pavement is shown in the Plans, the work of constructing, maintaining, and subsequently removing, devices, barriers, signing, and pavement markings for special detours, and restoration to final, Retroreflective Pavement Markers - each. Item No. 102- 81- CrashCushion(Gating)(Temporary) - per location, Pavement Markings

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/internal/1020302.origind.pdf?sfvrsn=413d1bef_0

3470000.FHWA

square inches is to be removed and replaced in accordance with 347-5.2. Sidewalk, ditch pavement, slope pavement, Traffic Separator, or curb and gutter having any intersecting cracks visible, and replaced in accordance with 347-5.2. Sidewalk, ditch pavement, slope pavement, Traffic Separator

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/fhwa/3470000.fhwa.pdf?sfvrsn=eabfcd6b_0

1600000.impl

to the stabilization operation. 160-2.2.1 Reclaimed Asphalt Pavement (RAP) (Same Project): The Engineer may, the source. 160-2.2.2 Reclaimed Asphalt Pavement (RAP) (Different Project) or RAP Blended Material: When, approximately parallel to the plane of the proposed finished surface. Constructmainline pavement lanes, the required density until the subsequent base or pavement is in place including any repairs, replacement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/implemented/1600000.impl.pdf?sfvrsn=49b4e10e_0

1200702.impl

 120 EXCAVATION A N D E M B A N KMENT. (REV7-20-15)(FA8-10-15)(1-16) SUBARTICLE120-7.2isdeletedandthefollowingsubstituted: 120-7.2General Requirements for Embankment Materials: Construct embankments of acceptable material including reclaimed asphalt pavement (RAP), recycled concrete aggregate (RCA) and portland cement concrete rubble, but containing no muck, stumps, roots, brush, vegetable matter, rubbish, reinforcement bar or other material that does not compact into a suitable

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/implemented/1200702.impl.pdf?sfvrsn=c50e42a0_0

1020302.impl

: 102-11.3 Special Detours: When a diversion or lane shift that requires temporary pavement, , barriers, signing, pavement markings, and restoration to final configuration will be paid for under, No. 102- 76- ArrowBoard-pereachperday. Item No. 102- 78- Temporary Retroreflective Pavement Markers, foot. Item No. 710- PaintedPavement Markings. Item No. 711- Thermoplastic Pavement Markings

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/implemented/1020302.impl.pdf?sfvrsn=4df67286_0

9850000.origind

Ditch Pavement (Rubble Riprap) 281 Joint Cover for Mechanically Stabilized Retaining Wall Supporting, Fabric Jacket (Culvert) 280 Concrete Pavement Subdrainage 287 D-4/6 Slope Pavement Ditch Pavement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/internal/9850000.origind.pdf?sfvrsn=c783c33d_0

9260000.FHWA

mortars and concrete for patching portland cement concrete pavement. Q* An epoxy for use in post, for structural bonding where bituminous pavement overlays will come in contact with the hardened, adhesives for making epoxy mortar or concrete for patching portland cement concrete pavement shall, be by a field demonstration made by the Contractor using the criteria of bond to the pavement, matching

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/fhwa/9260000.fhwa.pdf?sfvrsn=93748c0c_0

9260000.origind

and concrete for patching portland cement concrete pavement. Q* An epoxy for use in post, for structural bonding where bituminous pavement overlays will come in contact with the hardened, pavement shall be any of approved products listed at the time of the work. Mix designs for mortar, shall be by a field demonstration made by the Contractor using the criteria of bond to the pavement