) (FA 11-20-15) (7-22) | Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions. *Notify the Contracts Administration Office on the Transmittal Memo. |
SP0030100LR | AWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (LANE RENTAL) (REV 11-3-15) (FA 11-20-15) (7-22) | Lane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0081300LR and SP0081300LRDR. |
SP0030100LS | AWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (LUMP SUM) (REV 8-1-00) (7-22) | Lump Sum Projects. |
SP0030200 | AWARD AND EXECUTION OF CONTRACT (TIMEFRAME MODIFICATION) (REV 3-2-17) (FA 4-27-17) (7-22) | Use when modifying the “Award and Execution” timeframes in the Standard Specifications. *Contracts Office must approve. |
SP0030201BDI | AWARD AND EXECUTION OF CONTRACT (BUSINESS DEVELOPMENT INITIATIVE) (REV 10-3-19) (FA 11-25-19) (7-22) | Use with the approval of the District Program Management Office. Use with SP0020100BDI, SP0071302BDI, and SP0080100BDI. |
SP0030203AB | AWARD AND EXECUTION OF CONTRACT - AWARD OF CONTRACTS (A+B BIDDING) (REV 8-22-96) (FA 9-3-96) (7-22) | A+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030100AB, SP0080701AB, and SP0081300AB. |
SP0030900 | AWARD AND EXECUTION OF CONTRACT - PUBLIC RECORDS (REV 10-17-16) (FA 10-24-16)(7-22) | All Jobs. |
SP0040100 | SCOPE OF THE WORK - INTENT OF CONTRACT (REV 10-25-21) (FA 1-26-22) (7-22) | All Jobs, excluding Lump Sum. |
SP0040100LS | SCOPE OF THE WORK (LUMP SUM) (REV 6-3-16) (FA 6-9-16) (7-22) | All Lump Sum Projects. |
SP0050101LS | CONTROL OF THE WORK (LUMP SUM) (REV 3-15-02) (7-22) | Lump Sum Projects. |
SP0060100LS | CONTROL OF MATERIALS - ACCEPTANCE CRITERIA (LUMP SUM) (REV 8-17-09) (FA 8-24-09) (7-22) | Lump Sum Projects. |
SP0070101 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED (COMPLIANCE WITH FHWA 1273) (REV 1-2-14) (1-16-14) (7-22) | Use on all Federal Aid Jobs. |
SP0070101-722 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED (COMPLIANCE WITH FHWA-1273) | Implemented by Mandatory No. 1. Use in all Federal Aid jobs with lettings from September 1, 2022 and later. |
SP0070104-1 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (BEAR) (REV 6-6-17) (FA 6-13-17) (7-22) | Use when called for by the District Environmental Permit Office (Bear) |
SP0070104-2 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (BALD EAGLE) (REV 6-3-24) (FA 8-27-24) (7-22) | Use when called for by the District Environmental Permit Office ( Bald Eagle) |
SP0070104-3 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (GOPHER TORTOISE) (REV 6-15-17) (FA 6-20-17) (7-22) | Use when called for by the District Environmental Permit Office (Gopher Tortoise) |
SP0070104-4 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (MANATEE) (REV 5-13-20) (FA 6-29-20)(7-22) | Use when called for by the District Environmental Permit Office (Manatee) |
SP0070104-5 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SMALLTOOTH SAWFISH) (REV 10-21-21) (FA 1-6-22) (7-22) | Use when called for by the District Environmental Permit Office (Smalltooth Sawfish) |
SP0070104-6 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SEA TURTLE) (REV 10-21-21) (FA 1-6-22) (7-22) | Use when called for by the District Environmental Permit Office (Sea Turtle) |
SP0070104-7 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (INDIGO SNAKE) (REV 5-25-17) (FA 6-13-17) (7-22) | Use when called for by the District Environmental Permit Office (Indigo Snake) |
SP0070104-8 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (STURGEON) (REV 6-24-20) (FA 8-24-20)(7-22) | Use when called for by the District Environmental Permit Office (Sturgeon) |
SP0070104-9 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SEAGRASS BEDS) (REV 10-3-18) (FA 12-11-18) (7-22) | Used when called for by the District Environmental Permit Office (Seagrass Beds) |
SP0070104-10 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (FDOT INSTALLED BAT EXCLUSIONS) (REV 7-11-23) (FA 11-6-23) (7-22) | Used when called for by the District Environmental Permit Office (Bats) |
SP0070104-11 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (BATS IN BRIDGES) (REV 12-7-18) (12-11-18) (7-22) | Used when called for by the District Environmental Permit Office (Bats in Bridges) |
SP0070104-12 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC – LAWS TO BE OBSERVED – COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SCRUB-JAYS) (REV 5-14-20) (FA 7-7-20)(7-22) | Use when called for by the District Environmental Permit Office (Scrub-Jays) |
SP0070201A | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PERMITS AND LICENSES (PERMITS PROCURED BY THE DEPARTMENT). (REV 11-10-16) (FA 1-26-17) (7-22) | Jobs with permits procured by DOT. |
SP0071101-tolls | LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY (TOLL FACILITIES) (REV 7-22-14) (FA 10-15-14) (7-22) | Use with the approval of the District Traffic Operations Engineer. |
SP0071105FGT | LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - FLORIDA GAS TRANSMISSION COMPANY, LLC (FGT) FACILITIES (REV 4-6-16) (FA 4-20-16) (7-22) | Use when Florida Gas Transmission Company, LLC (FGT) is within the project limits. Use with SP0071201FGT. |
SP0071153A | LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - UTILITY ADJUSTMENTS (NO UTILITY WORK SCHEDULE) (REV 2-10-94) (7-22) | When there are no utility work schedules. |
SP0071153B | LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - UTILITY ADJUSTMENTS (UTILITY WORK SCHEDULES) (REV 1-26-22) (FA 2-3-22) (7-22) | When there are utility work schedules. |
SP0071201FGT | LEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC (FLORIDA GAS TRANSMISSION (FGT) COMPANY, LLC ENCROACHMENT AGREEMENTS) (REV 7-28-15) (FA 7-31-15) (7-22) | Use when Florida Gas Transmission Company, LLC (FGT) is within the project limits. Use with SP0071105FGT. |
SP0071302BDI | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - INSURANCE - COMMERCIAL GENERAL LIABILITY INSURANCE (BUSINESS DEVELOPMENT INITIATIVE) (REV 4-10-15) (FA 7-31-15) (7-22) | Use with the approval of the District Program Management Office. Use with SP0020100BDI, SP0030201BDI, and SP0080100BDI. |
SP0071303 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC -CSXT RAILROAD INSURANCE REQUIREMENTS (REV 5-4-20) (FA 8-24-20) (7-22) | When requested by the District Rail Office. |
SP0071600 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WAGE RATES FOR FEDERAL-AID PROJECTS (REV 9-26-22) (FA 10-31-17) (7-22) | All Federal Aid Jobs. |
SP0072700 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS (REV 4-25-02) (FA 7-17-02) (7-22) | Non-Federal Aid Projects. |
SP0072800 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PREFERENCE TO STATE RESIDENTS (REV 1-13-12)(7-22) | Non-Federal Aid Projects. Construction Projects Only. |
SP0072900 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - E-VERIFY (REV 6-13-11) (FA 6-16-11) (7-22) | All Jobs. |
SP0073000 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - SCRUTINIZED COMPANIES (REV 3-22-18) (7-22) | All Jobs. |
SP0073100 | LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - TITLE VI ASSURANCE - DOT 1050.2, APPENDIX A and APPENDIX E (REV 5-27-16) (FA 6-2-16) (7-22) | All Federally Funded Jobs. |
SP0080100BDI | PROSECUTION AND PROGRESS - SUBLETTING OR ASSIGNING OF CONTRACTS (BUSINESS DEVELOPMENT INITIATIVE) (REV 4-21-15) (FA 7-13-15) (7-22) | Use with the approval of the District Program Management Office. Use with SP0020100BDI, SP0030201BDI, and SP0071302BDI. |
SP0080302A | PROSECUTION AND PROGRESS - PROSECUTION OF WORK (SUBMISSION OF WORKING SCHEDULE) (REV 5-20-21) (FA 7-7-21) (7-22) | Use only when CPM is authorized by District Construction Engineer. |
SP0080303A | PROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (FLEXIBLE START TIME) (REV 3-2-17) (FA 4-27-17) (7-22) | When called for by the District Construction Engineer or the District Maintenance Engineer/Administrator. *Contracts Office must be notified. |
SP0080303B | PROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (NOTICE TO PROCEED) (REV 3-2-17) (FA 4-27-17) (7-22) | When called for by the District Construction Engineer. Use with the approval of the Director, Office of Construction. |
SP0080303C | PROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (MANDATORY START DATE) (REV 3-2-17) (FA 4-27-17) (7-22) | When called for by the District Construction Engineer. Use with the approval of the Director, Office of Construction. *Contracts Office must be notified. |
SP0080306 | PROSECUTION AND PROGRESS - PROSECUTION OF WORK - PARTNERING (REV 6-1-23) (FA 10-18-23) (7-22) | Jobs with 999-16 Pay Items *Contracts Office must be notified. |
SP0080307DRB | PROSECUTION AND PROGRESS - PROSECUTION OF WORK - DISPUTES REVIEW BOARD (REV 3-1-24) (FA 3-13-24) (7-22) | Jobs with 999-20 Pay Items *Contracts Office must be notified. |
SP0080307RDRB | PROSECUTION AND PROGRESS - PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD (REV 3-1-24) (FA 3-13-24) (7-22) | Jobs without 999-20 Pay Items. |
SP0080308SDRB | PROSECUTION AND PROGRESS - PROSECUTION OF WORK - STATEWIDE DISPUTES REVIEW BOARD (REV 3-1-24) (FA 3-13-24) (7-22) | Jobs with 334, 337, 350, 570 or 649 Pay Items. |
SP0080401LS | PROSECUTION AND PROGRESS – COMPUTATION OF CONTRACT TIME – ADJUSTING CONTRACT TIME – INCREASED WORK (LUMP SUM) (REV 8-1-00) (7-22) | Lump Sum Projects |
SP0080401 | PROSECUTION AND PROGRESS – LIMITATIONS OF OPERATIONS – NIGHT WORK ALONG COASTAL ROADS (REV 4-8-19) (FA 7-22-19) (7-22) | Use when requested by the District Environmental Office |
SP0080408 | PROSECUTION AND PROGRESS - LIMITATIONS OF OPERATIONS - FENCING (REV 6-17-04) (FA 7-13-04) (7-22) | Jobs on Limited Access Highways |
SP0080409 | PROSECUTION AND PROGRESS - LIMITATIONS OF OPERATIONS - CONTAMINATED MATERIAL (MERCURY-CONTAINING DEVICES AND LAMPS) (REV 11-6-95) (FA 12-27-95)(7-22) | Jobs with Lighting |
SP0080604 | PROSECUTION AND PROGRESS - SUSPENSION OF CONTRACTOR'S OPERATIONS - SPECIAL EVENTS (REV 5-21-21) (FA 1-3-22) (7-22) | Use on jobs with Special Events. |
SP0080701A | PROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (REDUCED PRODUCTIVITY) (REV 12-22-98) (FA 1-19-99) (7-22) | Use with approval of the District Construction Engineer. |
SP0080701AB | PROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (A+B BIDDING) (REV 7-24-96) (FA 9-3-96) (7-22) | A+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030100AB, SP0030203AB, and SP0081300AB. |
SP0080701B | PROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (SHORTENED CONTRACT TIME) (REV 2-14-94) (7-22) | Use with the approval of the Director, Office of Construction. |
SP0080701C | PROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (HIGHER PRODUCTION RATES) (REV 12-22-98) (FA 2-1-99) (7-22) | Use when requested by the District Construction Engineer. |
SP0081000 | PROSECUTION AND PROGRESS - LIQUIDATED DAMAGES FOR FAILURE TO COMPLETE THE WORK (REV 5-4-23) (FA 9-21-23) (7-22) | Use on all revenue producing projects. |
SP0081200 | PROSECUTION AND PROGRESS - DAMAGE RECOVERY (REV 8-7-17) (7-22) | Use when requested by the District Construction Engineer. (Do not use with Lane Rental) |
SP0081300A | PROSECUTION AND PROGRESS - ALTERNATIVE BIDDING (REV 7-28-97) (7-22) | All Jobs with Alternative Bidding. Use with the approval of the District Construction Engineer. |
SP0081300AB | 8-13. INCENTIVE - DISINCENTIVE FOR A+B (REV 7-27-04) (FA 7-28-04) (7-22) | A+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030100AB, SP0030203AB, and SP0080701AB. |
SP0081300ABB | 8-13. "BONUS" PAYMENT AND WAIVER OF CONTRACTOR CLAIMS (REV 5-19-04) (FA 7-13-04) (7-22) | A+B Jobs with Bonus. Use with the approval of the District Construction Engineer. |
SP0081300B | 8-13. " BONUS " PAYMENT AND WAIVER OF CONTRACTOR CLAIMS (REV 7-27-04) (FA 7-28-04) (7-22) | Bonus (Date Specific) Use with the approval of the District Construction Engineer. |
SP0081300BCD | 8-13. "BONUS" PAYMENT AND WAIVER OF CONTRACTOR CLAIMS (REV 7-27-04) (FA 7-28-04) (7-22) | Bonus (Calendar Days) Use with the approval of the District Construction Engineer. |
SP0081300ID | 8-13. INCENTIVE - DISINCENTIVE (REV 7-27-04) (FA 7-28-04) (7-22) | Incentive - Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300MID. |
SP0081300IDLR | 8-13. INCENTIVE - DISINCENTIVE FOR LANE RENTAL DAYS (REV 9-25-03) (FA 12-24-03) (7-22) | Incentive-Disincentive for Lane Rental Days. Use with the approval of the District Construction Engineer. Do not use with SP0081300LR or SP0081300LRDR. |
SP0081300LQS | 8-13. LIQUIDATED SAVINGS FOR EARLY COMPLETION (REV 5-18-99) (FA 6-10-99) (7-22) | Liquidated Savings. Use with the approval of the District Construction Engineer. |
SP0081300LR | 8-13. PAY ADJUSTMENT FOR FEWER-MORE LANE RENTAL DAYS (REV 4-29-97) (FA 5-7-97) (7-22) | Lane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR, and SP0081300LRDR. |
SP0081300LRDR | 8-13. DAMAGE RECOVERY (REV 9-25-03) (FA 12-24-03) (7-22) | Lane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR, and SP0081300LR. |
SP0081300MB | 8-13. “BONUS” PAYMENT AND WAIVER OF CONTRACTOR CLAIMS (REV 4-12-06) (FA 4-25-06)(7-22) | Milestone Bonus. Use with the approval of the District Construction Engineer. Do not use with SP0081300B or SP0081300BCD. |
SP0081300MID | 8-13. INCENTIVE - DISINCENTIVE (REV 2-9-06) (FA 4-25-06) (7-22) | Milestone Incentive-Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300ID. |
SP0090103LS | MEASUREMENT AND PAYMENT (LUMP SUM) (REV 7-1-21) (FA 7-28-21) ((7-22) | Lump Sum Projects. |
SP1010000LS | MOBILIZATION (LUMP SUM) (REV 10-17-19) (FA 11-25-19) (7-22) | Lump Sum Projects. |
SP1100601 | CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES - GENERAL (REV 9-10-07) (FA 2-15-08) (7-22) | Use with approval of the District Construction Engineer and signed Agreement from the Local Agency receiving the material. |
SP1100606 | CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES - ASBESTOS CONTAINING MATERIALS (ACM) IDENTIFIED PRIOR TO THE WORK (REV 11-10-16) (FA 1-26-17) (7-22) | Use when areas of Asbestos Abatement are identified in the Plans. |
SP1101107 | CLEARING AND GRUBBING (MATERIAL FOR REEF ESTABLISHMENT) (REV 7-10-95) (FA 6-21-99) (7-22) | Jobs with 110-84 Pay Item. |
SP1200100A | EXCAVATION AND EMBANKMENT - DESCRIPTION - IDENTIFIED AREAS OF CONTAMINATION (REV 11-10-16) (FA 1-26-17) (7-22) | Use when contaminated areas are delineated in the Plans. |
SP3270100 | MILLING OF EXISTING ASPHALT PAVEMENT - STOCKPILING (REV 8-17-22) (FA 2-14-00) (7-22) | When the Plans provide a location for stockpiling milled material. Insert quantity to be retained. Use "all, tons, square yards", etc. (Insert Information Required) |
SP3270200 | MILLING OF EXISTING ASPHALT PAVEMENT - EQUIPMENT (REV 12-1-93) (7-22) | Use when requested by the district Construction Engineer. |
SP3270301 | MILLING OF EXISTING ASPHALT PAVEMENT - STRUCTURAL PAVE BACK (REV 8-17-22) (FA 12-30-19) (7-22) | Use with approval from the District Construction Engineer. Requires paving back a lift of structural asphalt before opening to traffic. |
SP3300802 | HOT MIX ASPHALT - GENERAL CONSTRUCTION REQUIREMENTS (REV 2-22-18) (FA 2-22-18) (7-22) | Use on all interstate and limited access asphalt pavement roadway projects. |
SP3340203 | SUPERPAVE ASPHALT CONCRETE - CORING DATA (REV 5-4-21) (FA 7-14-21) (7-22) | Use on projects with available coring data. |
SP3500200 | CEMENT CONCRETE PAVEMENT (COLORED CONCRETE) (REV 5-11-16) (FA 5-12-16) (7-22) | Use when the Plan pay item 350-30 is included or colored structural concrete is included. |
SP4570000 | NTEGRAL PILE AND COLUMN JACKETS (REV 11-22-19) (FA 1-27-20) (7-22)
| Jobs with 457 Pay Items |
SP5800000 | LANDSCAPING (REV 10-30-19) (FA 1-7-20) (7-22) | Non-Federal Aid Jobs with Landscaping. Use when requested by the DDE. |
SP5800000FA | LANDSCAPING (REV 5-11-21) (FA 7-14-21) (7-22) | All Federal Aid Jobs with Landscaping. Use when requested by the DDE. |
SP5810000 | TREE AND PALM RELOCATION - CONSTRUCTION (REV 7-13-21) (FA 7-14-21) (7-22) | Jobs with Tree and Palm Relocation. |
SP6390100CIAC | ELECTRICAL POWER SERVICE ASSEMBLIES - DESCRIPTION (Contribution-in-Aid-of Construction) (REV 6-12-18) (FA 7-2-18) (7-22) | Use with approval of the District Utility Administrator. (Insert Information Required) |
SP6870000 | HIGHWAY ADVISORY RADIO (REV 10-16-15) (FA 12-31-15) (7-22) | Use with the approval of the Chief Engineer. |
Supplemental Spec Name | Supplemental Specifications | Usage Note |
SS1020300 | MAINTENANCE OF TRAFFIC (REV 8-17-22) (10-22)
| Implemented by Mandatory No.2. Use on all Construction Jobs with lettings from October 1, 2022, and later. |
SS1050803 | CONTRACTOR QUALITY CONTROL GENERAL REQUIREMENTS (REV 8-17-22) (10-22) | Implemented by Mandatory No.2. Use on all Construction Jobs with lettings from October 1, 2022, and later. |
SS1021113 | MAINTENANCE OF TRAFFIC (REV 2-17-22) (FA 9-9-22) (1-23) | Implemented by Mandatory No.3. Use on all Jobs with letting from January 1, 2023, and later. |
SS0060103 | CONTROL OF MATERIALS (REV 12-5-22) (FA 12-5-22) (1-23) | Implemented by Mandatory No.4. Use on all Construction, LAP, and Federally Funded Maintenance Jobs from January 1, 2023, and later. |
TSP Name | TECHNICAL SPECIAL PROVISIONS | Usage Note |
XTSPs | The following Technical Special Provisions are individually signed and sealed but are included as part of this Specifications Package. | Jobs with Technical Special Provisions (TSPs). |
|