3165 search results for intersection
E1X74BidTabs
TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 160.000 ED 33.82000 5,411.20 39.59000 6,334.40 32.00000 5,120.00 0050 0102107 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION, SECTION: 0045 0102104 TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 160.000 ED, , INTERSECTION 160.000 ED 35.00000 5,600.00 300.00000 48,000.00 0055 0104 10 3 SEDIMENT BARRIER
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/bidtabs/2025/sep18/e1x74bidtabs.pdf?sfvrsn=88d79e6b_12026FDM273LandscapeMaintenanceGuide
crossings, median treatment) (2) Preserve required distances, such as: (a) Stopping and intersection
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm273landscapemaintenanceguide.pdf?sfvrsn=57333927_14 - Evaluation Matrix
at Old Griffin Road intersection. *Right-of-way cost shown is associated to roadway improvements
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/i95-south-broward/4---evaluation-matrix.pdf?sfvrsn=28d809d3_1DanforthGEOPAKFDOTSS4Templates
typical end conditions 4.Add special end conditions in separate templates 5.Add intersection
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cadd/downloads/archived-documentations/danforthgeopakfdotss4templates.pdf?sfvrsn=a157efc0_2Historical Item Averages Market Area 14
TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 0102107 1 1 $10.62 $38,232.00 3,600.000 ED N TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 0102115 4 $.54 $4,182.08 7,728.000 ED N, 12.000 PI N SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL 0632 7 2 1 $6.46, $32,450.00 11.000 PI N SIGNAL CABLE, REMOVE- INTERSECTION 0633 8 11 1 $2.80 $644.00 230.000 LF N MULTI
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/market-area/pdf/historical-item-averages-market-area-14.pdf?sfvrsn=798f3e42_5D4-10-04-24BSN
, INTERSECTION ED 208.000 Page 7 Bid Solicitation Notice - Proposal Item Quantities Call Order, AND MAINTENANCE, INTERSECTION ED 208.000 0102-115- TYPE III BARRICADE ED 258.000 0104- 18- INLET, , TEMPORARY ED 1,158.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 670.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 670.000 0102-115- TYPE, , DIRECTIONAL BORE LF 1,017.000 0632- 7- 1 SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2024/oct04/d4-10-04-24bsn.pdf?sfvrsn=d1bd4038_1Archive
/C N/C Approved 102-615 Multilane Roadway, Intersection Work N/C N/C Approved 521-001 Concrete, -Way, Intersection Work N/C N/C Approved 102-606 Two-Lane Roadway, Lane Closure Using Temporary, Roadway, Intersection Work N/C N/C Approved 102-680 Haul Road Crossing N/C N/C Approved 649-030, the Travel Way Response Package Response Package Approved 102-604 Two-Lane, Two-Way, Intersection Work, Package Response Package Approved 102-615 Multilane Roadway, Intersection Work N/C Response Package
https://www.fdot.gov/design/standardplans/irr/arcive.shtm2024-01-10 HOA Johnson ST Business District Association Presentation
volumes, proximity to a BCR Station, and proximity of adjacent intersections • These 7 crossings, operational analysis (existing & future) • Intersections level of service • Queuing analysis
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/projects_browardcommuterrail/civic-association-presentations/2024-01-10-hoa-johnson-st-business-district-association-presentation.pdf?sfvrsn=cea38c_1FAQs - Archive
arterial connections. Additionally, the project will reconstruct four intersections and one major, SW 10th Street, including at intersections such as Military Trail, Newport Center Drive, and the I-95
https://www.fdot.gov/projects/sr869-sw10st-i95/faqsarchiveFAQs
intersections and one major interchange, including Powerline Road at Military Trail and SW 10th Street, duration of work along local SW 10th Street, including at intersections such as Military Trail
https://www.fdot.gov/projects/sr869-sw10st-i95/faqs4551604.FHWA
to placing concrete. Tie all intersections of drilled shaft reinforcing steel with cross ties or “figure 8, all intersections of drilled shaft reinforcing steel with cross ties or “figure 8” ties. Use double
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/fhwa/4551604.fhwa.pdf?sfvrsn=17b5011_020-08-Young-HumanFactorsInEngineering
left-turn crashes at unsignalized intersections are caused by misjudged gaps. • Driver perception, if speeds of oncoming vehicles are higher. LEFT-TURNS AT UNSIGNALIZED INTERSECTIONS 27 • If designs
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2025-june/20-08-young-humanfactorsinengineering.pdf?sfvrsn=df749cc7_1FMPP_Presentation_07232025
1,407 1,442 2,890 3,358 4,189 ROAD USERS USER BEHAVIOR Lane Departures Intersections, Analysis) • TEO’s SAFE Candidate Intersections & Segment Network Screening • Bike Path
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/policy/metrosupport/fmpp/2025_3-july/fmpp_presentation_07232025.pdf?sfvrsn=cc9f0344_1E6O83
- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 400.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 400.000 0102-115- TYPE III BARRICADE ED 100.000 0104- 18- INLET
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/lettings/2023/sep28/e6o83.pdf?sfvrsn=a396a8ca_1RTOC
for Manholes and Inlets 102-604 Two-Lane, Two-Way, Intersection Work 425-010 Structure Bottoms - Type J and P, , Lane Closures 425-023 Curb Inlet - Type 8 102-615 Multilane Roadway, Intersection Work 425-024 Curb
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/rtoc.pdf?sfvrsn=c8fe4ca3_2E1V08BidTabs
15,235.20 0075 0102104 TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 350.000 ED 25.00000, : 0080 0102107 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 350.000 ED 25.00000
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/bidtabs/2023/nov23/e1v08bidtabs.pdf?sfvrsn=c880849d_1Z4122-R0
, FURNISH & INSTALL, ABOVEGROUND LF 50.000 0632- 7- 1 SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, EA 5.000 0670- 4- 1 INTERSECTION CONTROL BEACON CONTROLLER ASSEMBLY, FURNISH & INSTALL AS 10.000
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2024/feb04/z4122-r0.pdf?sfvrsn=cedfcc9c_1E21F7-R0
- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 150.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 150.000 0102-115- TYPE III BARRICADE ED 1,000.000 0102-120
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2024/feb15/e21f7-r0.pdf?sfvrsn=526aff3b_120240130_451358-1_SR 45_01010
: Crack Type SR 45 (US 41) Intersection at Midway Blvd Cored By: Median Curbed (Y/N): 19.594 / 0.258, : To: From: MADRID CPWG Coring Completion Date: Crack Type SR 45 (US 41) Intersection at Midway Blvd
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/coringdata/d1/01/20240130_451358-1_sr-45_01010.pdf?sfvrsn=c81b789e_1Z6163-R0
SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL PI 100.000 0632- 7- 2 SIGNAL CABLE, INTERSECTION CONTROL BEACON CONTROLLER ASSEMBLY, FURNISH & INSTALL AS 5.000 0670- 5-112 TRAFFIC
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/lettings/2024/mar28/z6163-r0.pdf?sfvrsn=8d1e8eb8_1