656 search results for REPORT NUMBER

D3-07-09-26BSN

of 1990 should send an e-mail to: [email protected] or call telephone number (850, Number is required prior to first-time registration; please visit https://vendor.myfloridamarketplace.com for more information. Please allow 24 to 48 hours for receipt of a new vendor number. Prior, Contracts and Procurement Office before the contract can be executed. BE SURE THAT THE CONTRACT NUMBER, /distco.shtm. NOTICE TO ALL BIDDERS To report bid rigging activities call: 1-800-424-9071 The U.S

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2026/jul09/d3-07-09-26bsn.pdf?sfvrsn=d92eec0d_1

D3-06-11-26BSN

of 1990 should send an e-mail to: [email protected] or call telephone number (850, Number is required prior to first-time registration; please visit https://vendor.myfloridamarketplace.com for more information. Please allow 24 to 48 hours for receipt of a new vendor number. Prior, Contracts and Procurement Office before the contract can be executed. BE SURE THAT THE CONTRACT NUMBER, /distco.shtm. NOTICE TO ALL BIDDERS To report bid rigging activities call: 1-800-424-9071 The U.S

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2026/jun11/d3-06-11-26bsn.pdf?sfvrsn=2784b54b_2

TP-05-12-26BSN

number (407)264-3885. Special accommodation requests under the Americans with Disabilities Act should, Vendor Number is required prior to first-time registration; please visit https://vendor.myfloridamarketplace.com for more information. Please allow 24 to 48 hours for receipt of a new vendor number, be executed. BE SURE THAT THE CONTRACT NUMBER IS ON EACH INSURANCE CERTIFICATE. ADDENDA No negotiations, -offices/distco.shtm. NOTICE TO ALL BIDDERS To report bid rigging activities call: 1-800-424-9071

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2026/may12/tp-05-12-26bsn.pdf?sfvrsn=39e4b317_1

43975025201-PLANS-03-SIGNALIZATION

. SIGNALIZATION PLANS REPORT OF CORE BORING SHEETS MAST ARM ASSEMBLIES DATA TABLE STANDARD MAST, GERALDO JOSE SANCHEZ, P.E. P.E. LICENSE NUMBER 74538 PATEL GREENE AND ASSOCIATES, LLC VENDOR, NO. SIGNALIZATION PLANS GT-1 REPORT OF CORE BORING SHEETS T-2 SIGNATURE SHEET T-9 MAST ARM ASSEMBLIES, , FL 32801 122 W. PINE STREET, SUITE 201 PATEL, GREENE & ASSOCIATES, LLC LICENSE NUMBER 74538, 32801 122 W. PINE STREET, SUITE 201 PATEL, GREENE & ASSOCIATES, LLC LICENSE NUMBER 74538 GERALDO J

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy26-27/ad--27116/43975025201-plans-03-signalization.pdf?sfvrsn=c5d75ff4_1

LEE

Historical AirportInspection Reports Select a report... Inspection Report 09-18-2025 Inspection Report 09-11-2024 Inspection Report 09-21-2023 Inspection Report 09-14-2022 Inspection Report 09-16-2021 Inspection Report 08-05-2020 Inspection Report 09-12-2019 Inspection Report 09-19-2018 Inspection Report 10-19-2017 Inspection Report 10-05-2016 Inspection Record 09-22-2015, Record 05-02-1974 Inspection Record 05-01-1973 Inspection Record 02-17-1972 Inspection Report

https://www.fdot.gov/aviation/airportslist/LEE

ERC Comments (PH2)

 Threads: Submittal Report Description: 417540-6-52-01 PLANS CONSULTANT FIRST Financial, Review. *6/21 Update - Drainage Report added This email shall serve as a transmittal letter for a Phase, ) Drainage Report* (Added 6/21) Plans and supporting documents can be found in the ERC under, -I Contamination Screening Evaluation Report (CSER) submitted for the corridor addressing the Pond, their investigation results in a Level-II Impact to Construction Assessment. Finding from that report

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy26-27/ad-27115/erc-comments-(ph2).pdf?sfvrsn=68af68cd_1

2027FDM260BridgeStruct

analysis and report. The determination is to be based on an assessment of the bridge’s structural and functional adequacy. The engineering report is to include the following: (1) Project, be processed in accordance with FDM 122. The engineering analysis and report should be used, bridge. (3) The number of crashes that would be eliminated by replacement or widening. (4

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/review/2027fdm260bridgestruct.pdf?sfvrsn=2b7bbe16_2

2027FDM201DesignControls

in determining the number and configuration of lanes required and the resulting levels of service provided, of Service: • Roadway gradients and roadside developments • Number, spacing, and types of crossings, and when the number of travel lanes increases or decreases. The FDOT Standard Plans provide guidance, of service through the design year. Forecasted traffic demand and volume are used to establish the number, of a project. A Project Traffic Analysis Report is generally required. When a PD&E study

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/review/2027fdm201designcontrols.pdf?sfvrsn=b1b4abdc_1

PCH-03 APL Certified Process

signals and devices will receive an evaluation report (including deficiencies, as applicable, a final evaluation report. The QMS evaluation process is detailed in Section 5. (3) Step 3A: Product, ) Testing laboratory/report and standards-based checklists specified in matrices; (d) Manufacturer’s, the PATH application ID number and name of the assigned product evaluator on their shipping label, to the applicant via an evaluation report. If the product fails the evaluation four (4) times, the applicant

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/traf_sys/procedural-docs-2022/pch-03-apl-certified-process.pdf?sfvrsn=a2e8ee4b_1

2026FDM211LAFacilities

211.2.2 Pavement Cross Slopes For roadways, the maximum number of travel lanes with cross slope, condition, etc.) • Pavement Conditions Report (e.g. could rutting contribute to water film thickness, Prediction Tool Requirements in Superelevated Sections Project Type Number of Lanes Draining in One, , document the risk evaluation in a report format. At a minimum, the report should include, are slight, and • Future widening is expected. 211.2.5 Number of Lanes on the State Highway System

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm211lafacilities.pdf?sfvrsn=1242969c_11

456242-TechnicalScope-Draft

Pannell, PE RE: SR 70 from E. of SR 45 (US 41) to W. of Tara Blvd. TECHNICAL SCOPE State Road Number: SR 70 Section Number: 13162000 and 1316000 County: Manatee County Project Limits: SR 70 from E, 1. Existing R/W Map Project Numbers: 1354-150(1953), 13160-2503(1955), 1316- 101(1957), 13503-3601, Project Numbers: 196096-1_13162_SR70_RRR_MP0.007_ MP1.450_FY96 429104-1_13162_SR70_POP_MP0.011, old houses or buildings adjacent to the project? No 13. Number of Existing Utilities: 15

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy26-27/ad--27124/456242-technicalscope-draft.pdf?sfvrsn=36cfdf40_1

446451-1 ERC Comments

is approximately 100-foot wide. County Roadway ID Roadway Side Number of Lanes MP From/To OTHER CLOSED, . Submittal Phase Status Date Received Comment Due Response Due Pavement Design Report -- US 41, By Created Date Comment Chris Coughlin 7/14/2023 Note 1: As-Built plans are from 2003. Were ESAL numbers, The ESAL data has been provided by the Department and will be included as an Appendix to the report, , the widening structural number must be equal to or greater than the existing structural number. Optional

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy26-27/ad--27118/446451-1-erc-comments.pdf?sfvrsn=bcea3055_1

44645115201-PLANS-03-SIGNALIZATION

PETERSBURG, FL 33701 P.E. LICENSE NUMBER 67335 CARLOS ANDRES RAMIREZ, P.E. GARRETT ENGINEERING GROUP, SHEET DESCRIPTION SHEET NO. * TO BE SUBMITTED AT PHASE IV REPORT OF CORE BORINGS* T-13 MAST ARM, NUMBER 67335 CARLOS ANDRES RAMIREZ, P.E. ENGINEER OF RECORD T H E O F F I C I A L R E, TELEPHONE NUMBER (239) 213-5011, FOR THE ASSIGNMENT OF THE CONTACT THE MAINTAINING AGENCY CITY, NUMBER 67335 CARLOS ANDRES RAMIREZ, P.E. ENGINEER OF RECORD T H E O F F I C I A L R E

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy26-27/ad--27118/44645115201-plans-03-signalization.pdf?sfvrsn=12d3ee54_1

451022 Technical Scope

Number: SR 684 Section Number: 13040000/13040001/13040002/13130000 County: Manatee County, Project Numbers: 13040-000_1960911; 13040-2501; 13040-2502 2. Old Construction Project Numbers: 13040, % = 4.2 12. Are there any old houses or buildings adjacent to the project? No 13. Number, in the Roadway Safety Audit (RSA) Report US 41/SR 684 (Cortez Road) from 9th Street W. to 5th, gaps were identified in the RSA report and for budget purposes included in the LRE for this project

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy26-27/ad--27121/451022-technical-scope00c6b4e8-82b1-436b-9ba2-1e27cf1823d8.pdf?sfvrsn=73e15ae0_1

D3-08-13-26BSN

Number Proposal Id Proposal Notes Fin Proj Numbers County 7 E3Y64 21904235201(*) GULF 8 E3Y73, Act of 1990 should send an e-mail to: [email protected] or call telephone number (850, Vendor Number is required prior to first-time registration; please visit https://vendor.myfloridamarketplace.com for more information. Please allow 24 to 48 hours for receipt of a new vendor number, NUMBER IS ON EACH INSURANCE CERTIFICATE. ADDENDA No negotiations, decisions, or actions

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2026/aug13/d3-08-13-26bsn.pdf?sfvrsn=96528443_1

2026 Candidate Signalized Intersection Network Screening Report

2026 Candidate Signalized Intersection Network Screening Report,  July 2026 2026 Network Screening Report for Signalized Intersections Traffic Engineering, , the FDOT Traffic Engineering and Operations Office has published a network screening report, screening report for Signalized Intersections is the result of a data-driven network screening process, , including the number of intersection legs, context classification, road type (one-way vs. two-way, . Number of Candidate Signalized Intersections in 2026 FDOT District Total Identified Candidates

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/trafficservices/strides2zero/2026-candidate-signalized-intersection-network-screening-report.pdf?sfvrsn=961db526_1

438262-1 ERC Comments PH II Revised

 Threads: Submittal Report Description: 438262-1-52-01 OTHER CONSULTANT FIRST Financial, **Utility Conflict Matrix **Project Edit Report **Stormwater Management Report **CADD Zip File, Quantities Report; 520-1-12. Please review. Matthew Gibbs 6/29/2026 1 Pay item 520-1-12, and the sheet numbers corrected on the UTV sheets. Michelle Barker 6/17/2026 1 Response Accepted & Comment, worksheets in this plan set for the proposed signs and for multi-post signs, include the number of posts

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy26-27/ad--27134/438262-1-erc-comments-ph-ii-revised.pdf?sfvrsn=7c12264d_1

2027FDM264NoisePerimWalls

are included in the Noise Study Report (NSR) and are summarized in the Environmental Document. Review, by the Department based on the information from a Noise Study Report Addendum (NSR Addendum) provided, Manual. Document the final noise abatement measures for the project in a Noise Study Report Addendum, barrier surface finishes. 264.2.1 Noise Study Report Addendum The re-evaluation of preliminary noise, configurations (height, length and roadway offset). Determine the number of benefited receptors

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/review/2027fdm264noiseperimwalls.pdf?sfvrsn=2bfd131f_1

Highway - Railroad Grade Crossings

Final Report Volume II: Video Based Studies of Flexible Traffic Separators at Highway-Railroad Grade Crossings This report describes a field evaluation of the operation of flexible traffic separator, Volume II Final Report Volume III: Video Based Studies of Highway-Railroad Grade Crossings in the South Florida Railroad Corridor The third document discusses the observation of a large number of video, and unsafe road user behaviors. Volume III Final Report FDOT YouTube Videos

https://www.fdot.gov/rail/studies/safety/vidbase/hwyrrxings.shtm

Transportation Facts at A Glance

 Transportation Facts at a Glance COMMUTING PATTERNS (2024) Public Transportation Use (2024) 7.4% 1.5% 1.1% 2-person carpool 3-person carpool 4+person carpool TRAVEL DEMAND ON PUBLIC ROADS 10.0% Total carpool 1,107,832 # Number of Commuters 69.0% 2.2% 15.5% Drive Alone Use, . They represent the number of pedestrians and bicyclists using trails. Pedestrian Activity Bicyclist Activity, (DVMT) Report , Published 2025 https://tinyurl.com/2024DVMTPublicRoad *Annual VMT is calculated

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/fto/mpomeasures/facts_rmd.pdf?sfvrsn=ac9f01e5_9
20 of 656 results
Top