Effective July - December 2019

Special Provisions -Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.
Supplemental Specifications - Additions or revisions to the Standard Specifications.
Mandatory Revisions - Critical modifications implemented and added to the Workbook.

 File NameSpecial ProvisionsUsage Note
SP0020100BDIPROPOSAL REQUIREMENTS AND CONDITIONS (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-21-16) (FA 4-21-16) (7-19)
Changes to: 2-1, 2-7.
Use with the approval of the District Program Management Office.
Use with SP0030201BDI, SP0071302BDI and SP0080100BDI.
SP0020400PROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK.
(REV 11-3-15) (FA 1-27-16) (7-19)
Insert Information Required.
Changes to: 2-4.
All Jobs (Add a phone number or email address)
Do not use withSP0020400-60day.
SP0020400-60dayPROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK (60 DAY AD).
(REV 6-16-21) (FA 8-2-21) (FY 2025-26)
Jobs with 60-day Ads. (Add a phone number or email address)
Do not use withSP0020400.
SP0020501ABPROPOSAL REQUIREMENTS AND CONDITIONS - PREPARATION OF PROPOSALS (A+B BIDDING).
(REV 6-22-04) (FA 7-13-04) (7-19)
Changes to: 2-5.1.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0030100AB, SP0030203AB, SP0080701AB and SP0081300AB.
SP0020501LRPROPOSAL REQUIREMENTS AND CONDITIONS - PREPARATION OF PROPOSALS (LANE RENTAL).
(REV 2-21-05) (FA 3-31-05) (7-19)
Insert Information Required.
Changes to: 2-5.1.
Lane Rental. Use with the approval of the District Construction Engineer.
Use with SP0030100LR, SP0081300LRDR and SP0081300LR.
SP0030100AWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS - SCOPE ALTERNATES.
(REV 11-3-15) (FA 11-20-15) (7-19)
Changes to: 3-1.
Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
*Notify Contracts Office on Transmittal Memo.
SP0030100ABAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (A+B BIDDING).
(REV 11-5-97) (FA 1-20-98) (7-19)
Insert Information Required
Changes to: 3-1.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030203AB, SP0080701AB and SP0081300AB.
SP0030100BCAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (BUDGETARY CONSTRAINTS).
(REV 11-3-15) (FA 11-20-15) (7-19)
Insert Information Required
Changes to: 3-1.
Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
*Notify the Contracts Administration Office on the Transmittal Memo.
SP0030100LRAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (LANE RENTAL).
(REV 11-3-15) (FA 11-20-15) (7-19)
Changes to: 3-1.
Lane Rental. Use with the approval of the District Construction Engineer.
Use with SP0020501LR, SP0081300LR and SP0081300LRDR.
SP0030100LSAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (LUMP SUM).
(REV 8-1-00) (7-19)
Changes to: 3-1.
Lump Sum Projects.
SP0030200AWARD AND EXECUTION OF CONTRACT (TIMEFRAME MODIFICATION).
(REV 3-2-17) (FA 4-27-17) (7-19)
Insert Information Required
Changes to: 3-2, 3-6, 3-7.
Use when modifying the “Award and Execution” timeframes in the Standard Specifications.
*Contracts Office must approve.
SP0030201BDIAWARD AND EXECUTION OF CONTRACT (BUSINESS DEVELOPMENT INITIATIVE).
(REV 5-13-15) (FA 7-13-15)(7-19)
Changes to: 3-2.1, 3-2.2, 3-6, 3-7.
Use with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0071302BDI, and SP0080100BDI.
SP0030203ABAWARD AND EXECUTION OF CONTRACT - AWARD OF CONTRACTS (A+B BIDDING)
(REV 8-22-96) (FA 9-3-96) (7-19)
Insert Information Required
Changes to: 3-2.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030100AB, SP0080701AB, and SP0081300AB.
SP0030900AWARD AND EXECUTION OF CONTRACT - PUBLIC RECORDS
(REV 10-17-16) (FA 10-24-16 ) (7-19)
Changes to: 3-9.
All Jobs.
SP0040100SCOPE OF THE WORK - INTENT OF CONTRACT.
(REV 8-19-09) (FA 8-24-09) (7-19)
Insert Information Required.
Changes to: 4-1.
All Jobs, excluding Lump Sum.
SP0040100LSSCOPE OF THE WORK (LUMP SUM).
(REV 6-3-16) (FA 6-9-16) (7-19)
Insert Information Required.
Changes to: 4-1, 4-3.1, 4-3.4, 4-3.9.4.
All Lump Sum Projects.
SP0050101LSCONTROL OF THE WORK (LUMP SUM).
(REV 3-15-02) (7-19)
Changes to: 5-1.1, 5-2, 5-7.6.
Lump Sum Projects.
SP0050901CONTROL OF THE WORK - GENERAL INSPECTION REQUIREMENTS - COOPERATION BY THE CONTRACTOR.
(REV 2-10-94) (7-19)
Changes to: 5-9.1
Long bridge jobs (1500 feet or longer); modify to suit.
SP0060100LSCONTROL OF MATERIALS - ACCEPTANCE CRITERIA (LUMP SUM).
(REV 8-17-09) (FA 8-24-09) (7-19)
Changes to: 6-1.
Lump Sum Projects.
SP0070101LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED (COMPLIANCE WITH FHWA 1273).
(REV 1-2-14) (1-16-14) (7-19)
Changes to: 7-1.1.
Use on all Federal Aid Jobs.
SP0070104-1LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (BEAR).
(REV 6-6-17) (FA 6-13-17) (7-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Bear)
SP0070104-2LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (EAGLE).
(REV 6-16-17) (FA 6-28-17) (7-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Eagle)
SP0070104-3LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (GOPHER TORTOISE).
(REV 6-15-17) (FA 6-20-17) (7-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Gopher Tortoise)
SP0070104-4LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (MANATEE).
(REV 6-15-17) (FA 6-20-17) (7-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Manatee)
SP0070104-5LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SAWFISH).
(REV 5-25-17) (FA 6-13-17) (7-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Sawfish)
SP0070104-6LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SEA TURTLE).
(REV 5-25-17) (FA 6-28-17) (7-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Sea Turtle)
SP0070104-7LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (INDIGO SNAKE).
(REV 5-25-17) (FA 6-13-17) (7-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Indigo Snake)
SP0070104-8LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (STURGEON).
(REV 5-25-17) (FA 6-28-17) (7-19)

Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Sturgeon)
SP0070104-9LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SEAGRASS BEDS)
(REV 10-3-18) (FA 12-11-18) (7-19)

Changed to: 7-1.4.
Used when called for by the District Environmental Permit Office (Seagrass Beds)
SP0070104-10LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (BATS)
(REV 12-7-18) (FA 1-4-19) (7-19)

Changed to: 7-1.4.
Used when called for by the District Environmental Permit Office (Bats) 
SP0070104-11LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (BATS IN BRIDGES) 
(REV 12-7-18) (12-11-18) (7-19)
Changed to: 7-1.4.
Used when called for by the District Environmental Permit Office (Bats in Bridges)
SP0070201ALEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PERMITS AND LICENSES (PERMITS PROCURED BY THE DEPARTMENT).
(REV 11-10-16) (FA 1-26-17) (7-19)
Changes to: 7-2.1.
Jobs with permits procured by DOT.
SP0070202LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S., WATERS OF THE U.S. AND WATERS OF THE STATE (DISCHARGE TO).
(REV 6-9-15) (FA 7-22-15) (7-19)

Changes to: 7-2.2.
When SWPPP is used. (One or more acres disturbed.)
SP0071101-tollsLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY (TOLL FACILITIES).
(REV 7-22-14) (FA 10-15-14) (7-19)
Changes to: 7-11.1, 7-11.2.
Use with the approval of the District Traffic Operations Engineer.
SP0071104RRLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - OPERATIONS WITHIN THE RAILROAD RIGHT-OF-WAY.
(REV 3-11-16) (FA 8-2-16) (7-19)
Changes to: 7-11.4.
Projects involving CSX Transportation, NS, FEC, or operations within the South Florida Rail Corridor and the Central Florida Rail Corridor Right of Way
SP0071105FGTLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - FLORIDA GAS TRANSMISSION COMPANY, LLC (FGT) FACILITIES.
(REV 4-6-16) (FA 4-20-16) (7-19)
Changes to: 7-11.5.
Use when Florida Gas Transmission Company, LLC (FGT) is within the project limits.
Use with SP0071201FGT.
SP0071153ALEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - UTILITY ADJUSTMENTS (NO UTILITY WORK SCHEDULES).
(REV 2-10-94) (7-19)
Changes to: 7-11.5.3.
When there are no utility work schedules.
SP0071153BLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - UTILITY ADJUSTMENTS (UTILITY WORK SCHEDULES).
(REV 11-10-16) (FA 1-26-17) (7-19)
Changes to: 7-11.5.3.
When there are utility work schedules.
SP0071201FGTLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC (FLORIDA GAS TRANSMISSION (FGT) COMPANY, LLC ENCROACHMENT AGREEMENTS).
(REV 7-28-16) (FA 7-31-15) (7-19)
Changes to: 7-12.1, 7-13.2, 7-13.4.
Use when Florida Gas Transmission Company, LLC (FGT) is within the project limits.
Use with SP0071105FGT.
SP0071302BDILEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - INSURANCE - COMMERCIAL GENERAL LIABILITY INSURANCE (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-10-15) (FA 7-31-15) (7-19)
Changes to: 7-13.2
Use with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0030201BDI, and SP0080100BDI.
SP0071600LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WAGE RATES FOR FEDERAL-AID PROJECTS.
(REV 9-1-17) (FA 10-31-17) (7-19)
Insert Information Required.
Changes to: 7-16.
All Federal Aid Jobs
SP0072700LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS.
(REV 4-25-02) (FA 7-17-02) (7-19)
Changes to: Section 7.
Non-Federal Aid Projects.
SP0072800LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PREFERENCE TO STATE RESIDENTS.
(REV 1-13-12) (7-19)
Changes to: Section 7.
Non-Federal Aid Projects.
Construction Projects Only.
SP0072900LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - E-VERIFY.
(REV 6-13-11) (FA 6-16-11) (7-19)
Changes to: Section 7.
All Jobs.
SP0073000LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - SCRUTINIZED COMPANIES.
(REV 3-22-18) (7-19)
Changes to: Section 7.
All Jobs.
SP0073100LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - TITLE VI ASSURANCE - DOT 1050.2, APPENDIX A and APPENDIX E.
(REV 5-27-16) (FA 6-2-16) (7-19)
Changes to: Section 7.
All Federally Funded Jobs.
SP0080100BDIPROSECUTION AND PROGRESS - SUBLETTING OR ASSIGNING OF CONTRACTS (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-21-15) (FA 7-13-15) (7-19)
Changes to: 8-1.
Use with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0030201BDI, and SP0071302BDI..
SP0080302APROSECUTION AND PROGRESS - PROSECUTION OF WORK (SUBMISSION OF WORKING SCHEDULE).
(REV 1-23-14) (FA 2-11-19) (7-19)
Changes to: 8-3.2.
Use only when CPM is authorized by District Construction Engineer.
SP0080303APROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (FLEXIBLE START TIME).
(REV 3-2-17) (FA 4-27-17) (7-19)
Insert Information Required
Changes to: 8-3.3.
When called for by the District Construction Engineer or the District Maintenance Engineer/Administrator.
*Contracts Office must be notified.
SP0080303BPROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (NOTICE TO PROCEED).
(REV 3-2-17) (FA 4-27-17) (7-19)
Insert Information Required
Changes to: 8-3.3.
When called for by the District Construction Engineer.
Use with the approval of the Chief Engineer.
SP0080303CPROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (MANDATORY START DATE).
(REV 3-2-17) (FA 4-27-17) (7-19)
Insert Information Required.
Changes to: 8-3.3.
When called for by the District Construction Engineer.
Use with the approval of the Chief Engineer.
*Contracts Office must be notified.
SP0080306PROSECUTION AND PROGRESS - PROSECUTION OF WORK - PARTNERING.
(REV 5-15-12) (FA 5-21-12) (7-19)
Insert Information Required.
Changes to: 8-3.
999-16
*Contracts Office must be notified.
SP0080307DRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (7-19)

Changes to: 8-3.
99-20 Items
*Contracts Office must be notified.  SP is deleted and replaced with SP0080307DRB implemented by Man01 for 7-19.
 SP0080307DRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - DISPUTES REVIEW BOARD.
(REV 6-27-19)  (7-19)
Changes to: 8-3.
 999-20 Items
*Contracts Office must be notified. Mandatory #1.
SP0080307RDRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (7-19)
Changes to: 8-3.
Jobs with 334, 337, 350, 570 or 649 Pay Items.
SP0080308SDRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - STATEWIDE DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (7-19)

Changes to: 8-3.
334, 337, 350, 570, 580 or 649 Items
SP0080401LSPROSECUTION AND PROGRESS – COMPUTATION OF CONTRACT TIME – ADJUSTING CONTRACT TIME – INCREASED WORK (LUMP SUM).
(REV 8-1-00) (7-19)
Changes to: 8-4.1, 8-7.3.1.
Lump Sum Projects
SP0080408PROSECUTION AND PROGRESS - LIMITATIONS OF OPERATIONS - FENCING.
(REV 6-17-04) (FA 7-13-04) (7-19)
Changes to: 8-4.8.
Jobs on Limited Access Highways
SP0080409PROSECUTION AND PROGRESS - LIMITATIONS OF OPERATIONS - CONTAMINATED MATERIAL (MERCURY-CONTAINING DEVICES AND LAMPS).
(REV 11-6-95) (FA 12-27-95) (7-19)
Insert Information Required.
Changes to: 8-4.9.
Jobs with Lighting
SP0080701APROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (REDUCED PRODUCTIVITY).
(REV 12-22-98) (FA 1-19-99) (7-19)
Insert Information Required.
Changes to: 8-7.1.
Use with approval of the District Construction Engineer.
SP0080701ABPROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (A+B BIDDING).
(REV 7-24-96) (FA 9-3-96) (7-19)
Changes to: 8-7.1.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030100AB, SP0030203AB, and SP0081300AB.
SP0080701BPROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (SHORTENED CONTRACT TIME).
(REV 2-14-94) (7-19)
Insert Information Required.
Changes to: 8-7.1.
Use with the approval of the Chief Engineer.
SP0080701CPROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (HIGHER PRODUCTION RATES).
(REV 12-22-98) (FA 2-1-99) (7-19)

Changes to: 8-7.1.
Use when requested by the District Construction Engineer.
SP0081000PROSECUTION AND PROGRESS - LIQUIDATED DAMAGES FOR FAILURE TO COMPLETE THE WORK.
(REV 5-2-17) (FA 6-20-17) (7-19)
Insert Information Required.
Changes to: Section 8-10.1, 8-10-2.
Use on all revenue producing projects.
SP0081200PROSECUTION AND PROGRESS - DAMAGE RECOVERY (USER COST).
(REV 8-7-17) (7-19)
Insert Information Required.
Changes to: 8-12.
Use when requested by the District Construction Engineer.
(Do not use with Lane Rental)
SP0081300APROSECUTION AND PROGRESS - ALTERNATIVE BIDDING.
(REV 7-28-97) (7-19)
Changes to: Section 8.
All Jobs with Alternative Bidding. Use with the approval of the District Construction Engineer.
SP0081300AB8-13. Incentive - Disincentive for A+B.
(REV 7-27-04) (FA 7-28-04) (1-13)
Insert Information Required.
Changes to: 8-13.
A+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030100AB, SP0030203AB, and SP0080701AB.
SP0081300ABB8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 5-19-04) (FA 7-13-04) (1-05)
Insert Information Required.
Changes to: 8-13.
A+B Jobs with Bonus. Use with the approval of the District Construction Engineer.
SP0081300B8-13. " Bonus " Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Changes to: 8-13.
Bonus (Date Specific) Use with the approval of the District Construction Engineer.
SP0081300BCD8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Changes to: 8-13.
Bonus (Calendar Days) Use with the approval of the District Construction Engineer.
SP0081300ID8-13. Incentive - Disincentive.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Changes to: 8-13.
Incentive - Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300MID.
SP0081300IDLR8-13. Incentive - Disincentive for Lane Rental Days.
(REV 9-25-03) (FA 12-24-03) (7-04)
Insert Information Required.
Changes to: 8-13.
Incentive-Disincentive for Lane Rental Days. Use with the approval of the District Construction Engineer. Do not use with SP0081300LR or SP0081300LRDR.
SP0081300LQS8-13. Liquidated Savings for Early Completion.
(REV 5-18-99) (FA 6-10-99) (7-00)

Insert Information Required.
Changes to: 8-13.
Liquidated Savings. Use with the approval of the District Construction Engineer.
SP0081300LR8-13. Pay Adjustment For Fewer-More Lane Rental Days.
(REV 4-29-97) (FA 5-7-97) (7-00)

Changes to: 8-13.
Lane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR, and SP0081300LRDR.
SP0081300LRDR8-13. Damage Recovery.
(REV 9-25-03) (FA 12-24-03) (7-04)
Insert Information Required.
Changes to: 8-13.
Lane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR, and SP0081300LR.
SP0081300MB8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 4-12-06) (FA 4-25-06) (1-07)
Insert Information Required.
Changes to: 8-13.
Milestone Bonus. Use with the approval of the District Construction Engineer. Do not use with SP0081300B or SP0081300BCD.
SP0081300MID8-13. Incentive - Disincentive.
(REV 2-9-06) (FA 4-25-06) (1-07)
Insert Information Required.
Changes to: 8-13.
Milestone Incentive-Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300ID.
SP0090103LSMEASUREMENT AND PAYMENT (LUMP SUM).
(REV 11-4-16) (FA 1-6-17) (7-19)
Changes to: 9-1.3, 9-2, 9-3, 9-5.5.2, 9-11.
Lump Sum Projects.
SP1010000LSMOBILIZATION (LUMP SUM) 
(REV 12-13-18) (FA 1-23-19) (7-19)
Lump Sum Projects.
SP1100601CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES - GENERAL.
(REV 9-10-07) (FA 2-15-08) (7-19)
Insert Information Required.
Changes to: 110-6.1.
Use with approval of the District Construction Engineer and signed Agreement from the Local Agency receiving the material. 
SP1100606CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES - ASBESTOS CONTAINING MATERIALS (ACM) IDENTIFIED PRIOR TO THE WORK.
(REV 11-10-16) (FA 1-26-17) (7-19)
Changes to: 110-6.
Use when areas of Asbestos Abatement are identified in the Plans.
SP1101107CLEARING AND GRUBBING (MATERIAL FOR REEF ESTABLISHMENT).
(REV 7-10-95) (FA 6-21-99) (7-19)
Changes to: 110-11.7, 110-12.7.
Jobs with 110-84 Pay Item.
SP1200100AEXCAVATION AND EMBANKMENT - DESCRIPTION - IDENTIFIED AREAS OF CONTAMINATION.
(REV 11-10-16) (FA 1-26-17 ) (7-19)
Changes to: 120-1.
Use when contaminated areas are delineated in the Plans.
SP3270100MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 8-31-99) (FA 2-14-00) (7-19)
Insert Information Required.
Changes to: 327-1, 327-6.
When the Plans provide a location for stockpiling milled material. Insert quantity to be retained. Use "all, tons, square yards", etc. (Insert Information Required)
SP3270200MILLING OF EXISTING ASPHALT PAVEMENT - EQUIPMENT.
(REV 12-1-93) (7-19)
Changes to: 327-2.
Use when requested by the District.
SP3300802HOT MIX ASPHALT - GENERAL CONSTRUCTION REQUIREMENTS.
(REV 2-22-18) (FA 2-22-18) (7-19)
Changes to: 330-8.2, 330-9.4, 330-9.5.
Smooth pavement, for interstate and limited access roadway projects only.
Use with the approval of the District Construction Engineer.
SP3500200CEMENT CONCRETE PAVEMENT (COLORED CONCRETE).
(REV 5-11-16) (FA 5-12-16) (7-19)
Changes to: 350-1, 350-2, 350-10.
Jobs with Colored Concrete Pavement
SP4570000INTEGRAL PILE AND COLUMN JACKETS.
(REV 1-7-16) (FA 1-14-16) (7-19)
Changes to: 457.
457 Items
SP5800000LANDSCAPING.
(REV 1-9-19) (FA 2-12-19) (7-19)
Changes to: 580.
Non-Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
SP5800000FALANDSCAPING.
(REV 1-24-19) (FA 2-11-19) (7-19)
Changes to: 580
All Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
 SP5810000TREE AND PALM RELOCATION - CONSTRUCTION.
(REV 1-14-19) (FA 1-18-19) (7-19)
Jobs with Tree and Palm Relocation.
SP6390100CIACELECTRICAL POWER SERVICE ASSEMBLIES - DESCRIPTION (Contribution-in-Aid-of Construction).
(REV 6-12-18) (FA 7-2-18) (7-19)
Changes to 639.
Use with approval of the District Utility Administrator. (Insert Information Required)
SP6870000HIGHWAY ADVISORY RADIO.
(REV 10-16-15) (FA 12-31-15) (7-19)
Use with the approval of the Chief Engineer.
Supplemental Spec NameSupplemental SpecificationsUsage Note
- -- -- -
TSP NameTECHNICAL SPECIAL PROVISIONSUsage Note
XTSPsThe following Technical Special Provisions are individually signed and sealed and made part of the Contract as part of the Contract Documents.Jobs with Technical Special Provisions. 
 


 

Effective January - June 2019

Special Provisions -Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.
Supplemental Specifications - Additions or revisions to the Standard Specifications.
Mandatory Revisions - Critical modifications implemented and added to the Workbook.

 File NameSpecial ProvisionsUsage Note
SP0020100BDIPROPOSAL REQUIREMENTS AND CONDITIONS (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-21-16) (FA 4-21-16) (1-19)
Changes to: 2-1, 2-7.
Use with the approval of the District Program Management Office.
Use with SP0030201BDI, SP0071302BDI and SP0080100BDI.
SP0020400PROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK.
(REV 11-3-15) (FA 1-27-16) (1-19)
Insert Information Required.
Changes to: 2-4.
All Jobs (Add a phone number or email address)
Do not use withSP0020400-60day.
SP0020400-60dayPROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK (60 DAY AD).
(REV 4-11-16) (FA 7-1-16) (1-19)
Insert Information Required.
Changes to: 2-4.
Jobs with 60-day Ads. (Add a phone number or email address)
Do not use withSP0020400.
SP0020501ABPROPOSAL REQUIREMENTS AND CONDITIONS - PREPARATION OF PROPOSALS (A+B BIDDING).
(REV 6-22-04) (FA 7-13-04) (1-19)
Changes to: 2-5.1.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0030100AB, SP0030203AB, SP0080701AB and SP0081300AB.
SP0020501LRPROPOSAL REQUIREMENTS AND CONDITIONS - PREPARATION OF PROPOSALS (LANE RENTAL).
(REV 2-21-05) (FA 3-31-05) (1-19)
Insert Information Required.
Changes to: 2-5.1.
Lane Rental. Use with the approval of the District Construction Engineer.
Use with SP0030100LR, SP0081300LRDR and SP0081300LR.
SP0030100AWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS - SCOPE ALTERNATES.
(REV 11-3-15) (FA 11-20-15) (1-19)
Changes to: 3-1.
Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
*Notify Contracts Office on Transmittal Memo.
SP0030100ABAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (A+B BIDDING).
(REV 11-5-97) (FA 1-20-98) (1-19)
Insert Information Required
Changes to: 3-1.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030203AB, SP0080701AB and SP0081300AB.
SP0030100BCAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (BUDGETARY CONSTRAINTS).
(REV 11-3-15) (FA 11-20-15) (1-19)
Insert Information Required
Changes to: 3-1.
Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
*Notify the Contracts Administration Office on the Transmittal Memo.
SP0030100LRAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (LANE RENTAL).
(REV 11-3-15) (FA 11-20-15) (1-19)
Changes to: 3-1.
Lane Rental. Use with the approval of the District Construction Engineer.
Use with SP0020501LR, SP0081300LR and SP0081300LRDR.
SP0030100LSAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (LUMP SUM).
(REV 8-1-00) (1-19)
Changes to: 3-1.
Lump Sum Projects.
SP0030200AWARD AND EXECUTION OF CONTRACT (TIMEFRAME MODIFICATION).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required
Changes to: 3-2, 3-6, 3-7.
Use when modifying the “Award and Execution” timeframes in the Standard Specifications.
*Contracts Office must approve.
SP0030201BDIAWARD AND EXECUTION OF CONTRACT (BUSINESS DEVELOPMENT INITIATIVE).
(REV 5-13-15) (FA 7-13-15)(1-19)
Changes to: 3-2.1, 3-2.2, 3-6, 3-7.
Use with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0071302BDI, and SP0080100BDI.
SP0030203ABAWARD AND EXECUTION OF CONTRACT - AWARD OF CONTRACTS (A+B BIDDING)
(REV 8-22-96) (FA 9-3-96) (1-19)
Insert Information Required
Changes to: 3-2.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030100AB, SP0080701AB, and SP0081300AB.
SP0030900AWARD AND EXECUTION OF CONTRACT - PUBLIC RECORDS
(REV 10-17-16) (FA 10-24-16 ) (1-19)
Changes to: 3-9.
All Jobs.
SP0040100SCOPE OF THE WORK - INTENT OF CONTRACT.
(REV 8-19-09) (FA 8-24-09) (1-19)
Insert Information Required.
Changes to: 4-1.
All Jobs, excluding Lump Sum.
SP0040100LSSCOPE OF THE WORK (LUMP SUM).
(REV 6-3-16) (FA 6-9-16) (1-19)
Insert Information Required.
Changes to: 4-1, 4-3.1, 4-3.4, 4-3.9.4.
Lump Sum Projects.
SP0050101LSCONTROL OF THE WORK (LUMP SUM).
(REV 3-15-02) (1-19)
Changes to: 5-1.1, 5-2, 5-7.6.
Lump Sum Projects.
SP0050901CONTROL OF THE WORK - GENERAL INSPECTION REQUIREMENTS - COOPERATION BY THE CONTRACTOR.
(REV 2-10-94) (1-19)
Changes to: 5-9.1
Long bridge jobs (1500 feet or longer); modify to suit.
SP0060100LSCONTROL OF MATERIALS - ACCEPTANCE CRITERIA (LUMP SUM).
(REV 8-17-09) (FA 8-24-09) (1-19)
Changes to: 6-1.
Lump Sum Projects.
SP0070101LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED (COMPLIANCE WITH FHWA 1273).
(REV 1-2-14) (1-16-14) (1-19)
Changes to: 7-1.1.
Use on all Federal Aid Jobs.
SP0070104-1LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (BEAR).
(REV 6-6-17) (FA 6-13-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Bear)
SP0070104-2LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (EAGLE).
(REV 6-16-17) (FA 6-28-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Eagle)
SP0070104-3LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (GOPHER TORTOISE).
(REV 6-15-17) (FA 6-20-17) (1-19)

Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Gopher Tortoise)
SP0070104-4LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (MANATEE).
(REV 6-15-17) (FA 6-20-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Manatee)
SP0070104-5LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SAWFISH).
(REV 5-25-17) (FA 6-13-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Sawfish)
SP0070104-6LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SEA TURTLE).
(REV 5-25-17) (FA 6-28-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Sea Turtle)
SP0070104-7LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (INDIGO SNAKE).
(REV 5-25-17) (FA 6-13-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Indigo Snake)
SP0070104-8LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (STURGEON).
(REV 5-25-17) (FA 6-28-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Sturgeon)
SP0070201ALEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PERMITS AND LICENSES (PERMITS PROCURED BY THE DEPARTMENT).
(REV 11-10-16) (FA 1-26-17) (1-19)
Changes to: 7-2.1.
Jobs with permits procured by DOT.
SP0070202LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S., WATERS OF THE U.S. AND WATERS OF THE STATE (DISCHARGE TO).
(REV 6-9-15) (FA 7-22-15) (1-19)

Changes to: 7-2.2.
When SWPPP is used. (One or more acres disturbed.)
SP0071101-tollsLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY (TOLL FACILITIES).
(REV 7-22-14) (FA 10-15-14) (1-19)
Changes to: 7-11.1, 7-11.2.
Use with the approval of the District Traffic Operations Engineer.
SP0071104RRLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - OPERATIONS WITHIN THE RAILROAD RIGHT-OF-WAY.
(REV 3-11-16) (FA 8-2-16) (1-19)
Changes to: 7-11.4.
Projects involving CSX Transportation, NS, FEC, or operations within the South Florida Rail Corridor and the Central Florida Rail Corridor Right of Way
SP0071105FGTLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - FLORIDA GAS TRANSMISSION COMPANY, LLC (FGT) FACILITIES.
(REV 4-6-16) (FA 4-20-16) (1-19)
Changes to: 7-11.5.
Use when Florida Gas Transmission Company, LLC (FGT) is within the project limits.
Use with SP0071201FGT.
SP0071153ALEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - UTILITY ADJUSTMENTS (NO UTILITY WORK SCHEDULES).
(REV 2-10-94) (1-19)
Changes to: 7-11.5.3.
When there are no utility work schedules.
SP0071153BLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - UTILITY ADJUSTMENTS (UTILITY WORK SCHEDULES).
(REV 11-10-16) (FA 1-26-17) (1-19)
Changes to: 7-11.5.3.
When there are utility work schedules.
SP0071201FGTLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC (FLORIDA GAS TRANSMISSION (FGT) COMPANY, LLC ENCROACHMENT AGREEMENTS).
(REV 7-28-16) (FA 7-31-15) (1-19)
Changes to: 7-12.1, 7-13.2, 7-13.4.
Use when Florida Gas Transmission Company, LLC (FGT) is within the project limits.
Use with SP0071105FGT.
SP0071302BDILEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - INSURANCE - COMMERCIAL GENERAL LIABILITY INSURANCE (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-10-15) (FA 7-31-15) (1-19)
Changes to: 7-13.2
Use with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0030201BDI, and SP0080100BDI.
SP0071600LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WAGE RATES FOR FEDERAL-AID PROJECTS.
(REV 9-1-17) (FA 10-31-17) (1-19)
Insert Information Required.
Changes to: 7-16.
All Federal Aid Jobs.
SP0072700LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS.
(REV 4-25-02) (FA 7-17-02) (1-19)
Changes to: Section 7.
Non-Federal Aid Projects.
SP0072800LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PREFERENCE TO STATE RESIDENTS.
(REV 1-13-12) (1-19)
Changes to: Section 7.
Non-Federal Aid Projects.
Construction Projects Only.
SP0072900LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - E-VERIFY.
(REV 6-13-11) (FA 6-16-11) (1-19)
Changes to: Section 7.
All Jobs.
SP0073000LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - SCRUTINIZED COMPANIES.
(REV 3-22-18) (1-19)
Changes to: Section 7.
All Jobs.
SP0073100LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - TITLE VI ASSURANCE - DOT 1050.2, APPENDIX A and APPENDIX E.
(REV 5-27-16) (FA 6-2-16) (1-19)
Changes to: Section 7.
All Federally Funded Jobs.
SP0080100BDIPROSECUTION AND PROGRESS - SUBLETTING OR ASSIGNING OF CONTRACTS (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-21-15) (FA 7-13-15) (1-19)

Changes to: 8-1.
Use with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0030201BDI, and SP0071302BDI.
SP0080302APROSECUTION AND PROGRESS - PROSECUTION OF WORK (SUBMISSION OF WORKING SCHEDULE).
(REV 11-13-14) (FA 1-22-15) (1-19)
Changes to: 8-3.2.
Use only when CPM is authorized by District Construction Engineer.
SP0080303APROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (FLEXIBLE START TIME).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required
Changes to: 8-3.3.
When called for by the District Construction Engineer or the District Maintenance Engineer/Administrator.
*Contracts Office must be notified.
SP0080303BPROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (NOTICE TO PROCEED).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required
Changes to: 8-3.3.
When called for by the District Construction Engineer.
Use with the approval of the Chief Engineer.
SP0080303CPROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (MANDATORY START DATE).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required.
Changes to: 8-3.3.
When called for by the District Construction Engineer.
Use with the approval of the Chief Engineer.
*Contracts Office must be notified.
SP0080306PROSECUTION AND PROGRESS - PROSECUTION OF WORK - PARTNERING.
(REV 5-15-12) (FA 5-21-12) (1-19)
Insert Information Required.
Changes to: 8-3.
 999-16
*Contracts Office must be notified.
SP0080307DRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (1-19)
Changes to: 8-3.
J999-20 Items
*Contracts Office must be notified.
SP0080307RDRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (1-19)
Changes to: 8-3.
Jobs without 999-20 Pay Items.
SP0080308SDRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - STATEWIDE DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (1-19)
Changes to: 8-3.
Jobs with 334, 337, 350, 570 or 649 Pay Items.
SP0080401LSPROSECUTION AND PROGRESS – COMPUTATION OF CONTRACT TIME – ADJUSTING CONTRACT TIME – INCREASED WORK (LUMP SUM).
(REV 8-1-00) (1-19)
Changes to: 8-4.1, 8-7.3.1.
Lump Sum Projects
SP0080408PROSECUTION AND PROGRESS - LIMITATIONS OF OPERATIONS - FENCING.
(REV 6-17-04) (FA 7-13-04) (1-19)
Changes to: 8-4.8.
Jobs on Limited Access Highways
SP0080409PROSECUTION AND PROGRESS - LIMITATIONS OF OPERATIONS - CONTAMINATED MATERIAL (MERCURY-CONTAINING DEVICES AND LAMPS).
(REV 11-6-95) (FA 12-27-95) (1-19)
Insert Information Required.
Changes to: 8-4.9.
Jobs with Lighting
SP0080701APROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (REDUCED PRODUCTIVITY).
(REV 12-22-98) (FA 1-19-99) (1-19)
Insert Information Required.
Changes to: 8-7.1.
Use with approval of the District Construction Engineer.
SP0080701ABPROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (A+B BIDDING).
(REV 7-24-96) (FA 9-3-96) (1-19)
Changes to: 8-7.1.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030100AB, SP0030203AB, and SP0081300AB.
SP0080701BPROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (SHORTENED CONTRACT TIME).
(REV 2-14-94) (1-19)
Insert Information Required.
Changes to: 8-7.1.
Use with the approval of the Chief Engineer.
SP0080701CPROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (HIGHER PRODUCTION RATES).
(REV 12-22-98) (FA 2-1-99) (1-19)
Changes to: 8-7.1.
Use when requested by the District Construction Engineer.
SP0081000PROSECUTION AND PROGRESS - LIQUIDATED DAMAGES FOR FAILURE TO COMPLETE THE WORK.
(REV 11-30-16) (FA 1-27-17) (1-19)
Insert Information Required.
Changes to: Section 8-10.1, 8-10-2.
Use on all revenue producing projects.
SP0081200PROSECUTION AND PROGRESS - DAMAGE RECOVERY (USER COST).
(REV 2-4-04) (1-19)
Insert Information Required.
Changes to: 8-12.
Use when requested by the District Construction Engineer.
(Do not use with Lane Rental)
SP0081300APROSECUTION AND PROGRESS - ALTERNATIVE BIDDING.
(REV 7-28-97) (1-19)
Changes to: Section 8.
All Jobs with Alternative Bidding. Use with the approval of the District Construction Engineer.
SP0081300AB8-13. Incentive - Disincentive for A+B.
(REV 7-27-04) (FA 7-28-04) (1-13)
Insert Information Required.
Changes to: 8-13.
A+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030100AB, SP0030203AB, and SP0080701AB.
SP0081300ABB8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 5-19-04) (FA 7-13-04) (1-05)
Insert Information Required.
Changes to: 8-13.
A+B Jobs with Bonus. Use with the approval of the District Construction Engineer.
SP0081300B88-13. " Bonus " Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Changes to: 8-13.
Bonus (Date Specific) Use with the approval of the District Construction Engineer.
SP0081300BCD8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Changes to: 8-13.
Bonus (Calendar Days) Use with the approval of the District Construction Engineer.
SP0081300ID8-13. Incentive - Disincentive.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Changes to: 8-13.
Incentive - Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300MID.
SP0081300IDLR8-13. Incentive - Disincentive for Lane Rental Days.
(REV 9-25-03) (FA 12-24-03) (7-04)
Insert Information Required.
Changes to: 8-13.
Incentive-Disincentive for Lane Rental Days. Use with the approval of the District Construction Engineer. Do not use with SP0081300LR or SP0081300LRDR.
SP0081300LQS8-13. Liquidated Savings for Early Completion.
(REV 5-18-99) (FA 6-10-99) (7-00)
Insert Information Required.
Changes to: 8-13.
Liquidated Savings. Use with the approval of the District Construction Engineer.
SP0081300LR8-13. Pay Adjustment For Fewer-More Lane Rental Days.
(REV 4-29-97) (FA 5-7-97) (7-00)
Changes to: 8-13.
Lane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR, and SP0081300LRDR.
SP0081300LRDR8-13. Damage Recovery.
(REV 9-25-03) (FA 12-24-03) (7-04)
Insert Information Required.
Changes to: 8-13.
Lane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR, and SP0081300LR.
SP0081300MB8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 4-12-06) (FA 4-25-06) (1-07)
Insert Information Required.
Changes to: 8-13.
Milestone Bonus. Use with the approval of the District Construction Engineer. Do not use with SP0081300B or SP0081300BCD.
SP0081300MID8-13. Incentive - Disincentive.
(REV 2-9-06) (FA 4-25-06) (1-07)

Insert Information Required.
Changes to: 8-13.
Milestone Incentive-Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300ID.
SP0090103LSMEASUREMENT AND PAYMENT (LUMP SUM).
(REV 11-4-16) (FA 1-6-17) (1-19)
Changes to: 9-1.3, 9-2, 9-3, 9-5.5.2, 9-11.
Lump Sum Projects.
SP1100601CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES - GENERAL.
(REV 9-10-07) (FA 2-15-08) (1-19)
Insert Information Required.
Changes to: 110-6.1.
Use when requested by the District Construction Engineer. Must have signed agreement from the Local Agency receiving the material.
SP1100606CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES - ASBESTOS CONTAINING MATERIALS (ACM) IDENTIFIED PRIOR TO THE WORK.
(REV 11-10-16) (FA 1-26-17) (1-19)
Changes to: 110-6.
Use when areas of Asbestos Abatement are identified in the Plans.
SP1101107CLEARING AND GRUBBING (MATERIAL FOR REEF ESTABLISHMENT).
(REV 7-10-95) (FA 6-21-99) (1-19)

Changes to: 110-11.7, 110-12.7.
Jobs with 110-84 Pay Item.
SP1200100AEXCAVATION AND EMBANKMENT - DESCRIPTION - IDENTIFIED AREAS OF CONTAMINATION.
(REV 10-10-16) (FA 1-26-17 ) (1-189
Changes to: 120-1.
Use when contaminated areas are delineated in the Plans.
SP3270100MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 8-31-99) (FA 2-14-00) (1-19)
Insert Information Required.
Changes to: 327-1, 327-6.
When the Plans provide a location for stockpiling milled material. Insert quantity to be retained. Use "all, tons, square yards", etc.
SP3270200MILLING OF EXISTING ASPHALT PAVEMENT - EQUIPMENT.
(REV 12-1-93) (1-19)
Changes to: 327-2.
Use when requested by the District.
SP3300802HOT MIX ASPHALT - GENERAL CONSTRUCTION REQUIREMENTS.
(REV 2-22-18) (FA 2-22-18) (1-19)
Changes to: 330-8.2, 330-9.4, 330-9.5.
Smooth pavement, for interstate and limited access roadway projects only.
Use with the approval of the District Construction Engineer.
SP3500200CEMENT CONCRETE PAVEMENT (COLORED CONCRETE).
(REV 5-11-16) (FA 5-12-16) (1-19)
Changes to: 350-1, 350-2, 350-10.
Use when the Plan
pay item 350-30 is included or colored structural concrete is included.
SP4570000INTEGRAL PILE AND COLUMN JACKETS.
(REV 1-7-16) (FA 1-14-16) (1-19)
Changes to: 457.
457 Items
SP5800000LANDSCAPING.
(REV 7-31-17) (FA 8-9-17) (1-19)
Changes to: 580.
Non-Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
SP5800000FALANDSCAPING.
(REV 7-31-17) (FA 8-9-17) (1-19)

Changes to: 580.
All Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
SP6390100CIACELECTRICAL POWER SERVICE ASSEMBLIES - DESCRIPTION (Contribution-in-Aid-of Construction).
(REV 6-12-18) (FA 7-2-18) (1-19)
Changes to 639.
Use with approval of the District Utility Administrator.
SP6870000HIGHWAY ADVISORY RADIO.
(REV 10-16-15) (FA 12-31-15) (1-19)
Use with the approval of the Chief Engineer.
Supplemental Spec NameSupplemental SpecificationsUsage Note
- -- -- -
TSP NameTECHNICAL SPECIAL PROVISIONSUsage Note
XTSPsThe following Technical Special Provisions are individually signed and sealed but are included as part of this Specifications Package.Jobs with Technical Special Provisions. 
 


 

Effective July - December 2018

Special Provisions -Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.
Supplemental Specifications - Additions or revisions to the Standard Specifications.
Mandatory Revisions - Critical modifications implemented and added to the Workbook.

 File NameSpecial ProvisionsUsage Note
SP0020100BDIPROPOSAL REQUIREMENTS AND CONDITIONS (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-21-16) (FA 4-21-16) (1-19)
Changes to: 2-1, 2-7.
Use with the approval of the District Program Management Office.
Use with SP0030201BDI, SP0071302BDI and SP0080100BDI.
SP0020400PROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK.
(REV 11-3-15) (FA 1-27-16) (1-19)
Insert Information Required.
Changes to: 2-4.
All Jobs (Add a phone number or email address)
Do not use withSP0020400-60day.
SP0020400-60dayPROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK (60 DAY AD).
(REV 4-11-16) (FA 7-1-16) (1-19)
Insert Information Required.
Changes to: 2-4.
Jobs with 60-day Ads. (Add a phone number or email address)
Do not use withSP0020400.
SP0020501ABPROPOSAL REQUIREMENTS AND CONDITIONS - PREPARATION OF PROPOSALS (A+B BIDDING).
(REV 6-22-04) (FA 7-13-04) (1-19)
Changes to: 2-5.1.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0030100AB, SP0030203AB, SP0080701AB and SP0081300AB.
SP0020501LRPROPOSAL REQUIREMENTS AND CONDITIONS - PREPARATION OF PROPOSALS (LANE RENTAL).
(REV 2-21-05) (FA 3-31-05) (1-19)
Insert Information Required.
Changes to: 2-5.1.
Lane Rental. Use with the approval of the District Construction Engineer.
Use with SP0030100LR, SP0081300LRDR and SP0081300LR.
SP0030100AWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS - SCOPE ALTERNATES.
(REV 11-3-15) (FA 11-20-15) (1-19)
Changes to: 3-1.
Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
*Notify Contracts Office on Transmittal Memo.
SP0030100ABAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (A+B BIDDING).
(REV 11-5-97) (FA 1-20-98) (1-19)
Insert Information Required
Changes to: 3-1.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030203AB, SP0080701AB and SP0081300AB.
SP0030100BCAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (BUDGETARY CONSTRAINTS).
(REV 11-3-15) (FA 11-20-15) (1-19)
Insert Information Required
Changes to: 3-1.
Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
*Notify the Contracts Administration Office on the Transmittal Memo.
SP0030100LRAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (LANE RENTAL).
(REV 11-3-15) (FA 11-20-15) (1-19)
Changes to: 3-1.
Lane Rental. Use with the approval of the District Construction Engineer.
Use with SP0020501LR, SP0081300LR and SP0081300LRDR.
SP0030100LSAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (LUMP SUM).
(REV 8-1-00) (1-19)
Changes to: 3-1.
Lump Sum Projects.
SP0030200AWARD AND EXECUTION OF CONTRACT (TIMEFRAME MODIFICATION).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required
Changes to: 3-2, 3-6, 3-7.
Use when modifying the “Award and Execution” timeframes in the Standard Specifications.
*Contracts Office must approve.
SP0030201BDIAWARD AND EXECUTION OF CONTRACT (BUSINESS DEVELOPMENT INITIATIVE).
(REV 5-13-15) (FA 7-13-15)(1-19)
Changes to: 3-2.1, 3-2.2, 3-6, 3-7.
Use with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0071302BDI, and SP0080100BDI.
SP0030203ABAWARD AND EXECUTION OF CONTRACT - AWARD OF CONTRACTS (A+B BIDDING)
(REV 8-22-96) (FA 9-3-96) (1-19)
Insert Information Required
Changes to: 3-2.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030100AB, SP0080701AB, and SP0081300AB.
SP0030900AWARD AND EXECUTION OF CONTRACT - PUBLIC RECORDS
(REV 10-17-16) (FA 10-24-16 ) (1-19)
Changes to: 3-9.
All Jobs.
SP0040100SCOPE OF THE WORK - INTENT OF CONTRACT.
(REV 8-19-09) (FA 8-24-09) (1-19)
Insert Information Required.
Changes to: 4-1.
All Jobs, excluding Lump Sum.
SP0040100LSSCOPE OF THE WORK (LUMP SUM).
(REV 6-3-16) (FA 6-9-16) (1-19)
Insert Information Required.
Changes to: 4-1, 4-3.1, 4-3.4, 4-3.9.4.
Lump Sum Projects.
SP0050101LSCONTROL OF THE WORK (LUMP SUM).
(REV 3-15-02) (1-19)
Changes to: 5-1.1, 5-2, 5-7.6.
Lump Sum Projects.
SP0050901CONTROL OF THE WORK - GENERAL INSPECTION REQUIREMENTS - COOPERATION BY THE CONTRACTOR.
(REV 2-10-94) (1-19)
Changes to: 5-9.1
Long bridge jobs (1500 feet or longer); modify to suit.
SP0060100LSCONTROL OF MATERIALS - ACCEPTANCE CRITERIA (LUMP SUM).
(REV 8-17-09) (FA 8-24-09) (1-19)
Changes to: 6-1.
Lump Sum Projects.
SP0070101LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED (COMPLIANCE WITH FHWA 1273).
(REV 1-2-14) (1-16-14) (1-19)
Changes to: 7-1.1.
Use on all Federal Aid Jobs.
SP0070104-1LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (BEAR).
(REV 6-6-17) (FA 6-13-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Bear)
SP0070104-2LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (EAGLE).
(REV 6-16-17) (FA 6-28-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Eagle)
SP0070104-3LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (GOPHER TORTOISE).
(REV 6-15-17) (FA 6-20-17) (1-19)

Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Gopher Tortoise)
SP0070104-4LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (MANATEE).
(REV 6-15-17) (FA 6-20-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Manatee)
SP0070104-5LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SAWFISH).
(REV 5-25-17) (FA 6-13-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Sawfish)
SP0070104-6LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SEA TURTLE).
(REV 5-25-17) (FA 6-28-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Sea Turtle)
SP0070104-7LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (INDIGO SNAKE).
(REV 5-25-17) (FA 6-13-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Indigo Snake)
SP0070104-8LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (STURGEON).
(REV 5-25-17) (FA 6-28-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Sturgeon)
SP0070201ALEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PERMITS AND LICENSES (PERMITS PROCURED BY THE DEPARTMENT).
(REV 11-10-16) (FA 1-26-17) (1-19)
Changes to: 7-2.1.
Jobs with permits procured by DOT.
SP0070202LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S., WATERS OF THE U.S. AND WATERS OF THE STATE (DISCHARGE TO).
(REV 6-9-15) (FA 7-22-15) (1-19)

Changes to: 7-2.2.
When SWPPP is used. (One or more acres disturbed.)
SP0071101-tollsLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY (TOLL FACILITIES).
(REV 7-22-14) (FA 10-15-14) (1-19)
Changes to: 7-11.1, 7-11.2.
Use with the approval of the District Traffic Operations Engineer.
SP0071104RRLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - OPERATIONS WITHIN THE RAILROAD RIGHT-OF-WAY.
(REV 3-11-16) (FA 8-2-16) (1-19)
Changes to: 7-11.4.
Projects involving CSX Transportation, NS, FEC, or operations within the South Florida Rail Corridor and the Central Florida Rail Corridor Right of Way
SP0071105FGTLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - FLORIDA GAS TRANSMISSION COMPANY, LLC (FGT) FACILITIES.
(REV 4-6-16) (FA 4-20-16) (1-19)
Changes to: 7-11.5.
Use when Florida Gas Transmission Company, LLC (FGT) is within the project limits.
Use with SP0071201FGT.
SP0071153ALEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - UTILITY ADJUSTMENTS (NO UTILITY WORK SCHEDULES).
(REV 2-10-94) (1-19)
Changes to: 7-11.5.3.
When there are no utility work schedules.
SP0071153BLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - UTILITY ADJUSTMENTS (UTILITY WORK SCHEDULES).
(REV 11-10-16) (FA 1-26-17) (1-19)
Changes to: 7-11.5.3.
When there are utility work schedules.
SP0071201FGTLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC (FLORIDA GAS TRANSMISSION (FGT) COMPANY, LLC ENCROACHMENT AGREEMENTS).
(REV 7-28-16) (FA 7-31-15) (1-19)
Changes to: 7-12.1, 7-13.2, 7-13.4.
Use when Florida Gas Transmission Company, LLC (FGT) is within the project limits.
Use with SP0071105FGT.
SP0071302BDILEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - INSURANCE - COMMERCIAL GENERAL LIABILITY INSURANCE (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-10-15) (FA 7-31-15) (1-19)
Changes to: 7-13.2
Use with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0030201BDI, and SP0080100BDI.
SP0071600LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WAGE RATES FOR FEDERAL-AID PROJECTS.
(REV 9-1-17) (FA 10-31-17) (1-19)
Insert Information Required.
Changes to: 7-16.
All Federal Aid Jobs.
SP0072700LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS.
(REV 4-25-02) (FA 7-17-02) (1-19)
Changes to: Section 7.
Non-Federal Aid Projects.
SP0072800LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PREFERENCE TO STATE RESIDENTS.
(REV 1-13-12) (1-19)
Changes to: Section 7.
Non-Federal Aid Projects.
Construction Projects Only.
SP0072900LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - E-VERIFY.
(REV 6-13-11) (FA 6-16-11) (1-19)
Changes to: Section 7.
All Jobs.
SP0073000LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - SCRUTINIZED COMPANIES.
(REV 3-22-18) (1-19)
Changes to: Section 7.
All Jobs.
SP0073100LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - TITLE VI ASSURANCE - DOT 1050.2, APPENDIX A and APPENDIX E.
(REV 5-27-16) (FA 6-2-16) (1-19)
Changes to: Section 7.
All Federally Funded Jobs.
SP0080100BDIPROSECUTION AND PROGRESS - SUBLETTING OR ASSIGNING OF CONTRACTS (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-21-15) (FA 7-13-15) (1-19)

Changes to: 8-1.
Use with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0030201BDI, and SP0071302BDI.
SP0080302APROSECUTION AND PROGRESS - PROSECUTION OF WORK (SUBMISSION OF WORKING SCHEDULE).
(REV 11-13-14) (FA 1-22-15) (1-19)
Changes to: 8-3.2.
Use only when CPM is authorized by District Construction Engineer.
SP0080303APROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (FLEXIBLE START TIME).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required
Changes to: 8-3.3.
When called for by the District Construction Engineer or the District Maintenance Engineer/Administrator.
*Contracts Office must be notified.
SP0080303BPROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (NOTICE TO PROCEED).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required
Changes to: 8-3.3.
When called for by the District Construction Engineer.
Use with the approval of the Chief Engineer.
SP0080303CPROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (MANDATORY START DATE).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required.
Changes to: 8-3.3.
When called for by the District Construction Engineer.
Use with the approval of the Chief Engineer.
*Contracts Office must be notified.
SP0080306PROSECUTION AND PROGRESS - PROSECUTION OF WORK - PARTNERING.
(REV 5-15-12) (FA 5-21-12) (1-19)
Insert Information Required.
Changes to: 8-3.
 999-16
*Contracts Office must be notified.
SP0080307DRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (1-19)
Changes to: 8-3.
J999-20 Items
*Contracts Office must be notified.
SP0080307RDRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (1-19)
Changes to: 8-3.
Jobs without 999-20 Pay Items.
SP0080308SDRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - STATEWIDE DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (1-19)
Changes to: 8-3.
Jobs with 334, 337, 350, 570 or 649 Pay Items.
SP0080401LSPROSECUTION AND PROGRESS – COMPUTATION OF CONTRACT TIME – ADJUSTING CONTRACT TIME – INCREASED WORK (LUMP SUM).
(REV 8-1-00) (1-19)
Changes to: 8-4.1, 8-7.3.1.
Lump Sum Projects
SP0080408PROSECUTION AND PROGRESS - LIMITATIONS OF OPERATIONS - FENCING.
(REV 6-17-04) (FA 7-13-04) (1-19)
Changes to: 8-4.8.
Jobs on Limited Access Highways
SP0080409PROSECUTION AND PROGRESS - LIMITATIONS OF OPERATIONS - CONTAMINATED MATERIAL (MERCURY-CONTAINING DEVICES AND LAMPS).
(REV 11-6-95) (FA 12-27-95) (1-19)
Insert Information Required.
Changes to: 8-4.9.
Jobs with Lighting
SP0080701APROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (REDUCED PRODUCTIVITY).
(REV 12-22-98) (FA 1-19-99) (1-19)
Insert Information Required.
Changes to: 8-7.1.
Use with approval of the District Construction Engineer.
SP0080701ABPROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (A+B BIDDING).
(REV 7-24-96) (FA 9-3-96) (1-19)
Changes to: 8-7.1.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030100AB, SP0030203AB, and SP0081300AB.
SP0080701BPROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (SHORTENED CONTRACT TIME).
(REV 2-14-94) (1-19)
Insert Information Required.
Changes to: 8-7.1.
Use with the approval of the Chief Engineer.
SP0080701CPROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (HIGHER PRODUCTION RATES).
(REV 12-22-98) (FA 2-1-99) (1-19)
Changes to: 8-7.1.
Use when requested by the District Construction Engineer.
SP0081000PROSECUTION AND PROGRESS - LIQUIDATED DAMAGES FOR FAILURE TO COMPLETE THE WORK.
(REV 11-30-16) (FA 1-27-17) (1-19)
Insert Information Required.
Changes to: Section 8-10.1, 8-10-2.
Use on all revenue producing projects.
SP0081200PROSECUTION AND PROGRESS - DAMAGE RECOVERY (USER COST).
(REV 2-4-04) (1-19)
Insert Information Required.
Changes to: 8-12.
Use when requested by the District Construction Engineer.
(Do not use with Lane Rental)
SP0081300APROSECUTION AND PROGRESS - ALTERNATIVE BIDDING.
(REV 7-28-97) (1-19)
Changes to: Section 8.
All Jobs with Alternative Bidding. Use with the approval of the District Construction Engineer.
SP0081300AB8-13. Incentive - Disincentive for A+B.
(REV 7-27-04) (FA 7-28-04) (1-13)
Insert Information Required.
Changes to: 8-13.
A+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030100AB, SP0030203AB, and SP0080701AB.
SP0081300ABB8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 5-19-04) (FA 7-13-04) (1-05)
Insert Information Required.
Changes to: 8-13.
A+B Jobs with Bonus. Use with the approval of the District Construction Engineer.
SP0081300B88-13. " Bonus " Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Changes to: 8-13.
Bonus (Date Specific) Use with the approval of the District Construction Engineer.
SP0081300BCD8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Changes to: 8-13.
Bonus (Calendar Days) Use with the approval of the District Construction Engineer.
SP0081300ID8-13. Incentive - Disincentive.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Changes to: 8-13.
Incentive - Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300MID.
SP0081300IDLR8-13. Incentive - Disincentive for Lane Rental Days.
(REV 9-25-03) (FA 12-24-03) (7-04)
Insert Information Required.
Changes to: 8-13.
Incentive-Disincentive for Lane Rental Days. Use with the approval of the District Construction Engineer. Do not use with SP0081300LR or SP0081300LRDR.
SP0081300LQS8-13. Liquidated Savings for Early Completion.
(REV 5-18-99) (FA 6-10-99) (7-00)
Insert Information Required.
Changes to: 8-13.
Liquidated Savings. Use with the approval of the District Construction Engineer.
SP0081300LR8-13. Pay Adjustment For Fewer-More Lane Rental Days.
(REV 4-29-97) (FA 5-7-97) (7-00)
Changes to: 8-13.
Lane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR, and SP0081300LRDR.
SP0081300LRDR8-13. Damage Recovery.
(REV 9-25-03) (FA 12-24-03) (7-04)
Insert Information Required.
Changes to: 8-13.
Lane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR, and SP0081300LR.
SP0081300MB8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 4-12-06) (FA 4-25-06) (1-07)
Insert Information Required.
Changes to: 8-13.
Milestone Bonus. Use with the approval of the District Construction Engineer. Do not use with SP0081300B or SP0081300BCD.
SP0081300MID8-13. Incentive - Disincentive.
(REV 2-9-06) (FA 4-25-06) (1-07)

Insert Information Required.
Changes to: 8-13.
Milestone Incentive-Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300ID.
SP0090103LSMEASUREMENT AND PAYMENT (LUMP SUM).
(REV 11-4-16) (FA 1-6-17) (1-19)
Changes to: 9-1.3, 9-2, 9-3, 9-5.5.2, 9-11.
Lump Sum Projects.
SP1100601CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES - GENERAL.
(REV 9-10-07) (FA 2-15-08) (1-19)
Insert Information Required.
Changes to: 110-6.1.
Use when requested by the District Construction Engineer. Must have signed agreement from the Local Agency receiving the material.
SP1100606CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES - ASBESTOS CONTAINING MATERIALS (ACM) IDENTIFIED PRIOR TO THE WORK.
(REV 11-10-16) (FA 1-26-17) (1-19)
Changes to: 110-6.
Use when areas of Asbestos Abatement are identified in the Plans.
SP1101107CLEARING AND GRUBBING (MATERIAL FOR REEF ESTABLISHMENT).
(REV 7-10-95) (FA 6-21-99) (1-19)

Changes to: 110-11.7, 110-12.7.
Jobs with 110-84 Pay Item.
SP1200100AEXCAVATION AND EMBANKMENT - DESCRIPTION - IDENTIFIED AREAS OF CONTAMINATION.
(REV 10-10-16) (FA 1-26-17 ) (1-189
Changes to: 120-1.
Use when contaminated areas are delineated in the Plans.
SP3270100MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 8-31-99) (FA 2-14-00) (1-19)
Insert Information Required.
Changes to: 327-1, 327-6.
When the Plans provide a location for stockpiling milled material. Insert quantity to be retained. Use "all, tons, square yards", etc.
SP3270200MILLING OF EXISTING ASPHALT PAVEMENT - EQUIPMENT.
(REV 12-1-93) (1-19)
Changes to: 327-2.
Use when requested by the District.
SP3300802HOT MIX ASPHALT - GENERAL CONSTRUCTION REQUIREMENTS.
(REV 2-22-18) (FA 2-22-18) (1-19)
Changes to: 330-8.2, 330-9.4, 330-9.5.
Smooth pavement, for interstate and limited access roadway projects only.
Use with the approval of the District Construction Engineer.
SP3500200CEMENT CONCRETE PAVEMENT (COLORED CONCRETE).
(REV 5-11-16) (FA 5-12-16) (1-19)
Changes to: 350-1, 350-2, 350-10.
Use when the Plan
pay item 350-30 is included or colored structural concrete is included.
SP4570000INTEGRAL PILE AND COLUMN JACKETS.
(REV 1-7-16) (FA 1-14-16) (1-19)
Changes to: 457.
457 Items
SP5800000LANDSCAPING.
(REV 7-31-17) (FA 8-9-17) (1-19)
Changes to: 580.
Non-Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
SP5800000FALANDSCAPING.
(REV 7-31-17) (FA 8-9-17) (1-19)

Changes to: 580.
All Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
SP6390100CIACELECTRICAL POWER SERVICE ASSEMBLIES - DESCRIPTION (Contribution-in-Aid-of Construction).
(REV 6-12-18) (FA 7-2-18) (1-19)
Changes to 639.
Use with approval of the District Utility Administrator.
SP6870000HIGHWAY ADVISORY RADIO.
(REV 10-16-15) (FA 12-31-15) (1-19)
Use with the approval of the Chief Engineer.
Supplemental Spec NameSupplemental SpecificationsUsage Note
- -- -- -
TSP NameTECHNICAL SPECIAL PROVISIONSUsage Note
XTSPsThe following Technical Special Provisions are individually signed and sealed but are included as part of this Specifications Package.Jobs with Technical Special Provisions. 
 


 

Effective January - June 2018

Special Provisions -Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.
Supplemental Specifications - Additions or revisions to the Standard Specifications.
Mandatory Revisions - Critical modifications implemented and added to the Workbook.

 File NameSpecial ProvisionsUsage Note
SP0020100BDIPROPOSAL REQUIREMENTS AND CONDITIONS (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-21-16) (FA 4-21-16) (1-19)
Changes to: 2-1, 2-7.
Use with the approval of the District Program Management Office.
Use with SP0030201BDI, SP0071302BDI and SP0080100BDI.
SP0020400PROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK.
(REV 11-3-15) (FA 1-27-16) (1-19)
Insert Information Required.
Changes to: 2-4.
All Jobs (Add a phone number or email address)
Do not use withSP0020400-60day.
SP0020400-60dayPROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK (60 DAY AD).
(REV 4-11-16) (FA 7-1-16) (1-19)
Insert Information Required.
Changes to: 2-4.
Jobs with 60-day Ads. (Add a phone number or email address)
Do not use withSP0020400.
SP0020501ABPROPOSAL REQUIREMENTS AND CONDITIONS - PREPARATION OF PROPOSALS (A+B BIDDING).
(REV 6-22-04) (FA 7-13-04) (1-19)
Changes to: 2-5.1.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0030100AB, SP0030203AB, SP0080701AB and SP0081300AB.
SP0020501LRPROPOSAL REQUIREMENTS AND CONDITIONS - PREPARATION OF PROPOSALS (LANE RENTAL).
(REV 2-21-05) (FA 3-31-05) (1-19)
Insert Information Required.
Changes to: 2-5.1.
Lane Rental. Use with the approval of the District Construction Engineer.
Use with SP0030100LR, SP0081300LRDR and SP0081300LR.
SP0030100AWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS - SCOPE ALTERNATES.
(REV 11-3-15) (FA 11-20-15) (1-19)
Changes to: 3-1.
Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
*Notify Contracts Office on Transmittal Memo.
SP0030100ABAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (A+B BIDDING).
(REV 11-5-97) (FA 1-20-98) (1-19)
Insert Information Required
Changes to: 3-1.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030203AB, SP0080701AB and SP0081300AB.
SP0030100BCAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (BUDGETARY CONSTRAINTS).
(REV 11-3-15) (FA 11-20-15) (1-19)
Insert Information Required
Changes to: 3-1.
Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
*Notify the Contracts Administration Office on the Transmittal Memo.
SP0030100LRAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (LANE RENTAL).
(REV 11-3-15) (FA 11-20-15) (1-19)
Changes to: 3-1.
Lane Rental. Use with the approval of the District Construction Engineer.
Use with SP0020501LR, SP0081300LR and SP0081300LRDR.
SP0030100LSAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (LUMP SUM).
(REV 8-1-00) (1-19)
Changes to: 3-1.
Lump Sum Projects.
SP0030200AWARD AND EXECUTION OF CONTRACT (TIMEFRAME MODIFICATION).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required
Changes to: 3-2, 3-6, 3-7.
Use when modifying the “Award and Execution” timeframes in the Standard Specifications.
*Contracts Office must approve.
SP0030201BDIAWARD AND EXECUTION OF CONTRACT (BUSINESS DEVELOPMENT INITIATIVE).
(REV 5-13-15) (FA 7-13-15)(1-19)
Changes to: 3-2.1, 3-2.2, 3-6, 3-7.
Use with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0071302BDI, and SP0080100BDI.
SP0030203ABAWARD AND EXECUTION OF CONTRACT - AWARD OF CONTRACTS (A+B BIDDING)
(REV 8-22-96) (FA 9-3-96) (1-19)
Insert Information Required
Changes to: 3-2.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030100AB, SP0080701AB, and SP0081300AB.
SP0030900AWARD AND EXECUTION OF CONTRACT - PUBLIC RECORDS
(REV 10-17-16) (FA 10-24-16 ) (1-19)
Changes to: 3-9.
All Jobs.
SP0040100SCOPE OF THE WORK - INTENT OF CONTRACT.
(REV 8-19-09) (FA 8-24-09) (1-19)
Insert Information Required.
Changes to: 4-1.
All Jobs, excluding Lump Sum.
SP0040100LSSCOPE OF THE WORK (LUMP SUM).
(REV 6-3-16) (FA 6-9-16) (1-19)
Insert Information Required.
Changes to: 4-1, 4-3.1, 4-3.4, 4-3.9.4.
Lump Sum Projects.
SP0050101LSCONTROL OF THE WORK (LUMP SUM).
(REV 3-15-02) (1-19)
Changes to: 5-1.1, 5-2, 5-7.6.
Lump Sum Projects.
SP0050901CONTROL OF THE WORK - GENERAL INSPECTION REQUIREMENTS - COOPERATION BY THE CONTRACTOR.
(REV 2-10-94) (1-19)
Changes to: 5-9.1
Long bridge jobs (1500 feet or longer); modify to suit.
SP0060100LSCONTROL OF MATERIALS - ACCEPTANCE CRITERIA (LUMP SUM).
(REV 8-17-09) (FA 8-24-09) (1-19)
Changes to: 6-1.
Lump Sum Projects.
SP0070101LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED (COMPLIANCE WITH FHWA 1273).
(REV 1-2-14) (1-16-14) (1-19)
Changes to: 7-1.1.
Use on all Federal Aid Jobs.
SP0070104-1LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (BEAR).
(REV 6-6-17) (FA 6-13-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Bear)
SP0070104-2LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (EAGLE).
(REV 6-16-17) (FA 6-28-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Eagle)
SP0070104-3LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (GOPHER TORTOISE).
(REV 6-15-17) (FA 6-20-17) (1-19)

Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Gopher Tortoise)
SP0070104-4LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (MANATEE).
(REV 6-15-17) (FA 6-20-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Manatee)
SP0070104-5LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SAWFISH).
(REV 5-25-17) (FA 6-13-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Sawfish)
SP0070104-6LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SEA TURTLE).
(REV 5-25-17) (FA 6-28-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Sea Turtle)
SP0070104-7LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (INDIGO SNAKE).
(REV 5-25-17) (FA 6-13-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Indigo Snake)
SP0070104-8LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (STURGEON).
(REV 5-25-17) (FA 6-28-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Sturgeon)
SP0070201ALEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PERMITS AND LICENSES (PERMITS PROCURED BY THE DEPARTMENT).
(REV 11-10-16) (FA 1-26-17) (1-19)
Changes to: 7-2.1.
Jobs with permits procured by DOT.
SP0070202LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S., WATERS OF THE U.S. AND WATERS OF THE STATE (DISCHARGE TO).
(REV 6-9-15) (FA 7-22-15) (1-19)

Changes to: 7-2.2.
When SWPPP is used. (One or more acres disturbed.)
SP0071101-tollsLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY (TOLL FACILITIES).
(REV 7-22-14) (FA 10-15-14) (1-19)
Changes to: 7-11.1, 7-11.2.
Use with the approval of the District Traffic Operations Engineer.
SP0071104RRLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - OPERATIONS WITHIN THE RAILROAD RIGHT-OF-WAY.
(REV 3-11-16) (FA 8-2-16) (1-19)
Changes to: 7-11.4.
Projects involving CSX Transportation, NS, FEC, or operations within the South Florida Rail Corridor and the Central Florida Rail Corridor Right of Way
SP0071105FGTLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - FLORIDA GAS TRANSMISSION COMPANY, LLC (FGT) FACILITIES.
(REV 4-6-16) (FA 4-20-16) (1-19)
Changes to: 7-11.5.
Use when Florida Gas Transmission Company, LLC (FGT) is within the project limits.
Use with SP0071201FGT.
SP0071153ALEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - UTILITY ADJUSTMENTS (NO UTILITY WORK SCHEDULES).
(REV 2-10-94) (1-19)
Changes to: 7-11.5.3.
When there are no utility work schedules.
SP0071153BLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - UTILITY ADJUSTMENTS (UTILITY WORK SCHEDULES).
(REV 11-10-16) (FA 1-26-17) (1-19)
Changes to: 7-11.5.3.
When there are utility work schedules.
SP0071201FGTLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC (FLORIDA GAS TRANSMISSION (FGT) COMPANY, LLC ENCROACHMENT AGREEMENTS).
(REV 7-28-16) (FA 7-31-15) (1-19)
Changes to: 7-12.1, 7-13.2, 7-13.4.
Use when Florida Gas Transmission Company, LLC (FGT) is within the project limits.
Use with SP0071105FGT.
SP0071302BDILEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - INSURANCE - COMMERCIAL GENERAL LIABILITY INSURANCE (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-10-15) (FA 7-31-15) (1-19)
Changes to: 7-13.2
Use with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0030201BDI, and SP0080100BDI.
SP0071600LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WAGE RATES FOR FEDERAL-AID PROJECTS.
(REV 9-1-17) (FA 10-31-17) (1-19)
Insert Information Required.
Changes to: 7-16.
All Federal Aid Jobs.
SP0072700LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS.
(REV 4-25-02) (FA 7-17-02) (1-19)
Changes to: Section 7.
Non-Federal Aid Projects.
SP0072800LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PREFERENCE TO STATE RESIDENTS.
(REV 1-13-12) (1-19)
Changes to: Section 7.
Non-Federal Aid Projects.
Construction Projects Only.
SP0072900LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - E-VERIFY.
(REV 6-13-11) (FA 6-16-11) (1-19)
Changes to: Section 7.
All Jobs.
SP0073000LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - SCRUTINIZED COMPANIES.
(REV 3-22-18) (1-19)
Changes to: Section 7.
All Jobs.
SP0073100LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - TITLE VI ASSURANCE - DOT 1050.2, APPENDIX A and APPENDIX E.
(REV 5-27-16) (FA 6-2-16) (1-19)
Changes to: Section 7.
All Federally Funded Jobs.
SP0080100BDIPROSECUTION AND PROGRESS - SUBLETTING OR ASSIGNING OF CONTRACTS (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-21-15) (FA 7-13-15) (1-19)

Changes to: 8-1.
Use with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0030201BDI, and SP0071302BDI.
SP0080302APROSECUTION AND PROGRESS - PROSECUTION OF WORK (SUBMISSION OF WORKING SCHEDULE).
(REV 11-13-14) (FA 1-22-15) (1-19)
Changes to: 8-3.2.
Use only when CPM is authorized by District Construction Engineer.
SP0080303APROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (FLEXIBLE START TIME).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required
Changes to: 8-3.3.
When called for by the District Construction Engineer or the District Maintenance Engineer/Administrator.
*Contracts Office must be notified.
SP0080303BPROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (NOTICE TO PROCEED).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required
Changes to: 8-3.3.
When called for by the District Construction Engineer.
Use with the approval of the Chief Engineer.
SP0080303CPROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (MANDATORY START DATE).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required.
Changes to: 8-3.3.
When called for by the District Construction Engineer.
Use with the approval of the Chief Engineer.
*Contracts Office must be notified.
SP0080306PROSECUTION AND PROGRESS - PROSECUTION OF WORK - PARTNERING.
(REV 5-15-12) (FA 5-21-12) (1-19)
Insert Information Required.
Changes to: 8-3.
 999-16
*Contracts Office must be notified.
SP0080307DRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (1-19)
Changes to: 8-3.
J999-20 Items
*Contracts Office must be notified.
SP0080307RDRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (1-19)
Changes to: 8-3.
Jobs without 999-20 Pay Items.
SP0080308SDRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - STATEWIDE DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (1-19)
Changes to: 8-3.
Jobs with 334, 337, 350, 570 or 649 Pay Items.
SP0080401LSPROSECUTION AND PROGRESS – COMPUTATION OF CONTRACT TIME – ADJUSTING CONTRACT TIME – INCREASED WORK (LUMP SUM).
(REV 8-1-00) (1-19)
Changes to: 8-4.1, 8-7.3.1.
Lump Sum Projects
SP0080408PROSECUTION AND PROGRESS - LIMITATIONS OF OPERATIONS - FENCING.
(REV 6-17-04) (FA 7-13-04) (1-19)
Changes to: 8-4.8.
Jobs on Limited Access Highways
SP0080409PROSECUTION AND PROGRESS - LIMITATIONS OF OPERATIONS - CONTAMINATED MATERIAL (MERCURY-CONTAINING DEVICES AND LAMPS).
(REV 11-6-95) (FA 12-27-95) (1-19)
Insert Information Required.
Changes to: 8-4.9.
Jobs with Lighting
SP0080701APROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (REDUCED PRODUCTIVITY).
(REV 12-22-98) (FA 1-19-99) (1-19)
Insert Information Required.
Changes to: 8-7.1.
Use with approval of the District Construction Engineer.
SP0080701ABPROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (A+B BIDDING).
(REV 7-24-96) (FA 9-3-96) (1-19)
Changes to: 8-7.1.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030100AB, SP0030203AB, and SP0081300AB.
SP0080701BPROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (SHORTENED CONTRACT TIME).
(REV 2-14-94) (1-19)
Insert Information Required.
Changes to: 8-7.1.
Use with the approval of the Chief Engineer.
SP0080701CPROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (HIGHER PRODUCTION RATES).
(REV 12-22-98) (FA 2-1-99) (1-19)
Changes to: 8-7.1.
Use when requested by the District Construction Engineer.
SP0081000PROSECUTION AND PROGRESS - LIQUIDATED DAMAGES FOR FAILURE TO COMPLETE THE WORK.
(REV 11-30-16) (FA 1-27-17) (1-19)
Insert Information Required.
Changes to: Section 8-10.1, 8-10-2.
Use on all revenue producing projects.
SP0081200PROSECUTION AND PROGRESS - DAMAGE RECOVERY (USER COST).
(REV 2-4-04) (1-19)
Insert Information Required.
Changes to: 8-12.
Use when requested by the District Construction Engineer.
(Do not use with Lane Rental)
SP0081300APROSECUTION AND PROGRESS - ALTERNATIVE BIDDING.
(REV 7-28-97) (1-19)
Changes to: Section 8.
All Jobs with Alternative Bidding. Use with the approval of the District Construction Engineer.
SP0081300AB8-13. Incentive - Disincentive for A+B.
(REV 7-27-04) (FA 7-28-04) (1-13)
Insert Information Required.
Changes to: 8-13.
A+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030100AB, SP0030203AB, and SP0080701AB.
SP0081300ABB8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 5-19-04) (FA 7-13-04) (1-05)
Insert Information Required.
Changes to: 8-13.
A+B Jobs with Bonus. Use with the approval of the District Construction Engineer.
SP0081300B88-13. " Bonus " Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Changes to: 8-13.
Bonus (Date Specific) Use with the approval of the District Construction Engineer.
SP0081300BCD8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Changes to: 8-13.
Bonus (Calendar Days) Use with the approval of the District Construction Engineer.
SP0081300ID8-13. Incentive - Disincentive.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Changes to: 8-13.
Incentive - Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300MID.
SP0081300IDLR8-13. Incentive - Disincentive for Lane Rental Days.
(REV 9-25-03) (FA 12-24-03) (7-04)
Insert Information Required.
Changes to: 8-13.
Incentive-Disincentive for Lane Rental Days. Use with the approval of the District Construction Engineer. Do not use with SP0081300LR or SP0081300LRDR.
SP0081300LQS8-13. Liquidated Savings for Early Completion.
(REV 5-18-99) (FA 6-10-99) (7-00)
Insert Information Required.
Changes to: 8-13.
Liquidated Savings. Use with the approval of the District Construction Engineer.
SP0081300LR8-13. Pay Adjustment For Fewer-More Lane Rental Days.
(REV 4-29-97) (FA 5-7-97) (7-00)
Changes to: 8-13.
Lane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR, and SP0081300LRDR.
SP0081300LRDR8-13. Damage Recovery.
(REV 9-25-03) (FA 12-24-03) (7-04)
Insert Information Required.
Changes to: 8-13.
Lane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR, and SP0081300LR.
SP0081300MB8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 4-12-06) (FA 4-25-06) (1-07)
Insert Information Required.
Changes to: 8-13.
Milestone Bonus. Use with the approval of the District Construction Engineer. Do not use with SP0081300B or SP0081300BCD.
SP0081300MID8-13. Incentive - Disincentive.
(REV 2-9-06) (FA 4-25-06) (1-07)

Insert Information Required.
Changes to: 8-13.
Milestone Incentive-Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300ID.
SP0090103LSMEASUREMENT AND PAYMENT (LUMP SUM).
(REV 11-4-16) (FA 1-6-17) (1-19)
Changes to: 9-1.3, 9-2, 9-3, 9-5.5.2, 9-11.
Lump Sum Projects.
SP1100601CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES - GENERAL.
(REV 9-10-07) (FA 2-15-08) (1-19)
Insert Information Required.
Changes to: 110-6.1.
Use when requested by the District Construction Engineer. Must have signed agreement from the Local Agency receiving the material.
SP1100606CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES - ASBESTOS CONTAINING MATERIALS (ACM) IDENTIFIED PRIOR TO THE WORK.
(REV 11-10-16) (FA 1-26-17) (1-19)
Changes to: 110-6.
Use when areas of Asbestos Abatement are identified in the Plans.
SP1101107CLEARING AND GRUBBING (MATERIAL FOR REEF ESTABLISHMENT).
(REV 7-10-95) (FA 6-21-99) (1-19)

Changes to: 110-11.7, 110-12.7.
Jobs with 110-84 Pay Item.
SP1200100AEXCAVATION AND EMBANKMENT - DESCRIPTION - IDENTIFIED AREAS OF CONTAMINATION.
(REV 10-10-16) (FA 1-26-17 ) (1-189
Changes to: 120-1.
Use when contaminated areas are delineated in the Plans.
SP3270100MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 8-31-99) (FA 2-14-00) (1-19)
Insert Information Required.
Changes to: 327-1, 327-6.
When the Plans provide a location for stockpiling milled material. Insert quantity to be retained. Use "all, tons, square yards", etc.
SP3270200MILLING OF EXISTING ASPHALT PAVEMENT - EQUIPMENT.
(REV 12-1-93) (1-19)
Changes to: 327-2.
Use when requested by the District.
SP3300802HOT MIX ASPHALT - GENERAL CONSTRUCTION REQUIREMENTS.
(REV 2-22-18) (FA 2-22-18) (1-19)
Changes to: 330-8.2, 330-9.4, 330-9.5.
Smooth pavement, for interstate and limited access roadway projects only.
Use with the approval of the District Construction Engineer.
SP3500200CEMENT CONCRETE PAVEMENT (COLORED CONCRETE).
(REV 5-11-16) (FA 5-12-16) (1-19)
Changes to: 350-1, 350-2, 350-10.
Use when the Plan
pay item 350-30 is included or colored structural concrete is included.
SP4570000INTEGRAL PILE AND COLUMN JACKETS.
(REV 1-7-16) (FA 1-14-16) (1-19)
Changes to: 457.
457 Items
SP5800000LANDSCAPING.
(REV 7-31-17) (FA 8-9-17) (1-19)
Changes to: 580.
Non-Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
SP5800000FALANDSCAPING.
(REV 7-31-17) (FA 8-9-17) (1-19)

Changes to: 580.
All Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
SP6390100CIACELECTRICAL POWER SERVICE ASSEMBLIES - DESCRIPTION (Contribution-in-Aid-of Construction).
(REV 6-12-18) (FA 7-2-18) (1-19)
Changes to 639.
Use with approval of the District Utility Administrator.
SP6870000HIGHWAY ADVISORY RADIO.
(REV 10-16-15) (FA 12-31-15) (1-19)
Use with the approval of the Chief Engineer.
Supplemental Spec NameSupplemental SpecificationsUsage Note
- -- -- -
TSP NameTECHNICAL SPECIAL PROVISIONSUsage Note
XTSPsThe following Technical Special Provisions are individually signed and sealed but are included as part of this Specifications Package.Jobs with Technical Special Provisions. 
 


 

Effective July - December 2017

Special Provisions -Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.
Supplemental Specifications - Additions or revisions to the Standard Specifications.
Mandatory Revisions - Critical modifications implemented and added to the Workbook.

 File NameSpecial ProvisionsUsage Note
SP0020100BDIPROPOSAL REQUIREMENTS AND CONDITIONS (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-21-16) (FA 4-21-16) (1-19)
Changes to: 2-1, 2-7.
Use with the approval of the District Program Management Office.
Use with SP0030201BDI, SP0071302BDI and SP0080100BDI.
SP0020400PROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK.
(REV 11-3-15) (FA 1-27-16) (1-19)
Insert Information Required.
Changes to: 2-4.
All Jobs (Add a phone number or email address)
Do not use withSP0020400-60day.
SP0020400-60dayPROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK (60 DAY AD).
(REV 4-11-16) (FA 7-1-16) (1-19)
Insert Information Required.
Changes to: 2-4.
Jobs with 60-day Ads. (Add a phone number or email address)
Do not use withSP0020400.
SP0020501ABPROPOSAL REQUIREMENTS AND CONDITIONS - PREPARATION OF PROPOSALS (A+B BIDDING).
(REV 6-22-04) (FA 7-13-04) (1-19)
Changes to: 2-5.1.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0030100AB, SP0030203AB, SP0080701AB and SP0081300AB.
SP0020501LRPROPOSAL REQUIREMENTS AND CONDITIONS - PREPARATION OF PROPOSALS (LANE RENTAL).
(REV 2-21-05) (FA 3-31-05) (1-19)
Insert Information Required.
Changes to: 2-5.1.
Lane Rental. Use with the approval of the District Construction Engineer.
Use with SP0030100LR, SP0081300LRDR and SP0081300LR.
SP0030100AWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS - SCOPE ALTERNATES.
(REV 11-3-15) (FA 11-20-15) (1-19)
Changes to: 3-1.
Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
*Notify Contracts Office on Transmittal Memo.
SP0030100ABAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (A+B BIDDING).
(REV 11-5-97) (FA 1-20-98) (1-19)
Insert Information Required
Changes to: 3-1.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030203AB, SP0080701AB and SP0081300AB.
SP0030100BCAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (BUDGETARY CONSTRAINTS).
(REV 11-3-15) (FA 11-20-15) (1-19)
Insert Information Required
Changes to: 3-1.
Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
*Notify the Contracts Administration Office on the Transmittal Memo.
SP0030100LRAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (LANE RENTAL).
(REV 11-3-15) (FA 11-20-15) (1-19)
Changes to: 3-1.
Lane Rental. Use with the approval of the District Construction Engineer.
Use with SP0020501LR, SP0081300LR and SP0081300LRDR.
SP0030100LSAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (LUMP SUM).
(REV 8-1-00) (1-19)
Changes to: 3-1.
Lump Sum Projects.
SP0030200AWARD AND EXECUTION OF CONTRACT (TIMEFRAME MODIFICATION).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required
Changes to: 3-2, 3-6, 3-7.
Use when modifying the “Award and Execution” timeframes in the Standard Specifications.
*Contracts Office must approve.
SP0030201BDIAWARD AND EXECUTION OF CONTRACT (BUSINESS DEVELOPMENT INITIATIVE).
(REV 5-13-15) (FA 7-13-15)(1-19)
Changes to: 3-2.1, 3-2.2, 3-6, 3-7.
Use with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0071302BDI, and SP0080100BDI.
SP0030203ABAWARD AND EXECUTION OF CONTRACT - AWARD OF CONTRACTS (A+B BIDDING)
(REV 8-22-96) (FA 9-3-96) (1-19)
Insert Information Required
Changes to: 3-2.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030100AB, SP0080701AB, and SP0081300AB.
SP0030900AWARD AND EXECUTION OF CONTRACT - PUBLIC RECORDS
(REV 10-17-16) (FA 10-24-16 ) (1-19)
Changes to: 3-9.
All Jobs.
SP0040100SCOPE OF THE WORK - INTENT OF CONTRACT.
(REV 8-19-09) (FA 8-24-09) (1-19)
Insert Information Required.
Changes to: 4-1.
All Jobs, excluding Lump Sum.
SP0040100LSSCOPE OF THE WORK (LUMP SUM).
(REV 6-3-16) (FA 6-9-16) (1-19)
Insert Information Required.
Changes to: 4-1, 4-3.1, 4-3.4, 4-3.9.4.
Lump Sum Projects.
SP0050101LSCONTROL OF THE WORK (LUMP SUM).
(REV 3-15-02) (1-19)
Changes to: 5-1.1, 5-2, 5-7.6.
Lump Sum Projects.
SP0050901CONTROL OF THE WORK - GENERAL INSPECTION REQUIREMENTS - COOPERATION BY THE CONTRACTOR.
(REV 2-10-94) (1-19)
Changes to: 5-9.1
Long bridge jobs (1500 feet or longer); modify to suit.
SP0060100LSCONTROL OF MATERIALS - ACCEPTANCE CRITERIA (LUMP SUM).
(REV 8-17-09) (FA 8-24-09) (1-19)
Changes to: 6-1.
Lump Sum Projects.
SP0070101LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED (COMPLIANCE WITH FHWA 1273).
(REV 1-2-14) (1-16-14) (1-19)
Changes to: 7-1.1.
Use on all Federal Aid Jobs.
SP0070104-1LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (BEAR).
(REV 6-6-17) (FA 6-13-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Bear)
SP0070104-2LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (EAGLE).
(REV 6-16-17) (FA 6-28-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Eagle)
SP0070104-3LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (GOPHER TORTOISE).
(REV 6-15-17) (FA 6-20-17) (1-19)

Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Gopher Tortoise)
SP0070104-4LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (MANATEE).
(REV 6-15-17) (FA 6-20-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Manatee)
SP0070104-5LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SAWFISH).
(REV 5-25-17) (FA 6-13-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Sawfish)
SP0070104-6LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SEA TURTLE).
(REV 5-25-17) (FA 6-28-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Sea Turtle)
SP0070104-7LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (INDIGO SNAKE).
(REV 5-25-17) (FA 6-13-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Indigo Snake)
SP0070104-8LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (STURGEON).
(REV 5-25-17) (FA 6-28-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Sturgeon)
SP0070201ALEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PERMITS AND LICENSES (PERMITS PROCURED BY THE DEPARTMENT).
(REV 11-10-16) (FA 1-26-17) (1-19)
Changes to: 7-2.1.
Jobs with permits procured by DOT.
SP0070202LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S., WATERS OF THE U.S. AND WATERS OF THE STATE (DISCHARGE TO).
(REV 6-9-15) (FA 7-22-15) (1-19)

Changes to: 7-2.2.
When SWPPP is used. (One or more acres disturbed.)
SP0071101-tollsLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY (TOLL FACILITIES).
(REV 7-22-14) (FA 10-15-14) (1-19)
Changes to: 7-11.1, 7-11.2.
Use with the approval of the District Traffic Operations Engineer.
SP0071104RRLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - OPERATIONS WITHIN THE RAILROAD RIGHT-OF-WAY.
(REV 3-11-16) (FA 8-2-16) (1-19)
Changes to: 7-11.4.
Projects involving CSX Transportation, NS, FEC, or operations within the South Florida Rail Corridor and the Central Florida Rail Corridor Right of Way
SP0071105FGTLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - FLORIDA GAS TRANSMISSION COMPANY, LLC (FGT) FACILITIES.
(REV 4-6-16) (FA 4-20-16) (1-19)
Changes to: 7-11.5.
Use when Florida Gas Transmission Company, LLC (FGT) is within the project limits.
Use with SP0071201FGT.
SP0071153ALEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - UTILITY ADJUSTMENTS (NO UTILITY WORK SCHEDULES).
(REV 2-10-94) (1-19)
Changes to: 7-11.5.3.
When there are no utility work schedules.
SP0071153BLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - UTILITY ADJUSTMENTS (UTILITY WORK SCHEDULES).
(REV 11-10-16) (FA 1-26-17) (1-19)
Changes to: 7-11.5.3.
When there are utility work schedules.
SP0071201FGTLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC (FLORIDA GAS TRANSMISSION (FGT) COMPANY, LLC ENCROACHMENT AGREEMENTS).
(REV 7-28-16) (FA 7-31-15) (1-19)
Changes to: 7-12.1, 7-13.2, 7-13.4.
Use when Florida Gas Transmission Company, LLC (FGT) is within the project limits.
Use with SP0071105FGT.
SP0071302BDILEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - INSURANCE - COMMERCIAL GENERAL LIABILITY INSURANCE (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-10-15) (FA 7-31-15) (1-19)
Changes to: 7-13.2
Use with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0030201BDI, and SP0080100BDI.
SP0071600LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WAGE RATES FOR FEDERAL-AID PROJECTS.
(REV 9-1-17) (FA 10-31-17) (1-19)
Insert Information Required.
Changes to: 7-16.
All Federal Aid Jobs.
SP0072700LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS.
(REV 4-25-02) (FA 7-17-02) (1-19)
Changes to: Section 7.
Non-Federal Aid Projects.
SP0072800LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PREFERENCE TO STATE RESIDENTS.
(REV 1-13-12) (1-19)
Changes to: Section 7.
Non-Federal Aid Projects.
Construction Projects Only.
SP0072900LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - E-VERIFY.
(REV 6-13-11) (FA 6-16-11) (1-19)
Changes to: Section 7.
All Jobs.
SP0073000LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - SCRUTINIZED COMPANIES.
(REV 3-22-18) (1-19)
Changes to: Section 7.
All Jobs.
SP0073100LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - TITLE VI ASSURANCE - DOT 1050.2, APPENDIX A and APPENDIX E.
(REV 5-27-16) (FA 6-2-16) (1-19)
Changes to: Section 7.
All Federally Funded Jobs.
SP0080100BDIPROSECUTION AND PROGRESS - SUBLETTING OR ASSIGNING OF CONTRACTS (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-21-15) (FA 7-13-15) (1-19)

Changes to: 8-1.
Use with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0030201BDI, and SP0071302BDI.
SP0080302APROSECUTION AND PROGRESS - PROSECUTION OF WORK (SUBMISSION OF WORKING SCHEDULE).
(REV 11-13-14) (FA 1-22-15) (1-19)
Changes to: 8-3.2.
Use only when CPM is authorized by District Construction Engineer.
SP0080303APROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (FLEXIBLE START TIME).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required
Changes to: 8-3.3.
When called for by the District Construction Engineer or the District Maintenance Engineer/Administrator.
*Contracts Office must be notified.
SP0080303BPROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (NOTICE TO PROCEED).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required
Changes to: 8-3.3.
When called for by the District Construction Engineer.
Use with the approval of the Chief Engineer.
SP0080303CPROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (MANDATORY START DATE).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required.
Changes to: 8-3.3.
When called for by the District Construction Engineer.
Use with the approval of the Chief Engineer.
*Contracts Office must be notified.
SP0080306PROSECUTION AND PROGRESS - PROSECUTION OF WORK - PARTNERING.
(REV 5-15-12) (FA 5-21-12) (1-19)
Insert Information Required.
Changes to: 8-3.
 999-16
*Contracts Office must be notified.
SP0080307DRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (1-19)
Changes to: 8-3.
J999-20 Items
*Contracts Office must be notified.
SP0080307RDRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (1-19)
Changes to: 8-3.
Jobs without 999-20 Pay Items.
SP0080308SDRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - STATEWIDE DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (1-19)
Changes to: 8-3.
Jobs with 334, 337, 350, 570 or 649 Pay Items.
SP0080401LSPROSECUTION AND PROGRESS – COMPUTATION OF CONTRACT TIME – ADJUSTING CONTRACT TIME – INCREASED WORK (LUMP SUM).
(REV 8-1-00) (1-19)
Changes to: 8-4.1, 8-7.3.1.
Lump Sum Projects
SP0080408PROSECUTION AND PROGRESS - LIMITATIONS OF OPERATIONS - FENCING.
(REV 6-17-04) (FA 7-13-04) (1-19)
Changes to: 8-4.8.
Jobs on Limited Access Highways
SP0080409PROSECUTION AND PROGRESS - LIMITATIONS OF OPERATIONS - CONTAMINATED MATERIAL (MERCURY-CONTAINING DEVICES AND LAMPS).
(REV 11-6-95) (FA 12-27-95) (1-19)
Insert Information Required.
Changes to: 8-4.9.
Jobs with Lighting
SP0080701APROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (REDUCED PRODUCTIVITY).
(REV 12-22-98) (FA 1-19-99) (1-19)
Insert Information Required.
Changes to: 8-7.1.
Use with approval of the District Construction Engineer.
SP0080701ABPROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (A+B BIDDING).
(REV 7-24-96) (FA 9-3-96) (1-19)
Changes to: 8-7.1.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030100AB, SP0030203AB, and SP0081300AB.
SP0080701BPROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (SHORTENED CONTRACT TIME).
(REV 2-14-94) (1-19)
Insert Information Required.
Changes to: 8-7.1.
Use with the approval of the Chief Engineer.
SP0080701CPROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (HIGHER PRODUCTION RATES).
(REV 12-22-98) (FA 2-1-99) (1-19)
Changes to: 8-7.1.
Use when requested by the District Construction Engineer.
SP0081000PROSECUTION AND PROGRESS - LIQUIDATED DAMAGES FOR FAILURE TO COMPLETE THE WORK.
(REV 11-30-16) (FA 1-27-17) (1-19)
Insert Information Required.
Changes to: Section 8-10.1, 8-10-2.
Use on all revenue producing projects.
SP0081200PROSECUTION AND PROGRESS - DAMAGE RECOVERY (USER COST).
(REV 2-4-04) (1-19)
Insert Information Required.
Changes to: 8-12.
Use when requested by the District Construction Engineer.
(Do not use with Lane Rental)
SP0081300APROSECUTION AND PROGRESS - ALTERNATIVE BIDDING.
(REV 7-28-97) (1-19)
Changes to: Section 8.
All Jobs with Alternative Bidding. Use with the approval of the District Construction Engineer.
SP0081300AB8-13. Incentive - Disincentive for A+B.
(REV 7-27-04) (FA 7-28-04) (1-13)
Insert Information Required.
Changes to: 8-13.
A+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030100AB, SP0030203AB, and SP0080701AB.
SP0081300ABB8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 5-19-04) (FA 7-13-04) (1-05)
Insert Information Required.
Changes to: 8-13.
A+B Jobs with Bonus. Use with the approval of the District Construction Engineer.
SP0081300B88-13. " Bonus " Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Changes to: 8-13.
Bonus (Date Specific) Use with the approval of the District Construction Engineer.
SP0081300BCD8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Changes to: 8-13.
Bonus (Calendar Days) Use with the approval of the District Construction Engineer.
SP0081300ID8-13. Incentive - Disincentive.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Changes to: 8-13.
Incentive - Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300MID.
SP0081300IDLR8-13. Incentive - Disincentive for Lane Rental Days.
(REV 9-25-03) (FA 12-24-03) (7-04)
Insert Information Required.
Changes to: 8-13.
Incentive-Disincentive for Lane Rental Days. Use with the approval of the District Construction Engineer. Do not use with SP0081300LR or SP0081300LRDR.
SP0081300LQS8-13. Liquidated Savings for Early Completion.
(REV 5-18-99) (FA 6-10-99) (7-00)
Insert Information Required.
Changes to: 8-13.
Liquidated Savings. Use with the approval of the District Construction Engineer.
SP0081300LR8-13. Pay Adjustment For Fewer-More Lane Rental Days.
(REV 4-29-97) (FA 5-7-97) (7-00)
Changes to: 8-13.
Lane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR, and SP0081300LRDR.
SP0081300LRDR8-13. Damage Recovery.
(REV 9-25-03) (FA 12-24-03) (7-04)
Insert Information Required.
Changes to: 8-13.
Lane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR, and SP0081300LR.
SP0081300MB8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 4-12-06) (FA 4-25-06) (1-07)
Insert Information Required.
Changes to: 8-13.
Milestone Bonus. Use with the approval of the District Construction Engineer. Do not use with SP0081300B or SP0081300BCD.
SP0081300MID8-13. Incentive - Disincentive.
(REV 2-9-06) (FA 4-25-06) (1-07)

Insert Information Required.
Changes to: 8-13.
Milestone Incentive-Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300ID.
SP0090103LSMEASUREMENT AND PAYMENT (LUMP SUM).
(REV 11-4-16) (FA 1-6-17) (1-19)
Changes to: 9-1.3, 9-2, 9-3, 9-5.5.2, 9-11.
Lump Sum Projects.
SP1100601CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES - GENERAL.
(REV 9-10-07) (FA 2-15-08) (1-19)
Insert Information Required.
Changes to: 110-6.1.
Use when requested by the District Construction Engineer. Must have signed agreement from the Local Agency receiving the material.
SP1100606CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES - ASBESTOS CONTAINING MATERIALS (ACM) IDENTIFIED PRIOR TO THE WORK.
(REV 11-10-16) (FA 1-26-17) (1-19)
Changes to: 110-6.
Use when areas of Asbestos Abatement are identified in the Plans.
SP1101107CLEARING AND GRUBBING (MATERIAL FOR REEF ESTABLISHMENT).
(REV 7-10-95) (FA 6-21-99) (1-19)

Changes to: 110-11.7, 110-12.7.
Jobs with 110-84 Pay Item.
SP1200100AEXCAVATION AND EMBANKMENT - DESCRIPTION - IDENTIFIED AREAS OF CONTAMINATION.
(REV 10-10-16) (FA 1-26-17 ) (1-189
Changes to: 120-1.
Use when contaminated areas are delineated in the Plans.
SP3270100MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 8-31-99) (FA 2-14-00) (1-19)
Insert Information Required.
Changes to: 327-1, 327-6.
When the Plans provide a location for stockpiling milled material. Insert quantity to be retained. Use "all, tons, square yards", etc.
SP3270200MILLING OF EXISTING ASPHALT PAVEMENT - EQUIPMENT.
(REV 12-1-93) (1-19)
Changes to: 327-2.
Use when requested by the District.
SP3300802HOT MIX ASPHALT - GENERAL CONSTRUCTION REQUIREMENTS.
(REV 2-22-18) (FA 2-22-18) (1-19)
Changes to: 330-8.2, 330-9.4, 330-9.5.
Smooth pavement, for interstate and limited access roadway projects only.
Use with the approval of the District Construction Engineer.
SP3500200CEMENT CONCRETE PAVEMENT (COLORED CONCRETE).
(REV 5-11-16) (FA 5-12-16) (1-19)
Changes to: 350-1, 350-2, 350-10.
Use when the Plan
pay item 350-30 is included or colored structural concrete is included.
SP4570000INTEGRAL PILE AND COLUMN JACKETS.
(REV 1-7-16) (FA 1-14-16) (1-19)
Changes to: 457.
457 Items
SP5800000LANDSCAPING.
(REV 7-31-17) (FA 8-9-17) (1-19)
Changes to: 580.
Non-Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
SP5800000FALANDSCAPING.
(REV 7-31-17) (FA 8-9-17) (1-19)

Changes to: 580.
All Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
SP6390100CIACELECTRICAL POWER SERVICE ASSEMBLIES - DESCRIPTION (Contribution-in-Aid-of Construction).
(REV 6-12-18) (FA 7-2-18) (1-19)
Changes to 639.
Use with approval of the District Utility Administrator.
SP6870000HIGHWAY ADVISORY RADIO.
(REV 10-16-15) (FA 12-31-15) (1-19)
Use with the approval of the Chief Engineer.
Supplemental Spec NameSupplemental SpecificationsUsage Note
- -- -- -
TSP NameTECHNICAL SPECIAL PROVISIONSUsage Note
XTSPsThe following Technical Special Provisions are individually signed and sealed but are included as part of this Specifications Package.Jobs with Technical Special Provisions. 
 


 

Effective January - June 2017

Special Provisions -Specific clauses adding to or revising the Standard Specifications, setting forth conditions varying from or additional to the Standard Specifications for a specific project.
Supplemental Specifications - Additions or revisions to the Standard Specifications.
Mandatory Revisions - Critical modifications implemented and added to the Workbook.

 File NameSpecial ProvisionsUsage Note
SP0020100BDIPROPOSAL REQUIREMENTS AND CONDITIONS (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-21-16) (FA 4-21-16) (1-19)
Changes to: 2-1, 2-7.
Use with the approval of the District Program Management Office.
Use with SP0030201BDI, SP0071302BDI and SP0080100BDI.
SP0020400PROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK.
(REV 11-3-15) (FA 1-27-16) (1-19)
Insert Information Required.
Changes to: 2-4.
All Jobs (Add a phone number or email address)
Do not use withSP0020400-60day.
SP0020400-60dayPROPOSAL REQUIREMENTS AND CONDITIONS - EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK (60 DAY AD).
(REV 4-11-16) (FA 7-1-16) (1-19)
Insert Information Required.
Changes to: 2-4.
Jobs with 60-day Ads. (Add a phone number or email address)
Do not use withSP0020400.
SP0020501ABPROPOSAL REQUIREMENTS AND CONDITIONS - PREPARATION OF PROPOSALS (A+B BIDDING).
(REV 6-22-04) (FA 7-13-04) (1-19)
Changes to: 2-5.1.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0030100AB, SP0030203AB, SP0080701AB and SP0081300AB.
SP0020501LRPROPOSAL REQUIREMENTS AND CONDITIONS - PREPARATION OF PROPOSALS (LANE RENTAL).
(REV 2-21-05) (FA 3-31-05) (1-19)
Insert Information Required.
Changes to: 2-5.1.
Lane Rental. Use with the approval of the District Construction Engineer.
Use with SP0030100LR, SP0081300LRDR and SP0081300LR.
SP0030100AWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS - SCOPE ALTERNATES.
(REV 11-3-15) (FA 11-20-15) (1-19)
Changes to: 3-1.
Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
*Notify Contracts Office on Transmittal Memo.
SP0030100ABAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (A+B BIDDING).
(REV 11-5-97) (FA 1-20-98) (1-19)
Insert Information Required
Changes to: 3-1.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030203AB, SP0080701AB and SP0081300AB.
SP0030100BCAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (BUDGETARY CONSTRAINTS).
(REV 11-3-15) (FA 11-20-15) (1-19)
Insert Information Required
Changes to: 3-1.
Use at the direction of the District Construction Engineer in accordance with the Work Program Instructions.
*Notify the Contracts Administration Office on the Transmittal Memo.
SP0030100LRAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (LANE RENTAL).
(REV 11-3-15) (FA 11-20-15) (1-19)
Changes to: 3-1.
Lane Rental. Use with the approval of the District Construction Engineer.
Use with SP0020501LR, SP0081300LR and SP0081300LRDR.
SP0030100LSAWARD AND EXECUTION OF CONTRACT - CONSIDERATION OF BIDS (LUMP SUM).
(REV 8-1-00) (1-19)
Changes to: 3-1.
Lump Sum Projects.
SP0030200AWARD AND EXECUTION OF CONTRACT (TIMEFRAME MODIFICATION).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required
Changes to: 3-2, 3-6, 3-7.
Use when modifying the “Award and Execution” timeframes in the Standard Specifications.
*Contracts Office must approve.
SP0030201BDIAWARD AND EXECUTION OF CONTRACT (BUSINESS DEVELOPMENT INITIATIVE).
(REV 5-13-15) (FA 7-13-15)(1-19)
Changes to: 3-2.1, 3-2.2, 3-6, 3-7.
Use with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0071302BDI, and SP0080100BDI.
SP0030203ABAWARD AND EXECUTION OF CONTRACT - AWARD OF CONTRACTS (A+B BIDDING)
(REV 8-22-96) (FA 9-3-96) (1-19)
Insert Information Required
Changes to: 3-2.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030100AB, SP0080701AB, and SP0081300AB.
SP0030900AWARD AND EXECUTION OF CONTRACT - PUBLIC RECORDS
(REV 10-17-16) (FA 10-24-16 ) (1-19)
Changes to: 3-9.
All Jobs.
SP0040100SCOPE OF THE WORK - INTENT OF CONTRACT.
(REV 8-19-09) (FA 8-24-09) (1-19)
Insert Information Required.
Changes to: 4-1.
All Jobs, excluding Lump Sum.
SP0040100LSSCOPE OF THE WORK (LUMP SUM).
(REV 6-3-16) (FA 6-9-16) (1-19)
Insert Information Required.
Changes to: 4-1, 4-3.1, 4-3.4, 4-3.9.4.
Lump Sum Projects.
SP0050101LSCONTROL OF THE WORK (LUMP SUM).
(REV 3-15-02) (1-19)
Changes to: 5-1.1, 5-2, 5-7.6.
Lump Sum Projects.
SP0050901CONTROL OF THE WORK - GENERAL INSPECTION REQUIREMENTS - COOPERATION BY THE CONTRACTOR.
(REV 2-10-94) (1-19)
Changes to: 5-9.1
Long bridge jobs (1500 feet or longer); modify to suit.
SP0060100LSCONTROL OF MATERIALS - ACCEPTANCE CRITERIA (LUMP SUM).
(REV 8-17-09) (FA 8-24-09) (1-19)
Changes to: 6-1.
Lump Sum Projects.
SP0070101LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED (COMPLIANCE WITH FHWA 1273).
(REV 1-2-14) (1-16-14) (1-19)
Changes to: 7-1.1.
Use on all Federal Aid Jobs.
SP0070104-1LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (BEAR).
(REV 6-6-17) (FA 6-13-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Bear)
SP0070104-2LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (EAGLE).
(REV 6-16-17) (FA 6-28-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Eagle)
SP0070104-3LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (GOPHER TORTOISE).
(REV 6-15-17) (FA 6-20-17) (1-19)

Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Gopher Tortoise)
SP0070104-4LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (MANATEE).
(REV 6-15-17) (FA 6-20-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Manatee)
SP0070104-5LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SAWFISH).
(REV 5-25-17) (FA 6-13-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Sawfish)
SP0070104-6LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (SEA TURTLE).
(REV 5-25-17) (FA 6-28-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Sea Turtle)
SP0070104-7LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (INDIGO SNAKE).
(REV 5-25-17) (FA 6-13-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Indigo Snake)
SP0070104-8LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - LAWS TO BE OBSERVED - COMPLIANCE WITH FEDERAL ENDANGERED SPECIES ACT AND OTHER WILDLIFE REGULATIONS (STURGEON).
(REV 5-25-17) (FA 6-28-17) (1-19)
Changes to: 7-1.4.
Use when called for by the District Environmental Permit Office (Sturgeon)
SP0070201ALEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PERMITS AND LICENSES (PERMITS PROCURED BY THE DEPARTMENT).
(REV 11-10-16) (FA 1-26-17) (1-19)
Changes to: 7-2.1.
Jobs with permits procured by DOT.
SP0070202LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WORK OR STRUCTURES IN NAVIGABLE WATERS OF THE U.S., WATERS OF THE U.S. AND WATERS OF THE STATE (DISCHARGE TO).
(REV 6-9-15) (FA 7-22-15) (1-19)

Changes to: 7-2.2.
When SWPPP is used. (One or more acres disturbed.)
SP0071101-tollsLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY (TOLL FACILITIES).
(REV 7-22-14) (FA 10-15-14) (1-19)
Changes to: 7-11.1, 7-11.2.
Use with the approval of the District Traffic Operations Engineer.
SP0071104RRLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - OPERATIONS WITHIN THE RAILROAD RIGHT-OF-WAY.
(REV 3-11-16) (FA 8-2-16) (1-19)
Changes to: 7-11.4.
Projects involving CSX Transportation, NS, FEC, or operations within the South Florida Rail Corridor and the Central Florida Rail Corridor Right of Way
SP0071105FGTLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - FLORIDA GAS TRANSMISSION COMPANY, LLC (FGT) FACILITIES.
(REV 4-6-16) (FA 4-20-16) (1-19)
Changes to: 7-11.5.
Use when Florida Gas Transmission Company, LLC (FGT) is within the project limits.
Use with SP0071201FGT.
SP0071153ALEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - UTILITY ADJUSTMENTS (NO UTILITY WORK SCHEDULES).
(REV 2-10-94) (1-19)
Changes to: 7-11.5.3.
When there are no utility work schedules.
SP0071153BLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC - PRESERVATION OF EXISTING PROPERTY - UTILITIES - UTILITY ADJUSTMENTS (UTILITY WORK SCHEDULES).
(REV 11-10-16) (FA 1-26-17) (1-19)
Changes to: 7-11.5.3.
When there are utility work schedules.
SP0071201FGTLEGAL REQUIREMENTS AND RESPONSIBILITIES TO THE PUBLIC (FLORIDA GAS TRANSMISSION (FGT) COMPANY, LLC ENCROACHMENT AGREEMENTS).
(REV 7-28-16) (FA 7-31-15) (1-19)
Changes to: 7-12.1, 7-13.2, 7-13.4.
Use when Florida Gas Transmission Company, LLC (FGT) is within the project limits.
Use with SP0071105FGT.
SP0071302BDILEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - INSURANCE - COMMERCIAL GENERAL LIABILITY INSURANCE (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-10-15) (FA 7-31-15) (1-19)
Changes to: 7-13.2
Use with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0030201BDI, and SP0080100BDI.
SP0071600LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - WAGE RATES FOR FEDERAL-AID PROJECTS.
(REV 9-1-17) (FA 10-31-17) (1-19)
Insert Information Required.
Changes to: 7-16.
All Federal Aid Jobs.
SP0072700LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - EQUAL EMPLOYMENT OPPORTUNITY REQUIREMENTS.
(REV 4-25-02) (FA 7-17-02) (1-19)
Changes to: Section 7.
Non-Federal Aid Projects.
SP0072800LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - PREFERENCE TO STATE RESIDENTS.
(REV 1-13-12) (1-19)
Changes to: Section 7.
Non-Federal Aid Projects.
Construction Projects Only.
SP0072900LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - E-VERIFY.
(REV 6-13-11) (FA 6-16-11) (1-19)
Changes to: Section 7.
All Jobs.
SP0073000LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - SCRUTINIZED COMPANIES.
(REV 3-22-18) (1-19)
Changes to: Section 7.
All Jobs.
SP0073100LEGAL REQUIREMENTS AND RESPONSIBILITY TO THE PUBLIC - TITLE VI ASSURANCE - DOT 1050.2, APPENDIX A and APPENDIX E.
(REV 5-27-16) (FA 6-2-16) (1-19)
Changes to: Section 7.
All Federally Funded Jobs.
SP0080100BDIPROSECUTION AND PROGRESS - SUBLETTING OR ASSIGNING OF CONTRACTS (BUSINESS DEVELOPMENT INITIATIVE).
(REV 4-21-15) (FA 7-13-15) (1-19)

Changes to: 8-1.
Use with the approval of the District Program Management Office.
Use with SP0020100BDI, SP0030201BDI, and SP0071302BDI.
SP0080302APROSECUTION AND PROGRESS - PROSECUTION OF WORK (SUBMISSION OF WORKING SCHEDULE).
(REV 11-13-14) (FA 1-22-15) (1-19)
Changes to: 8-3.2.
Use only when CPM is authorized by District Construction Engineer.
SP0080303APROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (FLEXIBLE START TIME).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required
Changes to: 8-3.3.
When called for by the District Construction Engineer or the District Maintenance Engineer/Administrator.
*Contracts Office must be notified.
SP0080303BPROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (NOTICE TO PROCEED).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required
Changes to: 8-3.3.
When called for by the District Construction Engineer.
Use with the approval of the Chief Engineer.
SP0080303CPROSECUTION AND PROGRESS - PROSECUTION OF WORK - BEGINNING WORK (MANDATORY START DATE).
(REV 3-2-17) (FA 4-27-17) (1-19)
Insert Information Required.
Changes to: 8-3.3.
When called for by the District Construction Engineer.
Use with the approval of the Chief Engineer.
*Contracts Office must be notified.
SP0080306PROSECUTION AND PROGRESS - PROSECUTION OF WORK - PARTNERING.
(REV 5-15-12) (FA 5-21-12) (1-19)
Insert Information Required.
Changes to: 8-3.
 999-16
*Contracts Office must be notified.
SP0080307DRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (1-19)
Changes to: 8-3.
J999-20 Items
*Contracts Office must be notified.
SP0080307RDRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - REGIONAL DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (1-19)
Changes to: 8-3.
Jobs without 999-20 Pay Items.
SP0080308SDRBPROSECUTION AND PROGRESS - PROSECUTION OF WORK - STATEWIDE DISPUTES REVIEW BOARD.
(REV 1-4-11) (FA 1-21-11) (1-19)
Changes to: 8-3.
Jobs with 334, 337, 350, 570 or 649 Pay Items.
SP0080401LSPROSECUTION AND PROGRESS – COMPUTATION OF CONTRACT TIME – ADJUSTING CONTRACT TIME – INCREASED WORK (LUMP SUM).
(REV 8-1-00) (1-19)
Changes to: 8-4.1, 8-7.3.1.
Lump Sum Projects
SP0080408PROSECUTION AND PROGRESS - LIMITATIONS OF OPERATIONS - FENCING.
(REV 6-17-04) (FA 7-13-04) (1-19)
Changes to: 8-4.8.
Jobs on Limited Access Highways
SP0080409PROSECUTION AND PROGRESS - LIMITATIONS OF OPERATIONS - CONTAMINATED MATERIAL (MERCURY-CONTAINING DEVICES AND LAMPS).
(REV 11-6-95) (FA 12-27-95) (1-19)
Insert Information Required.
Changes to: 8-4.9.
Jobs with Lighting
SP0080701APROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (REDUCED PRODUCTIVITY).
(REV 12-22-98) (FA 1-19-99) (1-19)
Insert Information Required.
Changes to: 8-7.1.
Use with approval of the District Construction Engineer.
SP0080701ABPROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (A+B BIDDING).
(REV 7-24-96) (FA 9-3-96) (1-19)
Changes to: 8-7.1.
A+B Bidding. Use with the approval of the District Construction Engineer.
Use with SP0020501AB, SP0030100AB, SP0030203AB, and SP0081300AB.
SP0080701BPROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (SHORTENED CONTRACT TIME).
(REV 2-14-94) (1-19)
Insert Information Required.
Changes to: 8-7.1.
Use with the approval of the Chief Engineer.
SP0080701CPROSECUTION AND PROGRESS - COMPUTATION OF CONTRACT TIME - GENERAL (HIGHER PRODUCTION RATES).
(REV 12-22-98) (FA 2-1-99) (1-19)
Changes to: 8-7.1.
Use when requested by the District Construction Engineer.
SP0081000PROSECUTION AND PROGRESS - LIQUIDATED DAMAGES FOR FAILURE TO COMPLETE THE WORK.
(REV 11-30-16) (FA 1-27-17) (1-19)
Insert Information Required.
Changes to: Section 8-10.1, 8-10-2.
Use on all revenue producing projects.
SP0081200PROSECUTION AND PROGRESS - DAMAGE RECOVERY (USER COST).
(REV 2-4-04) (1-19)
Insert Information Required.
Changes to: 8-12.
Use when requested by the District Construction Engineer.
(Do not use with Lane Rental)
SP0081300APROSECUTION AND PROGRESS - ALTERNATIVE BIDDING.
(REV 7-28-97) (1-19)
Changes to: Section 8.
All Jobs with Alternative Bidding. Use with the approval of the District Construction Engineer.
SP0081300AB8-13. Incentive - Disincentive for A+B.
(REV 7-27-04) (FA 7-28-04) (1-13)
Insert Information Required.
Changes to: 8-13.
A+B Bidding. Use with the approval of the District Construction Engineer. Use with SP0020501AB, SP0030100AB, SP0030203AB, and SP0080701AB.
SP0081300ABB8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 5-19-04) (FA 7-13-04) (1-05)
Insert Information Required.
Changes to: 8-13.
A+B Jobs with Bonus. Use with the approval of the District Construction Engineer.
SP0081300B88-13. " Bonus " Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Changes to: 8-13.
Bonus (Date Specific) Use with the approval of the District Construction Engineer.
SP0081300BCD8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Changes to: 8-13.
Bonus (Calendar Days) Use with the approval of the District Construction Engineer.
SP0081300ID8-13. Incentive - Disincentive.
(REV 7-27-04) (FA 7-28-04) (1-05)
Insert Information Required.
Changes to: 8-13.
Incentive - Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300MID.
SP0081300IDLR8-13. Incentive - Disincentive for Lane Rental Days.
(REV 9-25-03) (FA 12-24-03) (7-04)
Insert Information Required.
Changes to: 8-13.
Incentive-Disincentive for Lane Rental Days. Use with the approval of the District Construction Engineer. Do not use with SP0081300LR or SP0081300LRDR.
SP0081300LQS8-13. Liquidated Savings for Early Completion.
(REV 5-18-99) (FA 6-10-99) (7-00)
Insert Information Required.
Changes to: 8-13.
Liquidated Savings. Use with the approval of the District Construction Engineer.
SP0081300LR8-13. Pay Adjustment For Fewer-More Lane Rental Days.
(REV 4-29-97) (FA 5-7-97) (7-00)
Changes to: 8-13.
Lane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR, and SP0081300LRDR.
SP0081300LRDR8-13. Damage Recovery.
(REV 9-25-03) (FA 12-24-03) (7-04)
Insert Information Required.
Changes to: 8-13.
Lane Rental. Use with the approval of the District Construction Engineer. Use with SP0020501LR, SP0030100LR, and SP0081300LR.
SP0081300MB8-13. "Bonus" Payment and Waiver of Contractor Claims.
(REV 4-12-06) (FA 4-25-06) (1-07)
Insert Information Required.
Changes to: 8-13.
Milestone Bonus. Use with the approval of the District Construction Engineer. Do not use with SP0081300B or SP0081300BCD.
SP0081300MID8-13. Incentive - Disincentive.
(REV 2-9-06) (FA 4-25-06) (1-07)

Insert Information Required.
Changes to: 8-13.
Milestone Incentive-Disincentive. Use with the approval of the District Construction Engineer. Do not use with SP0081300ID.
SP0090103LSMEASUREMENT AND PAYMENT (LUMP SUM).
(REV 11-4-16) (FA 1-6-17) (1-19)
Changes to: 9-1.3, 9-2, 9-3, 9-5.5.2, 9-11.
Lump Sum Projects.
SP1100601CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES - GENERAL.
(REV 9-10-07) (FA 2-15-08) (1-19)
Insert Information Required.
Changes to: 110-6.1.
Use when requested by the District Construction Engineer. Must have signed agreement from the Local Agency receiving the material.
SP1100606CLEARING AND GRUBBING - REMOVAL OF EXISTING BRIDGES - ASBESTOS CONTAINING MATERIALS (ACM) IDENTIFIED PRIOR TO THE WORK.
(REV 11-10-16) (FA 1-26-17) (1-19)
Changes to: 110-6.
Use when areas of Asbestos Abatement are identified in the Plans.
SP1101107CLEARING AND GRUBBING (MATERIAL FOR REEF ESTABLISHMENT).
(REV 7-10-95) (FA 6-21-99) (1-19)

Changes to: 110-11.7, 110-12.7.
Jobs with 110-84 Pay Item.
SP1200100AEXCAVATION AND EMBANKMENT - DESCRIPTION - IDENTIFIED AREAS OF CONTAMINATION.
(REV 10-10-16) (FA 1-26-17 ) (1-189
Changes to: 120-1.
Use when contaminated areas are delineated in the Plans.
SP3270100MILLING OF EXISTING ASPHALT PAVEMENT.
(REV 8-31-99) (FA 2-14-00) (1-19)
Insert Information Required.
Changes to: 327-1, 327-6.
When the Plans provide a location for stockpiling milled material. Insert quantity to be retained. Use "all, tons, square yards", etc.
SP3270200MILLING OF EXISTING ASPHALT PAVEMENT - EQUIPMENT.
(REV 12-1-93) (1-19)
Changes to: 327-2.
Use when requested by the District.
SP3300802HOT MIX ASPHALT - GENERAL CONSTRUCTION REQUIREMENTS.
(REV 2-22-18) (FA 2-22-18) (1-19)
Changes to: 330-8.2, 330-9.4, 330-9.5.
Smooth pavement, for interstate and limited access roadway projects only.
Use with the approval of the District Construction Engineer.
SP3500200CEMENT CONCRETE PAVEMENT (COLORED CONCRETE).
(REV 5-11-16) (FA 5-12-16) (1-19)
Changes to: 350-1, 350-2, 350-10.
Use when the Plan
pay item 350-30 is included or colored structural concrete is included.
SP4570000INTEGRAL PILE AND COLUMN JACKETS.
(REV 1-7-16) (FA 1-14-16) (1-19)
Changes to: 457.
457 Items
SP5800000LANDSCAPING.
(REV 7-31-17) (FA 8-9-17) (1-19)
Changes to: 580.
Non-Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
SP5800000FALANDSCAPING.
(REV 7-31-17) (FA 8-9-17) (1-19)

Changes to: 580.
All Federal Aid Jobs with Landscaping.
Use when requested by the DDE.
SP6390100CIACELECTRICAL POWER SERVICE ASSEMBLIES - DESCRIPTION (Contribution-in-Aid-of Construction).
(REV 6-12-18) (FA 7-2-18) (1-19)
Changes to 639.
Use with approval of the District Utility Administrator.
SP6870000HIGHWAY ADVISORY RADIO.
(REV 10-16-15) (FA 12-31-15) (1-19)
Use with the approval of the Chief Engineer.
Supplemental Spec NameSupplemental SpecificationsUsage Note
- -- -- -
TSP NameTECHNICAL SPECIAL PROVISIONSUsage Note
XTSPsThe following Technical Special Provisions are individually signed and sealed but are included as part of this Specifications Package.Jobs with Technical Special Provisions.