7243 search results for Pavement

FY 2024-2025 Workbook

. MILLING OF EXISTING ASPHALT PAVEMENT - STOCKPILING.(REV 8-17-22) (FA 2-14-00) (FY 2024-25, PAVEMENT - EQUIPMENT.(REV 12-1-93) (FY 2024-25) SP3270200 Use when requested by the district Construction Engineer. MILLING OF EXISTING ASPHALT PAVEMENT - STRUCTURAL PAVE BACK.(REV 8-17-22) (FA 12-30-19, Use on all interstate and limited access asphalt pavement roadway projects. IRI-based Incentive, ) SP3340203 Use on projects with available coring data. CEMENT CONCRETE PAVEMENT (COLORED CONCRETE).(REV

https://www.fdot.gov/programmanagement/implemented/workbooks/fy-2024-2025-workbook

Jan 2022 Workbook

OF EXISTING ASPHALT PAVEMENT.(REV 8-31-99) (FA 2-14-00) (1-22)Insert Information Required.Changes, PAVEMENT - EQUIPMENT.(REV 12-1-93) (1-22)Changes to: 327-2. SP3270200 Use when requested by the District. MILLING OF EXISTING ASPHALT PAVEMENT(REV 12-16-19) (FA 12-30-19) (1-22)Changes to: 327-3, , 330-9.5. SP3300802 Use on all interstate and limited access asphalt pavement roadway projects, on projects with available coring data. CEMENT CONCRETE PAVEMENT (COLORED CONCRETE).(REV 5-11-16) (FA

https://www.fdot.gov/programmanagement/implemented/workbooks/jan-2022-workbook

January 2020 Workbook

contaminated areas are delineated in the Plans. MILLING OF EXISTING ASPHALT PAVEMENT.(REV 8-31-99) (FA, , square yards", etc. MILLING OF EXISTING ASPHALT PAVEMENT - EQUIPMENT.(REV 12-1-93) (1-20)Changes, interstate and limited access asphalt pavement roadway projects. CEMENT CONCRETE PAVEMENT (COLORED, Concrete Pavement INTEGRAL PILE AND COLUMN JACKETS.(REV 1-7-16) (FA 1-14-16) (1-20)Changes to: 457

https://www.fdot.gov/programmanagement/implemented/workbooks/janworkbook2020/january-2020-workbook

July 2019 Workbook

ASPHALT PAVEMENT.(REV 8-31-99) (FA 2-14-00) (7-19)Insert Information Required.Changes to: 327-1, to be retained. Use "all, tons, square yards", etc. MILLING OF EXISTING ASPHALT PAVEMENT - EQUIPMENT, , 330-9.5. SP3300802 Smooth pavement, for interstate and limited access roadway projects only. Use with the approval of the District Construction Engineer. CEMENT CONCRETE PAVEMENT (COLORED CONCRETE, Concrete Pavement INTEGRAL PILE AND COLUMN JACKETS.(REV 1-7-16) (FA 1-14-16) (7-19)Changes to: 457

https://www.fdot.gov/programmanagement/implemented/workbooks/julworkbook2019/july-2019-workbook

January 2019 Workbook

PAVEMENT.(REV 8-31-99) (FA 2-14-00) (1-19)Insert Information Required.Changes to: 327-1, 327-6, to be retained. Use "all, tons, square yards", etc. MILLING OF EXISTING ASPHALT PAVEMENT - EQUIPMENT.(REV, , 330-9.5. SP3300802 Smooth pavement, for interstate and limited access roadway projects only. Use with the approval of the District Construction Engineer. CEMENT CONCRETE PAVEMENT (COLORED CONCRETE).(REV, Pavement INTEGRAL PILE AND COLUMN JACKETS.(REV 1-7-16) (FA 1-14-16) (1-19)Changes to: 457. SP4570000

https://www.fdot.gov/programmanagement/implemented/workbooks/janworkbook2019/default.shtm

July 2018 Workbook

OF EXISTING ASPHALT PAVEMENT(REV 8-31-99) (FA 2-14-00) (7-18)Insert Information Required.Changes, quantity to be retained. Use "all, tons, square yards", etc. MILLING OF EXISTING ASPHALT PAVEMENT, , 330-9.4, 330-9.5. SP3300802 Smooth pavement, for interstate and limited access roadway projects only. Use with the approval of the District Construction Engineer. CEMENT CONCRETE PAVEMENT (COLORED, with Colored Concrete Pavement INTEGRAL PILE AND COLUMN JACKETS.(REV 1-7-16) (FA 1-14-16) (7-18)Changes

https://www.fdot.gov/programmanagement/implemented/workbooks/julworkbook2018/default.shtm

January 2018 Workbook

are delineated in the Plans. MILLING OF EXISTING ASPHALT PAVEMENT.(REV 8-31-99) (FA 2-14-00, ", etc. MILLING OF EXISTING ASPHALT PAVEMENT - EQUIPMENT.(REV 12-1-93) (1-18)Changes to: 327-2. SP3270200 Use when requested by the District. CEMENT CONCRETE PAVEMENT (COLORED CONCRETE).(REV 5-11-16) (FA 5-12-16) (1-18)Changes to: 350-1, 350-2, 350-10. SP3500200 Jobs with Colored Concrete Pavement, , 455-7.8. SS4550707 All Jobs Mandatory #2 (2-18 Implementation) 710 PAINTED PAVEMENT MARKINGS.(REV

https://www.fdot.gov/programmanagement/implemented/workbooks/janworkbook2018/default.shtm

29578.02_SSI Intersections_Crash Facts Infosheet Sig & Unsig

information can be found in the FDOT Design Manual chapter 231 Lighting. Improving pavement friction, Intervals REAR END ANGLE LEFT TURN Focus Crash Ty p e s Pavement Friction Management REAR END Focus, . Improving pavement friction through countermeasures such as High Friction Surface Treatment (HFST) can, . There are a variety of low cost countermeasures such as signing and pavement markings to warn, TURN ANGLE Focus Crash Ty p e s Pavement Friction Management REAR END Focus Crash Ty p e s L i

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/safety/11a-safetyengineering/crash-data/29578-02_ssi-intersections_crash-facts-infosheet-sig-unsig.pdf?sfvrsn=bf0653b5_1

F4006ScopeServices

, panel), pavement markings (detectable warnings, painted, thermoplastic), loop assembly, drainage (inlet, , excluding the cost of construction materials. 338 VALUE ADDED ASPHALT PAVEMENT 338-1 Description. Construct value added asphalt pavement consisting of asphalt concrete structural course, , as designated herein, is responsible for performance of the value added asphalt pavement including continued responsibility for performing all remedial work associated with pavement distresses exceeding

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/fcp/f4006/f4006scopeservices.pdf?sfvrsn=eab670c3_2

July 2021 Workbook

when contaminated areas are delineated in the Plans. MILLING OF EXISTING ASPHALT PAVEMENT.(REV, , tons, square yards", etc. MILLING OF EXISTING ASPHALT PAVEMENT - EQUIPMENT.(REV 12-1-93) (7-21)Changes to: 327-2. SP3270200 Use when requested by the District. MILLING OF EXISTING ASPHALT PAVEMENT, and limited access asphalt pavement roadway projects. CEMENT CONCRETE PAVEMENT (COLORED CONCRETE

https://www.fdot.gov/programmanagement/implemented/workbooks/julworkbook2021/july-2021-workbook

D3-09-24-25BSN

), adding curb and gutter, barrier walls, sidewalk, drainage improvements, ITS, signing & pavement, , PG76-22 TN 201.000 0350- 3- 5 PLAIN CEMENT CONCRETE PAVEMENT, 8" SY 111.000 0350- 3- 7 PLAIN CEMENT CONCRETE PAVEMENT, 9" SY 7,017.000 0350- 5- CLEANING & SEALING JOINTS- CONCRETE PAVEMENT LF 10,723.000 0352- 70- GRINDING CONCRETE PAVEMENT SY 7,128.000 0400- 0- 11 CONCRETE CLASS NS, GRAVITY WALL

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2025/sep24/d3-09-24-25bsn.pdf?sfvrsn=f4280fa4_1

2026FDM232Signalization

analysis may be required to weigh the impacts of increased pavement width and signal operations, of advance and/or overhead lane use signs should be used as a supplement to pavement arrows on stems, technology types commonly used with signal design include inductive loops installed in pavement, detection is generally used with asphalt pavement, and video detection with concrete pavement or bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm232signalization.pdf?sfvrsn=ebf88f59_2

E4X94 BidTabs

), pavement markings (detectable, painted, RPM, thermoplastic), signing (single-column, panel, enhanced, SPECIAL DETOUR- TEMPORARY PAVEMENT 44841515201 (192.000) SY (LS) 13,000.00000 13,000.00, ASPHALT PAVEMENT, 1 1/2" AVG DEPTH 31,729.000 SY 3.05000 96,773.45 3.55000 112,637.95 3.45000, 450,877.00 1,000,000.00000 1,000,000.00 0015 0102 2200 SPECIAL DETOUR- TEMPORARY PAVEMENT, 6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH 31,729.000 SY 5.80000 184,028.20 12.00000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/bidtabs/2025/sep05/e4x94-bidtabs.pdf?sfvrsn=7acdc943_1

PublicHearing_OSCEOLA COUNTY_Summary

RIVER COUNTY LINE Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2026 2027 2028, BRONSON HWY/13 ST/VINE ST FROM MAIN ST TO AERONAUTICAL DR Type of Work: PAVEMENT ONLY RESURFACE, TO THE REEDY CREEK BRIDGE Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2026 2027 2028, 452696-1 - SR 600 / JOHN YOUNG PARKWAY FROM POLK COUNTY LINE TO SUNDOWN DR Type of Work: PAVEMENT, 192 FROM NOVA AVE TO HIBISCUS RD Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_osceola-county_summaryf3f24785-2000-4f35-9b7e-0bc0427e32b7.pdf?sfvrsn=a6d625a3_2

2026FDM232Signalization

analysis may be required to weigh the impacts of increased pavement width and signal operations, of advance and/or overhead lane use signs should be used as a supplement to pavement arrows on stems, technology types commonly used with signal design include inductive loops installed in pavement, detection is generally used with asphalt pavement, and video detection with concrete pavement or bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm232signalization.pdf?sfvrsn=b6e7138d_1

PublicHearing_OSCEOLA COUNTY_Summary_2027_2031

: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2027 2028 2029 2030 2031 Construction State, WEST OF SR 429 TO THE REEDY CREEK BRIDGE Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding, OSCEOLA COUNTY Highways 454212-1 - SR 500/US 192 FROM NOVA AVE TO HIBISCUS RD Type of Work: PAVEMENT, 454213-1 - SR 60 FROM E OF KISSIMMEE RIVER BRIDGE TO BLANKEY BAY SLOUGH Type of Work: PAVEMENT ONLY, 456132-1 - SR 60 FROM W PEAVINE RD TO W OF FL TURNPIKE Type of Work: PAVEMENT ONLY RESURFACE (FLEX

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_osceola-county_summary_2027_2031.pdf?sfvrsn=1f7dfc4e_1

PublicHearing_LAKE COUNTY_Summary_2027_2031

561A/SOUTHERN BREEZE DR Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2027 2028, Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2027 2028 2029 2030 2031, 500 TO S OF SR 44 (ORANGE AVE) Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source, : PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2027 2028 2029 2030 2031 Construction State, for Project 454198-1 $1,345,000 $11,842,799 454200-1 - SR 19 FROM CR 42 TO CR 455 Type of Work: PAVEMENT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_lake-county_summary_2027_2031.pdf?sfvrsn=3c0e8028_1

FMTP2024_VisualPlan

% of the top 150 non-recurring bottlenecks 2021 Highway Pavement Conditions NHS Interstate: 73.4% of pavement is in Good condition; 26.4% is in Fair condition; 0.3% is in Poor condition; NHS Non-Interstate: 48.8% of pavement is in Good condition; 50.6% is in Fair condition; 0.6% is in Poor, assets like roadway pavements through analysis and implementation, and invests in hazard

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/rail/plans/fmtp/fmtp24/fmtp2024_visualplan.pdf?sfvrsn=c778dd80_2

E6P36ScopeOfServices

of this Contract including, but not limited to, Mechanical Asphalt Repair, Concrete Pavement Repair, Repair, for performing the required routine maintenance to maintain the pavement and the drainage system, in the table below: Maintenance Type Threshold Site Definition Pavement Mechanical Asphalt Repair 75, Concrete Pavement Repair 24 CY/Site A site is defined as: ~ 12 ~ For divided roadways - a mile

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/asset-main/e6p36/e6p36scopeofservices.pdf?sfvrsn=9d089462_1

DesignBuildSpecificationsjan05

. Theportionoftheroadbedimmediately below the base course or pavement, including below the curb and gutter, valley gutter, shoulder and driveway pavement. The subgrade limits ordinarily include those portions, inches [300 mm] below the bottom of the base or pavement and outward to 6 inches [150 mm] beyond the base, pavement, or curb and gutter. Substructure

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2005/january-2005/design-build/designbuildspecificationsjan05.pdf?sfvrsn=9d0e17de_0
20 of 7243 results