Draft RDO Bulletin 22-03

compliance of FDOT Projects. hƩps://www.fdot.gov/construcƟon/manuals/cpam/cpammanual.shtm Below, for all FDOT projects. The FDOT ConstrucƟon Project AdministraƟon Manual (CPAM) SecƟon 8.2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/bulletins/draft-rdo-bulletin-22-03.pdf?sfvrsn=b479be0e_1

9-Construction academy Randell 2025

and CPAM • Review and Incorporate lessons learned CPA M SECTIONS • 8.4 –Shop and Erection, drawing priorities, updates • EOR QC checkprintsrequired CPAM 8.4 SHOP AND ERECTION DRAWINGS, /procedure covered in CPAM • 17-item tracking log for each submittal CPA M 10.3 CONCRETE, , length of cracks taken into account • CPAM Section 10.3.5, Mass Concrete Control Plan (MCCP) • CPAM Section 10.7, Crack and Joint Inspection of Post-Tensioned Bridges CPAM 10.3 CONCRETE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2025-spring-construction-academy/9-construction-academy-randell-2025.pdf?sfvrsn=160d8cf5_1

04-2025 Construction Academy - Structures Randell

and CPAM • Review and Incorporate lessons learned IMPORTANT TERMS & DOCS • Construction Project Administration Manual (CPAM) • Standard Specifications for Road and Bridge Construction, reports latest shop drawing priorities, updates • EOR QC checkprintsrequired CPAM 8.4 SHOP, ) • Engineering Analysis Report (EAR) • Process/procedure covered in CPAM • 17-item tracking, Concrete: the number of cracks, average crack width, length of cracks taken into account • CPAM

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2025-spring-construction-academy/04-2025-construction-academy---structures-randell.pdf?sfvrsn=b17b413c_1

Retainage Withholding (002)

Retainage Does Florida withhold retainage? Yes, as provided by Standard Specifications 9.5 and the Construction Project Administration Manual (CPAM): 1.FDOT pays contractors in part based on work completed each month (monthly estimates). 2.FDOT withholds a portion of the payment as retainage when the project has used more than 75% of the contract time and when the work performed exceeds, . Per CPAM 5.11, , use these steps to calculate retainage: 1.Start with the estimate

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/trnsport/tips-tricks/retainage-withholding-(002).docx?sfvrsn=40840f4_1

2024 Fall Construction Academy

32399 Presentations Week 1 Utilities FS 337-401-404 CPAM 5.6 UAM Contractor Past Performance Review Material Method of Acceptance Earthwork Pipe CPAM Overview Disputes Review Board Week 2 Asphalt

https://www.fdot.gov/construction/training/construction-academy/2024-fall-construction-academy

Bulletins

CPAM Changes - Chapter 7 Sections 3 & 4 (Expired) (*.pdf, 1.88mb) 2006 01-06 CPAM

https://www.fdot.gov/construction/memos/bulletins/bulletins.shtm

Chapter7s3Redline

the life of the contract. Do not overrun the 1 LS pay item. See CPAM 7.3.4.2 for more information, concurrence for project limit and construction limit extensions must be obtained in accord with CPAM, in accordance with CPAM Section 7.3.10.2. When a Supplemental Agreement or Unilateral Payment documents plan, with Specification 5-12.3. Refer to CPAM Section 7.5. (6) Idle asphalt plants should only be compensable, for Unilateral Payments if the conditions for that use set forth in the CPAM Section on Contingency

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newhistory/chapter7s3redline.pdf?sfvrsn=4ff659d3_7

Chapter7s3

throughout the life of the contract. Do not overrun the 1 LS pay item. See CPAM 7.3.4.2 for more, for project limit and construction limit extensions must be obtained in accord with CPAM Section, with CPAM Section 7.3.10.2. When a Supplemental Agreement or Unilateral Payment documents plan changes, to CPAM Section 7.5. (6) Idle asphalt plants should only be compensable for delays if the plant, if the conditions for that use set forth in the CPAM Section on Contingency Supplemental Agreements are met

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/chapter7s3.pdf?sfvrsn=2e05d443_17

Chapter5s14Redline

Shape Bed) Form 700-050-54 CPAM 5.16.10.2 (A)(C)Form 700-050-56(A), Daily Log Sheet - Miscellaneous, Form 700-050-56Miscellaneous Tabulation NOTE CPAM 5.14.9 Specification530-4.1 Attachment 5.14-4, and Contractor's Monthly Certifications of Quantities CPAM Section 6.2 CPAM Section 6.2, CPAM Section 6.2 5.15.6(B) Contractor’s Certification 5.14.7Fuel Adjustments Specifications, Documentation NOTE 2 CPAM 11.4. NOTE 3 CPAM Section 6.2 (1)(B)Examples Example 1 Fuel Adjustment

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newhistory/chapter5s14redline.pdf?sfvrsn=3734a131_6

Estimates Bulletin 15-08

in Topic No. 700-000-000 Construction Projects Administration Manual (CPAM) Sections 7.4.6.1 & 7.4.7, . REQUIREMENTS As stated in CPAM, a proposal with multiple projects, including phase 56 (Utility Work, and the proposal is subject to the maximum funding limits in Section 7.4.61 in CPAM. This applies

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/bulletins/fpc/2015/estimates-bulletin-15-08.pdf?sfvrsn=29cb8ad1_1

Final Estimates Forms

and CPAM 5.13.7) 700-050-20 Final Plans & Estimates Transmittal 700-050-21 Form 21- A Surety Release1, is not required, but is an optional resource that corresponds to CPAM 11.4. Users can enter information from Form, Correction and CPF Correction referenced in CPAM 11.4. *This is a tool and does not replace the QCRR

https://www.fdot.gov/construction/finalestimates/fedocs.shtm

Training

- Notifications and Delegates  Utility Training Documents    1. CPAM 5.6 Utility Work  2. FS

https://www.fdot.gov/programmanagement/utilities/training.shtm

6340203.orig

 ORIGINATION FORM Proposed Revisions to the Specifications (Please provide all information - incomplete forms will be returned) Date: Specification Section: Originator: Articles/Subarticles: Telephone: email: Will the proposed revision involve Design Standard Index changes? Yes No Roadway Design staff contact ed ( name ) : Will the proposed revision involve PPM changes? Yes No Roadway Design staff contact ed ( name ) : Will the proposed revision involve CPAM changes? Yes

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/comments-responses/6340203.orig.pdf?sfvrsn=e0d1b28e_0

0081002-724FHWA

with the Construction Project Administration Manual (CPAM) provided all contract work is complete. 0081002, in accordance with the Construction Project Administration Manual (CPAM) provided all contract work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/fhwa/0081002-724fhwa.pdf?sfvrsn=35bedea1_1

13-2024 Construction Academy MOT Session

Construction Project Administration Manual (CPAM) In this section, we will look at the various CPAM chapters, of TRANSPORTATION Florida Department of Transportation CPAM 9.1 - MAINTENANCE OF TRAFFIC AND SAFETY, of Transportation CPAM 9.1 - MAINTENANCE OF TRAFFIC AND SAFETY Selection of Traffic Control Plan (TCP, for approval • Alternative TCPs are covered in Spec 102-4 Florida Department of Transportation CPAM 9.1, of Transportation CPAM 9.1 - MAINTENANCE OF TRAFFIC AND SAFETY Discussion of Traffic Control Plan at Pre-Con

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2024-spring-construction-academy/13-2024-construction-academy-mot-session.pdf?sfvrsn=bb04613d_1

FDOT_BABAImplementatioPlanFAQ

by Florida Statutes and Rule 14-15.002. FDOT Construction Project Administration Manual (CPAM): https://www.fdot.gov/construction/manuals/cpam/cpammanual.shtm Instructions to the Construction, the CPAM for additional information. See the specification for additional details and documentation, , not short term or specific project preferences. See the CPAM for Instructions applicable to Iron, for incidental items. Consult the CPAM for details. The current Manufactured Products waiver is fairly

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/productevaluation/ipl/fdot_babaimplementatioplanfaq.pdf?sfvrsn=e627387a_1

Chapter7s4Redline

or UNILATERAL PAYMENTS except as shown in CPAM Section 7.4.6.2. Function (work activity) codes established, an exception to these funding limits for a specific Contingency Supplemental Agreement as stated in CPAM, payment to the Contractor via a Unilateral Payment in accordance with CPAM Chapter 7.3, the District may, in accordance with CPAM Section 7.4.5, a funds approval for the additional funds must be received, contract subject to the limitations in CPAM Section 7.4.6.1. Per the Work Program Instructions

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newhistory/chapter7s4redline.pdf?sfvrsn=edc444e6_3

Chapter7s4

for SUPPLEMENTAL AGREEMENTS or UNILATERAL PAYMENTS except as shown in CPAM Section 7.4.6.2., as stated in CPAM Section 7.4.8.2. In the event the contract is locally funded or is associated, timely payment to the Contractor via a Unilateral Payment in accordance with CPAM Chapter 7.3, determined that additional work is necessary in accordance with CPAM Section 7.4.5, a funds, on the Department’s estimate for the construction contract subject to the limitations in CPAM Section

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/chapter7s4.pdf?sfvrsn=1498bdfa_6