Standard Plans - FY 2022-23 Errata


The Standard Plans Indexes on the website have been updated to contain the Errata listed below.  The only action required by the user is to replace any copies of affected sheets (listed below) that were downloaded prior to the Errata Date. 

Last updated: 03/04/2024

 

Errata for Road Construction

Index RedlineSheetsErrata DateIndex TitleDescription
000-5252 of 505/09/2023Ramp TerminalsCorrected dimension in the THREE THRU LANES-APPROACH AUXILIARY LANE detail.
102-6007 of 1112/21/2021General Information for Traffic Control Through Work ZonesClarified Notes in the MANHOLES/CROSSWALKS/JOINTS detail
102-603All07/13/22Two-Lane, Two-Way Work Within The Travel WayChanged the Shoulder Taper from L/3 to 25'-50'.
102-6061 of 107/13/22Two-Lane Roadway, Lane Closure Using Temporary Traffic SignalsChanged the Shoulder Taper from L/3 to 25'-50'.
102-6131-4 of 512/16/21Multilane Roadway, Lane ClosuresSheet 1: Corrected the "Right Shoulder Closed" sign label and Notes 3 and 5.
Sheets 2-4: Corrected the "Right Shoulder Closed" sign label.
102-6153 of 501/05/2022Multilane Roadway, Intersection WorkCorrected the R3-7L Sign in the LEFT LANE CLOSED ON FAR SIDE OF   INTERSECTION TURNING MOVEMENTS ALLOWED detail to read "Left Lane   Must Turn Left" 
102-6151 and 3 of 503/04/2024Multilane Roadway, Intersection WorkSheet 1: Corrected the W4-2 sign .
Sheet 3: Corrected the W4-2 sign in both details.
102-6201 of 201/19/2022Multilane Roadway, Temporary DiversionCorrected the Temporary Barrier Call Out. 
102-6282-3 of 312/16/2021Two-Way Left-Turn LanesCorrected the "Right Shoulder Closed" sign label.
350-0011 of 406/02/2022Concrete Pavement JointsAdded Groove to the BUTT CONSTRUCTION JOINT details; Added Dimensions to the CONTRACTION JOINT (Sawed Method) detail.
425-05210 of 1412/10/2021Ditch Bottom Inlets Type C, D, E, and HCorrected Table 10; Deleted Note 1
425-05214 of 1403/30/2022Ditch Bottom Inlets Type C, D, E, and HCorrected Table 13 - Slab Thickness
430-0215 of 604/13/2023Cross Drain mitered End SectionCorrected "Rise" and "Span" notation in Table 2.
430-0225 of 704/13/2023Side Drain Mitered End SectionCorrected "Rise" and "Span" notation in the table.
430-0303 and 4 of 402/15/2023 Straight Concrete Endwalls-Single   Multiple PipeSheet 3: Corrected dimension reference in Note 1.
Sheet 4:  Correct reference in the Legend and the dimension in the SKEWED PIPE PLAN detail.
440-0011-2 of 310/11/2022UnderdrainSheet 1: Updated Underdrain Type I, II, and III Assembly detail to show standard application of underdrain.
Sheet 2: Remove Ditch or Basin Bottom callouts from details.
521-6111 of 411/15/2021Concrete Barrier/Junction Slab-Wall Coping (FRP)Added reference to Index 630-010 for conduit information.
521-6501 of 311/30/2022Light Pole Pedestal - Wall CopingCorrected Table 1 (Double asterisk on the  160mph/50ft note reference).
522-0011 of 203/09/2023Concrete SidewalkCorrected the dimension in the OPEN AND SAWED JOINTS.
659-0101 of 112/22/2022Span Wire Mounted Sign DetailsCorrected the Min. Clearance dimension in the TYPICAL INSTALLATION detail.
700-0103 of 1005/04/2022 Single Column Ground SignsCorrected the Concrete Class in the FOUNDATION TABLE.
700-0201 of 305/04/2022 Multi-Column Ground SignCorrected the Concrete Class in GENERAL NOTE 1.3.F.
700-0901 of 503/16/2022Dynamic Message Sign Walk-InCorrected Note 5.A.b ASTM reference.
700-1011 of 112/10/2021Typical Sections for Placement of Single and Multi-Column SignsDeleted the asterisks and the lower sign detail and numbered the notes in CASE VIII.
706-0013-4 of 601/05/2022Typical Placement of Raised Pavement MarkingsSheet 3: Clarified Title to read "RPM ORIENTATION DETAIL" and clarified the callout to read "Type "E" Curb Shown".
Sheet 4: Clarified the callout for the Traffic Separator Nose in DETAIL "I".
711-0031 of 803/09/2023Interchange MarkingsCorrected the 6" White (3'-9") pavement marking in the TAPER-TYPE ENTRANCE detail.
830-T012 of 212/22/2021Railroad (Grade) CrossingClarified the "3" Max." dimension in the VERTICAL ROADWAY ALIGNMENT THROUGH A RAILROAD CROSSING detail.

 

 

Errata for Bridge Construction

     
----------