7243 search results for Pavement

2026FDM901SeqOfPlans

in the Contract Plans Set in the following order: (1) Roadway (2) Signing and Pavement Marking (3, identification of design constraints or problems. (6) Document off-site and pavement drainage constraints, Mitigation Plan P P C F Miscellaneous Structures P C F Component Plans Sets Signing and Pavement Marking, , 2026 901 - Sequence of Plans Preparation 11 SIGNING AND PAVEMENT MARKING PLANS - PLAN SHEETS, equations • Conflicting utilities, lighting, and drainage • Pavement markings • Sign locations

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/review/2026fdm901seqofplans.pdf?sfvrsn=655c2cd1_9

2026FDM901SeqOfPlans

in the Contract Plans Set in the following order: (1) Roadway (2) Signing and Pavement Marking (3, identification of design constraints or problems. (6) Document off-site and pavement drainage constraints, Mitigation Plan P P C F Miscellaneous Structures P C F Component Plans Sets Signing and Pavement Marking, 901 - Sequence of Plans Preparation 11 SIGNING AND PAVEMENT MARKING PLANS - PLAN SHEETS • North, equations • Conflicting utilities, lighting, and drainage • Pavement markings • Sign locations

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm901seqofplans.pdf?sfvrsn=1c8f77e6_3

PublicHearing_BREVARD COUNTY_Summary_2027_2031

(US1)DIXIE HW Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2027 2028 2029 2030, of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2027 2028 2029 2030 2031 Construction, : PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2027 2028 2029 2030 2031 Construction State, of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2027 2028 2029 2030 2031 Construction, OF ROCKY POINT RD TO SOUTH OF SR 514/MALABAR RD Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_brevard-county_summary_2027_2031.pdf?sfvrsn=6719d004_1

Draft Tentative Work Program FY2025-FY2029

: FLEXIBLE PAVEMENT RECONSTRUCT. Phase Fund Code 2025 2026 2027 2028 2029 Preliminary Engineering DS, 448131-1 $678,588 448929-1 - SR 29 FROM N OF WAGON WHEEL RD TO S OF I-75 Type of Work: PAVEMENT, DR TO S OF SOUTHWEST BLVD Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Fund Code 2025 2026, : PAVEMENT ONLY RESURFACE (FLEX) Phase Fund Code 2025 2026 2027 2028 2029 Construction DDR $2,950,679, OF BRIDGE #030299 Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Fund Code 2025 2026 2027 2028

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d1_documents/draft-tentative-work-program-fy2025-fy2029.pdf?sfvrsn=524ea7f9_1

676-010FHWAReviewPkg

pavement areas, or where R/W is restricted. " to 1" for drainage. Not required in sidewalk, 4 1, 2. The number, size and orientation of conduit sweep will pavement areas, or where R/W, . If cabinet mounting requires relocation of hole in pavement areas, or where R/W is restricted. " to 1, , size and orientation of conduit sweep pavement areas, or where R/W is restricted. " to 1, and orientation of conduit sweep will pavement areas, or where R/W is restricted. " to 1" for drainage

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2025/676-010fhwareviewpkg.pdf?sfvrsn=eea027f5_1

2024June-Fri10-SafetyAnalysisUsingSignal4Analytics

by Lighting Condition and Severity Crashes by Pavement Condition and Severity Collision Diagram, Crashes by Pavement Condition and Severity Collision Diagram Crashes by SHSP Emphasis Area FDOT, by Type and Severity Crashes by Lighting Condition and Severity Crashes by Pavement Condition, by Lighting Condition and Severity Crashes by Pavement Condition and Severity Collision Diagram, Crashes by Pavement Condition and Severity Collision Diagram Crashes by SHSP Emphasis Area

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2024-june/2024june-fri10-safetyanalysisusingsignal4analytics.pdf?sfvrsn=35605886_1

2024June-Fri11-Strides2ZeroProgramImplementationAndChallenges

through local maintaining agencies Traffic Services Resources: • Push Button Contracts • Pavement,  Backplates  Signage  Yellow Retroreflective Tape  High Visibility Pavement Markings, Tape ✓  ✓  ✓ 1: EB/WB 3: WB High Visibility Pavement Markings ✓ ✓ ✓ ✓ ✓ Skip guidelines, Pavement Markings Skip guidelines m arkings ✓ Pedestrian Signals ✓ Lighting ✓ Determine t he, County: • Refurbishment of Pavement Markings • Verification of Pedestrian Cleara nce Times

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2024-june/2024june-fri11-strides2zeroprogramimplementationandchallenges.pdf?sfvrsn=df4756d9_1

2024nov-thu02-Signal4Analytics

Crashes by Type and Severity Crashes by Lighting Condition and Severity Crashes by Pavement, and Severity Crashes by Lighting Condition and Severity Crashes by Pavement Condition and Severity, by Pavement Condition and Severity Collision Diagram Crashes by SHSP Emphasis Area How should cra, by Type and Severity Crashes by Lighting Condition and Severity Crashes by Pavement Condition, Crashes by Lighting Condition and Severity Crashes by Pavement Condition and Severity Collision

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2024-november/2024nov-thu02-signal4analytics.pdf?sfvrsn=cebb22e5_1

2024nov-thu02-Signal4Analytics

Crashes by Type and Severity Crashes by Lighting Condition and Severity Crashes by Pavement, and Severity Crashes by Lighting Condition and Severity Crashes by Pavement Condition and Severity, by Pavement Condition and Severity Collision Diagram Crashes by SHSP Emphasis Area How should cra, by Type and Severity Crashes by Lighting Condition and Severity Crashes by Pavement Condition, Crashes by Lighting Condition and Severity Crashes by Pavement Condition and Severity Collision

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2024-june/2024nov-thu02-signal4analytics.pdf?sfvrsn=527e95a5_1

3000900int

every year. BITUMINOUS TREATMENTS, SURFACE COURSES, AND CONCRETE PAVEMENT SECTION 300 PRIME, bituminous tack coats on previously prepared bases and on existing pavement surfaces. 300-2 Materials, to the new lift of asphalt pavement. Apply prime to base when asphalt is not placed within 24 hours, Underlying Pavement Surface Target Tack Rate (gal/yd 2 ) 1 Base Course, Structural Course, Dense, Asphalt Pavement Surface, Oxidized and Cracked Asphalt Pavement, Concrete Pavement 0.09 Note 1

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/internal/3000900int.pdf?sfvrsn=c8f8523e_1

3000900ind

every year. BITUMINOUS TREATMENTS, SURFACE COURSES, AND CONCRETE PAVEMENT SECTION 300 PRIME, bituminous tack coats on previously prepared bases and on existing pavement surfaces. 300-2 Materials, to the new lift of asphalt pavement. Apply prime to base when asphalt is not placed within 24 hours, Underlying Pavement Surface Target Tack Rate (gal/yd 2 ) 1 Base Course, Structural Course, Dense, Asphalt Pavement Surface, Oxidized and Cracked Asphalt Pavement, Concrete Pavement 0.09 Note 1

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/3000900ind.pdf?sfvrsn=136aca0_1

2000502-724origind

to achieve satisfactory results or meet applicable specifications. 200-5.3 Rock Base for Shoulder Pavement, location before placing the final course of pavement on the traveled roadway. When dumping material, or contaminating the pavement surface on the adjacent pavement. Immediately sweep off any rock material, Pavement Lanes, Turn Lanes, Ramps, Parking Lots, Concrete Box Culverts and Retaining Wall Systems, quality, traffic safety, and surface drainage characteristics of the pavement and;. 2.the

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/internal/2000502-724origindaa9c4a5a-1f11-4631-bfb5-e82799a16fdb.pdf?sfvrsn=858a3f3c_1

2000502-724origind

to achieve satisfactory results or meet applicable specifications. 200-5.3 Rock Base for Shoulder Pavement, location before placing the final course of pavement on the traveled roadway. When dumping material, or contaminating the pavement surface on the adjacent pavement. Immediately sweep off any rock material, Pavement Lanes, Turn Lanes, Ramps, Parking Lots, Concrete Box Culverts and Retaining Wall Systems, quality, traffic safety, and surface drainage characteristics of the pavement and;. 2.the

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/internal/2000502-724origind.pdf?sfvrsn=28394e6e_1

3460200-722origind

, except for the following when used in slightly aggressive environments: Class I, Class I (Pavement, are designated as Class I, Class I (Pavement), Class II, Class II (Bridge Deck), Class III, Class III (Seal, (2) I (Pavement) (1) 3,000 0.50 1.5 or 3 (3) II (13) 3,400 0.53 3 (2) II (Bridge Deck, Aggressive Moderately Aggressive Slightly Aggressive I, I (Pavement), II, and III (Seal) 470 II, ) LOT Size I one day’s production I (Pavement) 2,000 square yards, or one day’s production

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/3460200-722origind.pdf?sfvrsn=c881d0ac_4

PCSCN50A

 FLORIDA DEPARTMENT OF TRANSPORTATION 10:20 Friday, August 29, 2025 1 ALL SYSTEM PAVEMENT CONDITION FORECAST PAVEMENT IMPROVEMENT PROJECTS IN FM WPA TENTATIVE PLAN -- 2026 - 2031, EXTRACTED, 10:20 Friday, August 29, 2025 1 ALL SYSTEM PAVEMENT CONDITION FORECAST PAVEMENT IMPROVEMENT, 4513441 1.024 16.146 C 2029 0012 "*" INDICATES PAVEMENT DEFICIENT (ANY RATING EB US 90(16.7R, 8.0 7.8 7.6 7.6 7.7 7.3 "*" INDICATES PAVEMENT DEFICIENT (ANY RATING EB US 90(16.7R) FC5M

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/performance/pvmtmgmt/preparedreports/pcscn50a.pdf?sfvrsn=45c54d41_1

PCSCN58A

 FLORIDA DEPARTMENT OF TRANSPORTATION 10:20 Friday, August 29, 2025 1 ALL SYSTEM PAVEMENT CONDITION FORECAST PAVEMENT IMPROVEMENT PROJECTS IN FM WPA TENTATIVE PLAN -- 2026 - 2031, EXTRACTED, 10:20 Friday, August 29, 2025 1 ALL SYSTEM PAVEMENT CONDITION FORECAST PAVEMENT IMPROVEMENT, 8.5 8.4 8.3 8.9 8.8 8.7 "*" INDICATES PAVEMENT DEFICIENT (ANY RATING ( 2.1R) FC125M 2204127 1.567, ----------------------------------------------------------------------------------------------------------------------------------- "*" INDICATES PAVEMENT DEFICIENT (ANY

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/performance/pvmtmgmt/preparedreports/pcscn58a.pdf?sfvrsn=58bec373_1

E3Y90-R0BidTabs

and/or repairs of driveways, sidewalks pipe culverts, ditch pavement, curbs, gutters, and manholes located, ASPHALT PAVEMENT 10.000 TN 250.00000 2,500.00 250.00000 2,500.00 200.00000 2,000.00 0090 0425 5, 23,000.00 187.75000 37,550.00 0165 0524 1 2 CONCRETE DITCH PAVEMENT, NON REINFORCED, 4" 110.000 SY, OF FLEXIBLE PAVEMENT 10.000 SY 10.00000 100.00 100.00000 1,000.00 5.00000 50.00 0185 E425 73 7, 0001 (TRAFFIC CONTROL DEVICES CONTROL (MH SECTION: 0085 0339 1 MISCELLANEOUS ASPHALT PAVEMENT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/bidtabs/2025/sep11/e3y90-r0bidtabs.pdf?sfvrsn=bb819353_1

PublicHearing_MARION COUNTY_Summary

(US 27/441) FROM NORTH OF SE 178TH PLACE TO S OF SE 62ND AVE Type of Work: PAVEMENT ONLY RESURFACE, for Project 450637-1 $20,007,423 450665-1 - SR 40 FROM SW 80TH AVE TO SW 52ND AVE Type of Work: PAVEMENT, - SR 40 FROM 25TH AVE TO NE 64TH AVE Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding, 450952-1 - SR 40 FROM US 441 TO 25TH AVE Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding, TO SR25/500 Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2026 2027 2028 2029

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_marion-county_summary3c04d692-edff-4b42-81af-c2c1021a6de6.pdf?sfvrsn=f67619a2_2

d4-2022-checklist-for-landscape-permit-plans-r0

must also include and label the curbs, edge of pavement, pavement marking showing travel lanes, on the Landscape Plan. NOTE: Provide on the plan the existing roadway pavement marking for the travel, if this project is NOT proposing to use Patterned Pavement within the right of way). Patterned Pavement, . Contractor shall insure that all unsuitable soil including concrete, pavement, road base, stones over 3, 1,000 feet of the sign, measured along the edge of pavement perpendicular from each billboard face

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/project-management/districts/d4/d4-2022-checklist-for-landscape-permit-plans-r0.pdf?sfvrsn=7b44f550_1

OOM_20250127_2024-Maintenance-Contract-Cost-Summary-By-Pay-Item-Number

ASPHALT PAVEMENT, 1" AVG DEPTH SY 48,209.580 $543,486.20 $11.27 0327 70 4 MILLING EXISTING ASPHALT PAVEMENT, 3" AVG DEPTH SY 12,987.700 $249,778.80 $19.23 0327 70 5 MILLING EXISTING ASPHALT PAVEMENT, 2" AVG DEPTH SY 69,512.210 $399,766.33 $5.75 0327 70 6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH SY 177,805.700 $1,046,019.83 $5.88 0327 70 7 MILLING EXISTING ASPHALT PAVEMENT, 4" AVG DEPTH SY 4,297.000 $29,563.36 $6.88 0327 70 11 MILLING EXISTING ASPHALT PAVEMENT, 2 1/4" AVG DEPTH SY

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/maintenance/cont/oom_20250127_2024-maintenance-contract-cost-summary-by-pay-item-number.pdf?sfvrsn=7201e146_1
20 of 7243 results