3761 search results for REPORT NUMBER

01J

Reports Select a report... Inspection Report 02-06-2024 Inspection Report 02-16-2023 Inspection Report 02-08-2022 Inspection Report 02-11-2021 Inspection Report 02-18-2020 Inspection Report 02-07-2019 Inspection Report 02-06-2018 Inspection Report 02-23-2017 Inspection Record 02-18-2016, Record 10-01-1971 Inspection Record 11-25-1970 Inspection Report 11-20-1969 Historical, Program Summary Report. The summary reports are intended

https://www.fdot.gov/aviation/airportslist/01J

FA1

AirportInspection Reports Select a report... Inspection Report 09-10-2024 Inspection Report 09-20-2023 Inspection Report 09-13-2022 Inspection Report 09-15-2021 Inspection Report 08-04-2020 Inspection Report 09-11-2019 Inspection Report 09-18-2018 Inspection Report 10-18-2017 Inspection Report 10-04-2016 Inspection Record 09-23-2015 Inspection Record 09-23-2014 Inspection Record, Airfield Pavement Management Program Summary Report. The summary reports

https://www.fdot.gov/aviation/airportslist/FA1

1020302.FHWA

, to the July 2014 Workbook. The pay item number for Temporary Raised Rumble Strip Set was updated, Program Report 350 (NCHRP 350) or the Manual for Assessing Safety Hardware 2009 (MASH) and current FHWA, for inclusion on the QPL shall include the FHWA WZ numbered acceptance letter with attachments and vendor, application, field assembly and installation. The QPL or APL number is to be permanently marked, on the National Highway System (NHS) under the provisions of the NCHRP Report 350 “Recommended Procedures

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/fhwa/1020302.fhwa.pdf?sfvrsn=74eae890_0

Transportation System Jurisdiction and Numbering

Transportation System Jurisdiction and Numbering,  Approved: Effective: January 27, 2023 Office: Transportation Data & Analytics Topic Number, Classification  Interstate Road Numbers  National Highway System (NHS)  National Highway Freight,  State Highway System (SHS)  State Road Numbers and Road Naming  Strategic Highway Network (Strahnet,  United States (U.S.) Route Numbers (includes U.S. Bicycle Routes)  Urban Area Boundaries, collection system report to the FHWA using general interest roadway data to describe the extent

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cimdocs/docs---pubs/525-020-010.pdf?sfvrsn=1f9359c1_3

Section34V2-722cln

. If the SC testing and the field evaluation (if applicable) proves satisfactory, an APL number, ) Updated list of materials being supplied at each supply location with their APL number. (C) Current, laboratory for situations where the primary lab is not operational. (C) The tank identification numbers, that the transport vehicle inspection report, signed by the responsible inspector, shall, for at least 30 days from the date of sampling. Ensure that the tank number, Supplier’s LOT number

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/materials-manual/section34v2-722cln.pdf?sfvrsn=69b5fd85_4

Section34V2-725

. If the SC testing and the field evaluation (if applicable) proves satisfactory, an APL number, being supplied at each supply location with their APL number. (C) Current list of tests, the primary lab is not operational. (C) The tank identification numbers with the corresponding, vehicle inspection report, signed by the responsible inspector, shall be maintained in the Supplier’s, 30 days from the date of sampling. Ensure that the tank number, Supplier’s LOT number, material

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/materials-manual/section34v2-725.pdf?sfvrsn=7cbffe80_1

MM 3.4 V2 clean

. If the SC testing and the field evaluation (if applicable) proves satisfactory, an APL number, being supplied at each supply location with their APL number. (C) Current list of tests, the primary lab is not operational. (C) The tank identification numbers with the corresponding, vehicle inspection report, signed by the responsible inspector, shall be maintained in the Supplier’s, 30 days from the date of sampling. Ensure that the tank number, Supplier’s LOT number, material

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/materials-manual/mm-3-4-v2-clean.pdf?sfvrsn=e2dc3fe0_2

Section34V2-723cln

. If the SC testing and the field evaluation (if applicable) proves satisfactory, an APL number, being supplied at each supply location with their APL number. (C) Current list of tests, the primary lab is not operational. (C) The tank identification numbers with the corresponding, vehicle inspection report, signed by the responsible inspector, shall be maintained in the Supplier’s, 30 days from the date of sampling. Ensure that the tank number, Supplier’s LOT number, material

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/materials-manual/section34v2-723cln.pdf?sfvrsn=e4ca6718_2

Section3.4-051018_1-19WB

satisfactory, an APL number will be assigned to the material by the PEO. 3.4.6.4.1 Field Evaluation, number. Topic No.: 675-000-000 Materials Manual Effective: October 30, 2014 Bituminous Materials, ) The tank identification numbers with the corresponding volumes (in gallons). (D) The sampling, . The outline shall include a statement that the transport vehicle inspection report, signed, location for at least 30 days from the date of sampling. Ensure that the tank number, Supplier’s LOT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/materials-manual/section3-4-051018_1-19wb.pdf?sfvrsn=c10ac767_1

Section34-051815 1-16

, an APL number will be assigned to the material by the PEO. 3.4.6.4.1 Field, supplied at each supply location with their APL number. (C)Current list of tests and qualifications, . (C)The tank identification numbers with the corresponding volumes (in gallons). (D)The sampling, . The outline shall include a statement that the transport vehicle inspection report, signed, . Ensure that the tank number, Supplier’s LOT number, material grade, and sample date is clearly

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/materials-manual/section34-051815-1-16.docx?sfvrsn=97829e56_1

Section3.4-051018_1-19WB

satisfactory, an APL number will be assigned to the material by the PEO. 3.4.6.4.1 Field Evaluation, number. Topic No.: 675-000-000 Materials Manual Effective: October 30, 2014 Bituminous Materials, ) The tank identification numbers with the corresponding volumes (in gallons). (D) The sampling, . The outline shall include a statement that the transport vehicle inspection report, signed, location for at least 30 days from the date of sampling. Ensure that the tank number, Supplier’s LOT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/materials-manual/section3-4-051018_1-19wb.pdf?sfvrsn=e057882a_1

2024FDM941Signal

) Report of Core Borings Signalization Plans may require insertion of sheets that were prepared, are determined are contained in the Estimated Quantities (EQ) Report and should not be repeated in the plans, details • Electrical circuits • Signal phasing • Pay item number and quantity for each element, ) the following: (a) Vvh number (b) Utility type and owner (c) Size and Material (d) Location (Sta, , including applicable pay item numbers. Topic #625-000-002 FDOT Design Manual 941 - Signalization

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm941signal.pdf?sfvrsn=c905ead9_1

2024FDM941Signal

Assemblies Data Table (11) Report of Core Borings Signalization Plans may require insertion of sheets, quantities are determined are contained in the Estimated Quantities (EQ) Report and should, item number and quantity for each element of the signal design. Produce the Signalization Plan sheet, on the plan view. Include with label (or in summary table) the following: (a) Vvh number (b) Utility, and top of utility elevations (15) Label signalization equipment, including applicable pay item numbers

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdm941signal.pdf?sfvrsn=d40eed04_1

2025FDM941Signal

Details (10) Mast Arm Assemblies Data Table (11) Report of Core Borings Signalization Plans may, ) Report and should not be repeated in the plans as a pay item note. Pay item notes are used to provide, • Pay item number and quantity for each element of the signal design. Produce the Signalization Plan, the following with the label (or in a summary table): (a) Vvh number (b) Utility type and owner (c) Size, (15) Label signalization equipment, including applicable pay item numbers. Topic #625-000-002 FDOT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm941signal.pdf?sfvrsn=7d4aa86a_1

2026FDM941Signal

) Report of Core Borings Signalization Plans may require insertion of sheets that were prepared, Quantities (EQ) Report and should not be repeated in the plans as a pay item note. Pay item notes, circuits • Signal phasing • Pay item number and quantity for each element of the signal design, (or in a summary table): (a) Vvh number (b) Utility type and owner (c) Size and material (d, equipment, including applicable pay item numbers. Topic #625-000-002 FDOT Design Manual 941

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm941signal.pdf?sfvrsn=cd6a9173_1

ORD1012-AutomatedQuantities

for the Estimated Quantities Report. The participants will learn the use of FDOT and OpenRoads Designer tools, 4 ESTIMATED QUANTITIES REPORT, Report Builder ............................................................................................................................49 Estimated Quantities Report Signature Page, the Estimated Quantities Report Signature Page ..................................52 Exercise 4.2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cadd/downloads/documentation/fdotconnecttraining/ord-c/ord1012-automatedquantities.pdf?sfvrsn=3c9ce8f1_2

Exhibit 910-2

 REPORT OF CORE BORINGS GR-2* SOIL SURVEY GR-1* MISCELLANEOUS STRUCTURES 52 SELECTIVE CLEARING AND GRUBBING 48 - 51 UTILITY ADJUSTMENTS 42 - 47 TEMPORARY TRAFFIC CONTROL PLAN 34 - 41 VERIFIED, PROJECT ID 123456-1-52-01 DESCRIPTION DATE KEY SHEET REVISIONS 04-20-22 Added Sheet Number 2A to the Index and Revised Sheet Numbers 5 & 19. 1 1 1 1 DEVELOPMENTAL STANDARD PLANS (DSPs, NUMBER 99991 ROADWAY ENGINEERS, INC. VENDOR NO.: 99-999999 (850) 671-1313

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/exhibit-910-2.pdf?sfvrsn=ead06ed7_1

Redlines Exhibit 910-2

 REPORT OF CORE BORINGS GR-2* SOIL SURVEY GR-1* MISCELLANEOUS STRUCTURES 52 SELECTIVE CLEARING AND GRUBBING 48 - 51 UTILITY ADJUSTMENTS 42 - 47 TEMPORARY TRAFFIC CONTROL PLAN 34 - 41 VERIFIED, PROJECT ID 123456-1-52-01 DESCRIPTION DATE KEY SHEET REVISIONS 04-20-22 Added Sheet Number 2A to the Index and Revised Sheet Numbers 5 & 19. 1 1 1 1 DEVELOPMENTAL STANDARD PLANS (DSPs, LICENSE NUMBER 99991 ROADWAY ENGINEERS, INC. VENDOR NO.: 99-999999 (850) 671-1313

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/redlines-exhibit-910-2.pdf?sfvrsn=95082777_1

Exhibit 910-2

 REPORT OF CORE BORINGS GR-2* SOIL SURVEY GR-1* MISCELLANEOUS STRUCTURES 52 SELECTIVE CLEARING AND GRUBBING 48 - 51 UTILITY ADJUSTMENTS 42 - 47 TEMPORARY TRAFFIC CONTROL PLAN 34 - 41 VERIFIED, PROJECT ID 123456-1-52-01 DESCRIPTION DATE KEY SHEET REVISIONS 04-20-22 Added Sheet Number 2A to the Index and Revised Sheet Numbers 5 & 19. 1 1 1 1 DEVELOPMENTAL STANDARD PLANS (DSPs, NUMBER 99991 ROADWAY ENGINEERS, INC. VENDOR NO.: 99-999999 (850) 671-1313

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/exhibit-910-2.pdf?sfvrsn=55ea727f_1

SMO-26-04

 Request for Research Funding for FY 2025-2026 Project Number (Research Center Use Only): SMO-26-04 Requesting Office State Materials Office Priority 4 of 7 Proposed Title Development of Tubular, protocol for higher speed conditions with higher number of impacts. One of the challenges, Report No. 0-6772- 1, Published February 2015. Keywords Used In Existing Work Search (Cannot leave blank) Tubular Marker Related Contracts (Give contract numbers) NA Funding Request $150,000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/program_information/contract.development/ballot/smo-26-04.pdf?sfvrsn=8e617d9_1
20 of 3761 results