2219 search results for bridge inspection

Richard_Nasrawy_CV

of multiple highway and bridge construction projects, ensuring compliance with FDOT standards. Coordinate, Assurance/Quality Control (QA/QC) processes for construction engineering and inspection (CEI), enhancing, of all highway and bridge construction projects on State roadways in Brevard County and parts of Orange

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/constadm/drb/resume/richard_nasrawy_cv.pdf?sfvrsn=f3376ca9_1

E4Y44-R0

No: N/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles, and not the contractor s bid total. PLEASE READ STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE, PERIODIC INSPECTION TYPE I & II EA 2.000 E544- 8- 2 CRASH CUSHION STANDARD MAINT (CLEAN, ADJ MAINTAIN) EA

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2025/oct03/e4y44-r0.pdf?sfvrsn=40400e29_1

Project Management Resource Page

December 2021 Design Project Closeout December 2021 Projects Involving Bridge Demolition Form Form Website January 2024 Bridge Project Development April 2023 Typical Section(s, Construction Engineering and Inspection (CEI) Contracts November 2022 Alternative

https://www.fdot.gov/designsupport/pm/resourcepage

Project Management Resource Page

Closeout December 2021 Projects Involving Bridge Demolition Form Form Website January 2024 Bridge Project Development April 2023 Typical Section(s) Packages FDM April 2023, and Inspection (CEI) Contracts November 2022 Alternative Contracting Methods November 2022

https://www.fdot.gov/fpo/pm/project-management-resource-page/project-management-resource-page

Section84V2-723cln

designs, and inspection and testing of production concrete. Obtain SCC from a concrete plant, 2007 Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge, and training of personnel who are involved in SCC QC inspection and testing activities. E. The proposed inspection and test methods for field trial and production batches. F. The adequacy, and sequences that are addressed in the QC Plan. Perform inspection and testing of the field

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/materials-manual/section84v2-723cln.pdf?sfvrsn=d403c97f_4

Section83V2redln

of Transportation Standard Specifications for Road and Bridge Construction Section 450 Precast, ), Subchapter G – Engineering and Traffic Operations, Part 637 – Construction Inspection and Approval, they are responsible for verification inspection and testingwithin their jurisdiction. The compiled data must, not include uncorrected major defects that are revealed during inspection after delivery to the project, of the QC, and verification, and independent assurance inspection and testing must be increased

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/materials-manual/redline/section83v2redln.pdf?sfvrsn=8b7ad2b6_1

drainagemanual2024

Manual (FDM) , Structures Design Guidelines (SDG) , Standard Plans for Road and Bridge Construction (Standard Plans) , and Standard Specifications for Road and Bridge Construction (Standard, Greater than 5 psi ............................................ 3-19 3.10.4 Existing Pipe Inspection, handicap drop curb locations or on curb returns. Do not place inlets in bridge approach slabs. When, other than the storm drain system (i.e., barrier wall, bridge abutment, cut sections) must have

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/drainage/files/drainagemanual2024.pdf?sfvrsn=8c0bb036_1

DrainageManual2023

) , Structures Design Guidelines (SDG) , Standard Plans for Road and Bridge Construction (Standard Plans) , and Standard Specifications for Road and Bridge Construction (Standard Specifications, ............................................ 3-18 3.10.4 Existing Pipe Inspection and Siltation, , within handicap drop curb locations or on curb returns. Do not place inlets in bridge approach slabs, outlet other than the storm drain system (i.e., barrier wall, bridge abutment, cut sections) must

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/drainage/files/drainagemanual2023.pdf?sfvrsn=3d89a048_7

drainagemanual2026

and Bridge Construction (Standard Plans), and Standard Specifications for Road and Bridge Construction, ............................................ 3-17 3.10.4 Existing Pipe Inspection and Siltation, or on curb returns. Do not place inlets in bridge approach slabs. When an inlet is located behind, system (i.e., barrier wall, bridge abutment, cut sections) must have flanking inlets on one or both

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/drainage/files/drainagemanual2026.pdf?sfvrsn=714821c7_1

TP-05-13-25BSN3

in accordance with Article 3-1 of the Standard Specifications for Road and Bridge Construction, Standard Specifications for Road and Bridge Construction. Insurance companies must be authorized, Specifications for Road and Bridge Construction and the Special Provisions for instructions, Length: 0.094 Miles Contract Days: 501 Total Bridge Length: 0.073 Miles Letting Date: 05/13/25, also include replacement of the Hempel Avenue bridge over SR 408 in Orange County. In addition

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/may13/tp-05-13-25bsn3.pdf?sfvrsn=8e376fad_1

E4W88

: 233 Total Bridge Length: 0.000 Miles Letting Date: 02/02/24 Total Proposal Length: 6.542 Miles, (sediment barrier, inlet barrier), monitor existing structures (inspection, settlement, vibration, SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION FY2023-24 (SECTION 7-13) FOR INSURANCE LIMITS. Call, - INSPECTION AND SETTLEMENT MONITORING (44765415201) LS 1.000 0108- 2- MONITOR EXISTING STRUCTURES, SIGN, F&I BRIDGE MOUNT INDEX 11870/700-012, UP TO 12 SF AS 1.000 0700- 1- 50 SINGLE POST SIGN

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2024/feb04/e4w88.pdf?sfvrsn=c9ab4617_1

E1X04Addendum006

- As-Built Plans Bridge Plans 170129 I-75 SB Over Sumter Blvd Existing Plans – SPN 17075-3403 – Doc #1055431 Bridge Plans 170129 I-75 SB Over Sumter Blvd Widening - FPID 409210-1-52-01 - Doc #1055449 Bridge Plans 170130 I-75 NB Over Sumter Blvd Existing Plans – SPN 17075-3403 – Doc #1055432 Bridge Plans 170130 I-75 NB Sumter Blvd - FPID 409210-1-52-01 - Doc #1055450 Bridge Plans 170140 I-75 Over, the I-75 bridge. The proposed Toledo Blade Blvd. typical section will repurpose the pavement width

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1x04/e1x04addendum006.pdf?sfvrsn=f2efe1bb_1

Revised Mussel PA with Amendment

, 5, and 6 with Reflected Changes Table 3: Bridge Construction: Component Activities, Effects, and Conservation Measures. Check “Yes” for all activities included in the project. BRIDGE, NEW,  Bridge Demolition – Above Water B, C NLAA     Bridge Demolition – Below Water A, B, C MA Bridge Substructure – In-Stream A, B, C MA Bridge Substructure – Outside Stream A, C NLAA          Bridge Superstructure – Over Stream A, B, C NLAA         Causeway (fill) A, C MA

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/revised-mussel-pa-with-amendment_a9dfac49-ac95-4269-8059-7b6522b19623.pdf?sfvrsn=5f9986a0_0

revised-mussel-pa-with-amendment

, 5, and 6 with Reflected Changes Table 3: Bridge Construction: Component Activities, Effects, and Conservation Measures. Check “Yes” for all activities included in the project. BRIDGE, NEW,  Bridge Demolition – Above Water B, C NLAA     Bridge Demolition – Below Water A, B, C MA Bridge Substructure – In-Stream A, B, C MA Bridge Substructure – Outside Stream A, C NLAA          Bridge Superstructure – Over Stream A, B, C NLAA         Causeway (fill) A, C MA

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/protected-species/revised-mussel-pa-with-amendment.pdf?sfvrsn=30e49f7e_1

D5-05-07-24BSN 30 Day

and Bridge Construction, or as amended by the project Specifications Package or any Supplemental, edition of the Department’s Standard Specifications for Road and Bridge Construction. Insurance, -assist.shtm, Standard Specifications for Road and Bridge Construction and the Special Provisions, Bridge Length: 0.000 Miles Letting Date: 05/07/24 Total Proposal Length: 0.000 Miles Contract Execution, . The gates will be unlocked and ample time will be allotted for inspection. The site visits will begin

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2024/may07/d5-05-07-24bsn-30-day.pdf?sfvrsn=2e14271f_2

E8U76

Days: 1759 Total Bridge Length: 0.282 Miles Letting Date: 06/21/24 Total Proposal Length: 15.862, , reconstruction, milling, resurfacing, bridge improvements/replacements, toll site construction, lighting, - 3- REMOVAL OF EXISTING STRUCTURES/BRIDGES (40614355201 BRIDGE ID 930447) LS 1.000 0110- 3- REMOVAL OF EXISTING STRUCTURES/BRIDGES (40614355201 BRIDGE ID 930565) LS 1.000 0110- 3- REMOVAL OF EXISTING STRUCTURES/BRIDGES (40614355201 BRIDGE ID 931004) LS 1.000 0110- 3- REMOVAL OF EXISTING

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/jun21/e8u76.pdf?sfvrsn=4c689124_1

D2-03-19-25BSN

in accordance with Article 3-1 of the Standard Specifications for Road and Bridge Construction, Specifications for Road and Bridge Construction. Insurance companies must be authorized to do, Specifications for Road and Bridge Construction and the Special Provisions for instructions, No: N/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles, (*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2025/mar19/d2-03-19-25bsn.pdf?sfvrsn=5fe3856d_1

Chapter_11

) Conducting inspection of slings and all fastenings. [29 CFR 1910.184(d)] (F) Welding operations. [29, . (E) Periodic inspections of dip tank facilities shall be conducted. (F) “NO SMOKING” signs shall, tasks: (1) Demounting of tires (including deflation) (2) Inspection of wheel components (3) Mounting

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/safety/industrialsafety/chapter_11.pdf?sfvrsn=49b454eb_1

E21G0-R0

Days: 365 Total Bridge Length: 0.000 Miles Letting Date: 03/13/24 Total Proposal Length: 0.000, of the contract letting. The Vehicular Impact Attenuator inspections and cleaning will occur every April, (REPLACE) (TYPE ET 2000) EA 5.000 E536- 6- 46 END ANCHORAGE ASSEM (REPLACE) (BRIDGE) EA 3.000 E536- 6, (REPL GUARDRAIL BEAM) EA 1.000 E536-306-501 END ANCHOR ASSEM BRIDGE (REPL SPECIAL END SHOE) EA 3.000 E536-306-509 END ANCHOR ASSEM BRIDGE (REPL ANCHOR PANEL SECT) EA 3.000 E536-308-501 END ANCHOR ASSEM

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2024/mar13/e21g0-r0.pdf?sfvrsn=d03152cc_1

Chapter_10 two

that they can be removed and re-attached for inspection of the hard hat. Any other types of stickers, approved life jacket or buoyant work vest. Inspection is required prior to and after each use, for the inspection, maintenance, and testing of portable fire extinguishers located in Department, Occupational Safety and Health Manual (A) Inspection - Monthly documented inspection of portable fire, are prohibited from use inside any office, crew room, bridge tender’s office, warehouse, or any other indoor

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/safety/industrialsafety/chapter_10-two.pdf?sfvrsn=4deffc2_1
20 of 2219 results