2219 search results for bridge inspection

E8U69

 Florida Department of Transportation Bid Solicitation Notice and Approximate Quantities Letting: 08240213 Call Order: 001 Proposal: E8U69 District:08 Counties: PALM BEACH Road Name: WEST PALM BEACH SERVICE PLAZA PARKING IMP Limits: 93470000 Project(s): 44262515201(*) Federal Aid No: N/A Total Roadway Length: 1.183 Miles Contract Days: 772 Total Bridge Length: 0.000 Miles Letting Date, 0108- 1- MONITOR EXISTING STRUCTURES- INSPECTION AND SETTLEMENT MONITORING (44262515201) LS 1.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/feb13/e8u69.pdf?sfvrsn=dd3c0799_1

24P-010 PM 22-23 Final Report Signed

system contains the inspection data and inventory of state- owned bridges. On the last day of the FY, is the Maintenance Office bridge maintenance system housing performance data. Docusign Envelope ID

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ig/reports/24p-010-pm-22-23-final-report-signed.pdf?sfvrsn=98fc8d6b_1

Chapter3s5Redline

are required in the Consultant Construction Engineering and Inspection (CEI) Scope of Services, , Concrete, Earthwork, Bridge Quantities, and Final As-Built Plans are critical areas of high

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newhistory/chapter3s5redline.pdf?sfvrsn=b6c052bb_7

FMPP April 2024 Meeting Notes_04112024

▪ Using digital twins to provide smart parking in Saint Augustine ▪ Using drone analysis for bridge inspection ▪ Providing AI aerial vison mapping for roadway inventory ▪ Using Light Detection

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/policy/metrosupport/fmpp/2024_2-april/fmpp-april-2024-meeting-notes_04112024.pdf?sfvrsn=df86c817_1

0060000.origind

for Road and Bridge Construction (SSRBC). Please share this proposal with others within your, , to facilitate prompt inspection, and to minimize noise impacts on sensitive receivers. More detailed

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/internal/0060000.origind.pdf?sfvrsn=cb9f987d_0

Section24V2-722cln

Specifications for Road and Bridge Construction (Specifications) American Society for Testing, -Aid Policy Guide (FAPG), Construction Inspection and Approval, Subpart B – Quality Assurance

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/materials-manual/section24v2-722cln.pdf?sfvrsn=2ced1726_2

Section24V2-724cln

Specifications for Road and Bridge Construction (Specifications) American Society for Testing, -Aid Policy Guide (FAPG), Construction Inspection and Approval, Subpart B – Quality Assurance

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/materials-manual/section24v2-724cln.pdf?sfvrsn=e6c08680_1

July 2019 Workbook

- GENERAL INSPECTION REQUIREMENTS - COOPERATION BY THE CONTRACTOR.(REV 2-10-94) (7-19)Changes to: 5-9.1 SP0050901 Long bridge jobs (1500 feet or longer); modify to suit. CONTROL OF MATERIALS - ACCEPTANCE

https://www.fdot.gov/programmanagement/implemented/workbooks/julworkbook2019/july-2019-workbook

January 2019 Workbook

OF THE WORK - GENERAL INSPECTION REQUIREMENTS - COOPERATION BY THE CONTRACTOR.(REV 2-10-94) (1-19)Changes to: 5-9.1 SP0050901 Long bridge jobs (1500 feet or longer); modify to suit. CONTROL

https://www.fdot.gov/programmanagement/implemented/workbooks/janworkbook2019/default.shtm

July 2018 Workbook

OF THE WORK - GENERAL INSPECTION REQUIREMENTS - COOPERATION BY THE CONTRACTOR.(REV 2-10-94) (7-18)Changes to: 5-9.1 SP0050901 Long bridge jobs (1500 feet or longer); modify to suit. CONTROL

https://www.fdot.gov/programmanagement/implemented/workbooks/julworkbook2018/default.shtm

January 2018 Workbook

OF THE WORK - GENERAL INSPECTION REQUIREMENTS - COOPERATION BY THE CONTRACTOR.(REV 2-10-94) (1-18)Changes to: 5-9.1 SP0050901 Long bridge jobs (1500 feet or longer); modify to suit. CONTROL OF MATERIALS

https://www.fdot.gov/programmanagement/implemented/workbooks/janworkbook2018/default.shtm

July 2017 Workbook

3-15-02) (7-17)Changes to: 5-1.1, 5-2, 5-7.6. SP0050101LS Lump Sum Projects INSPECTION.(REV 2-10-94) (7-17)Changes to: 5-9.1 SP0050901 Long bridge jobs (1500 feet or longer); modify to suit. CONTROL

https://www.fdot.gov/programmanagement/implemented/workbooks/julworkbook2017/default.shtm

January 2017 Workbook

Projects INSPECTION.(REV 2-10-94) (1-17)Changes to: 5-9.1 SP0050901 Long bridge jobs (1500 feet or longer

https://www.fdot.gov/programmanagement/implemented/workbooks/janworkbook2017/default.shtm

BAK2015

Church Macclenny Refuse Dump Steel Bridge Road Boat Ramp Manntown Church Monument Cemetery, Township or Range Line Section Line National Forest State Forest State Park Agricultural Inspection

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/co-gis/countymaps/newformat/bak2015.pdf?sfvrsn=36d67cc0_7

Baker_2015

Church Macclenny Refuse Dump Steel Bridge Road Boat Ramp Manntown Church Monument Cemetery, Township or Range Line Section Line National Forest State Forest State Park Agricultural Inspection

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/co-gis/countymaps/baker_2015.pdf?sfvrsn=65824bb7_1

19-09-Freeman-SRCUpdate

 6/25/2025 1 Structures Research Center Update Christina Freeman & Olga Iatsko FDOT Structures Research Center FDOT Structures Lab https://www.fdot.gov/structures/StructuresResearchCenter/default.shtm 2  Outdoor facility:a 2.5-acre yard for outdoor testing, storing specimens, Impact pendulum, and two semi-trucks with steel blocks for bridge testing.  Indoor facility: 50’ x 100, /completedresearch.shtm 9 INITIAL INSPECTION: 1.Performacloseinvestigationforcracksduetotheimpact

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2025-june/19-09-freeman-srcupdate.pdf?sfvrsn=7983c057_1

Section24V2-724

Specifications for Road and Bridge Construction (Specifications) American Society for Testing, ), Federal-Aid Policy Guide (FAPG), Construction Inspection and Approval, Subpart B – Quality Assurance

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/materials-manual/redline/section24v2-724.pdf?sfvrsn=560b7fe5_1

Chapter3s5

projects, QARs are required in the Consultant Construction Engineering and Inspection (CEI) Scope, District. Asphalt, Concrete, Earthwork, Bridge Quantities, and Final As-Built Plans are critical areas

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/chapter3s5.pdf?sfvrsn=77cf6abf_13

9920000.impl

poles shall be installed on transformer bases with the exception of lights installed on bridge, shall be satisfactorily passed. The connectors shall be unmated and caps removed. Inspection shall, be performed. The connectors shall be unmated and caps removed. Inspection shall indicate that water

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/implemented/9920000.impl.pdf?sfvrsn=70edb14e_0
20 of 2219 results