4266 search results for REPORT NUMBER

E8V06Addenda004

Estimated Quantities Report (PDF file) Digitally signed + sealed 3D Deliverable (XML/DGN file, 44089735201 EQR Revision 2 CATEGORY CATEGORY NUMBER PAY ITEM ADD MOD DEL OLD QUANTITY NEW

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/may30/e8v06addenda004.pdf?sfvrsn=ffb288d2_1

Estimates Bulletin 15-06

or external instrumentation: District Project Number Letting Date 3 220442-7-52-01 9/30/2015 2, report) in the plans. For projects let through December 2015, a Mandatory Specification Revision

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/bulletins/fpc/2015/estimates-bulletin-15-06.pdf?sfvrsn=af388047_1

Target Zero

Search Target Zero What is Target Zero? Target Zero is a statewide initiative to reduce the number of transportation-related serious injuries and deaths across Florida to ZERO. Why does Florida need Target Zero? On average, eight people, (PowerPoint, Meeting Agenda, Report, Single Page) | Download Templates (ZIP) | Fact

https://www.fdot.gov/agencyresources/target-zero

20250929_455220-1_SR-9_93220

 10/20/25 FLORIDA DEPARTMENT OF TRANSPORTATION PCRPJ03 PAVEMENT CORING REPORTING PCRO003 PAVEMENT EVALUATION CORING AND CONDITION DATA INPUT DATA REPORT MANDIST FINPROJ TYPSECT MESSAGE 04 455220-1-52-01 01 THE CONTROL CARD IS CORRECT 10/20/25 FLORIDA DEPARTMENT OF TRANSPORTATION PCRPJ03 PAVEMENT CORING REPORTING PCRO103 PAVEMENT EVALUATION CORING AND CONDITION DATA FIN PROJ, SHOULDER TYPE END MP: 21.85 LENGTH: 1.33 SR NUMBER: NOTFOUND INSIDE: PROJECT MEASUREMENT: ENGLISH

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/pavement/coringdata/d4/93/20250929_455220-1_sr-9_93220.pdf?sfvrsn=521077ce_1

FDOT's Wrong-Way Driving (WWD) Program

the injury severity and number of crashes. &amp, . Call 911 to report. The signage and markings that drivers may encounter on roadways is consistent

https://www.fdot.gov/traffic/teo-divisions.shtm/cmt/Wrong-Way-driving

Product Specifications

and Supplemental Requirements Document Links APL Specification Number - Name Rev No Automated Flagger, 2.2.3-2.2.6, 3.1.1 & 5.4 Checklist 2.0 NEMA TS5 13.1.3-13.1.6 Checklist 1.0 Testing Laboratory and Report

https://www.fdot.gov/traffic/traf-sys/product-specifications.shtm

444634-1_SR72_CE2-Draft

FROM EAST OF I-75 TO LORRAINE ROAD District: FDOT District 1 County: Sarasota County ETDM Number: 14441 Financial Management Number: 444634-1-22-01 Federal-Aid Project Number: N/A Project, given that this activity is expected to increase with the growing number of residential developments, . The Environmental Screening Tool (EST) Sociocultural Data Report (SDR), found in the project file, was executed, and the addition of multi-modal facilities is also expected to reduce the number of crashes and provide safer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26123/444634-1_sr72_ce2-draft.pdf?sfvrsn=efe074d1_1

DEV564DCSS (5-21-20)

: Personnel performing QC inspections must report directly to a QC Supervisor and are required to possess, top coat (product data sheets, lot numbers, and APL numbers). 4. Manufacturer’s recommendation

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/special-case/developmental/dev564dcss-(5-21-20).pdf?sfvrsn=116790cd_1

RelocationMobileHomeBrochure

with the same number of rooms. 4 MOBILE HOME AS PERSONAL PROPERTY If a mobile home, and/or lot. Examples are, title transfer, inspection fees, credit report, appraisal fees, etc. You, fixed move cost schedule The schedule is based on the number of rooms of furniture that must be moved, the agent for the appeal form number 575-040-25. The appeal should be addressed to: Florida Department, Address District Relocation Administrator’s Name and Telephone Number District Relocation Agent’s Name

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/rightofway/documents/relocationmobilehomebrochure.pdf?sfvrsn=d14e330b_3

2026FDM120DsnSubmtls

to be furnished by FDOT functional areas and submittals (number and type) required of the EOR . During, ) & justification report Confirm environmental lighting requirements Pedestrian and bicycle project traffic, are made in alignment, grade, or typical section. Bridge Geotechnical Report D) Surveying and Mapping, & assumptions Bridge Hydraulics Report Request drainage design Request final drainage review Permit, letter data (utilities) Number of sets of final prints for utility companies Topic #625-000-002 FDOT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm120dsnsubmtls.pdf?sfvrsn=8428d756_7

16-Contractor Past Performance Rating CPPR 2024_NEW

 Standard rules of rounding apply  Documentation = Daily Report of C onstruction, Stop Wo rk O, be greater than 100 %  No Deficiency Letter used  Daily Report of C onstruction tracks this. 10, on that many number or days. Make a notation in the remarks section.  This will prevent from “banking, . There are _______ categories in the C ontractors Past Performance Report. 3. The pursuit of work be greater, up on the District CPPR overdue lists. Entry Into CIM  CPA M 13.1.9 Preparing the Report (A)(1

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/training/2024-spring-construction-academy/16-contractor-past-performance-rating-cppr-2024_new.pdf?sfvrsn=f7363996_1

SS3301102

perpendicular to the roadway centerline. Report the cross slope to the nearest 0.1%. Record all, . The average Ride Number of both wheel paths reported to one decimal place. If additional corrections, 4.0, the Engineer will issue a second RN report for those segments in 0.01 mile intervals for both wheelpaths. If the RN in the second report is 3.5 or above for all 0.01 mile intervals in both wheelpaths, the whole segment will be accepted at full payment. If the RN in the second report is less

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2008/january-2008/workbook/ss330110260fc7996ce284b82b612e92aeeabfb2e.pdf?sfvrsn=e53ef7c_0

SS3301102

perpendicular to the roadway centerline. Report the cross slope to the nearest 0.1%. Record all, . The average Ride Number of both wheel paths reported to one decimal place. If additional corrections, 4.0, the Engineer will issue a second RN report for those segments in 0.01 mile intervals for both wheelpaths. If the RN in the second report is 3.5 or above for all 0.01 mile intervals in both wheelpaths, the whole segment will be accepted at full payment. If the RN in the second report is less

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2008/january-2008/workbook/ss3301102.pdf?sfvrsn=a601fd9c_0

acs012816

 American Community Survey – Florida Trends Page 1 of 7 FDOT Trends and Conditions SpecialReport January2016 COMMUTINGTRENDSIN FLORIDA This special report of the FDOT Trends and Conditions series highlights commuting trends in Florida and the United States. It is based on data from the 2014, . The number of commuters driving alone in Florida grew by 233,976 in 2014.  Slightly Less Carpooling, low at 9.1% for Florida and 9.2% for the US. These numbers have dropped 2% for Florida and 1.5

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/trends/special/acs012816_9df3ab3b-6f5d-46ab-987a-5185914d1a6b.pdf?sfvrsn=60f75b08_0

CFSSP Annual Report - Electronicv6

CFSSP Annual Report - Electronicv6, UA L R E P O RT A N N UA L R E P O RT 3 While the numbers are still staggering, we are beginning to see a reduction in the number of tragedies - down from a peak in 2022. Tr a g i c a l l y, p e o, n u a l Report will be released in January, t o e n a b l e p a r t n e r s a c r o s s C e n t r

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d5-safety-documents/cfssp-annual-report---electronicv6.pdf?sfvrsn=21bb9386_1

0090103LS.FHWA

average unit price in the Six Month Moving Statewide Averages report. The dates will be the six months, a computer application that will calculate and print the number of gallons of bituminous material, of this progress estimate. Forallasphalt concrete, the number of gallons will be determined assuming a mix, , F i n a n c i al Project Identification Number, Estimate Number, Monthly Estimate Date, Averages report. The dates will be the six months prior to the letting date for this Contract

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/july-2014/review/fhwa/0090103ls.fhwa.pdf?sfvrsn=acc6d454_0

2024FDM211LAFacilities

, the maximum number of travel lanes with cross slope in one direction is three lanes except as shown, evaluation in report format that includes identification and benefit-cost Topic #625-000-002 FDOT, . Table 211.2.4 Hydroplaning Analysis Requirements in Superelevated Sections Project Type Number, are slight, and • Future widening is expected. 211.2.5 Number of Lanes on the State Highway System See Section 335.02(3) of the Florida Statutes for the number of lanes to be provided on the State

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm211lafacilities.pdf?sfvrsn=11d2f4cb_1

4550701.impl

Engineer to supervise field testing and report the test results. 13. Methods and equipment proposed, published range of values for pH and viscosity of the mixed slurry. Submit a report in accordance, : http://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section24V2.shtm . The report must, the following number (rounded up to the next whole number of tubes) and configuration of cross, Diameter Number of Tubes Required Configuration around the inside of Circular Reinforcing Cage 36

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/implemented/4550701.impl.pdf?sfvrsn=82e4dc5d_0

2024FDMRevisions

as a bicycle facility Updated Figure numbers to reflect the addition of two new Figures; 223.2.1, of items are consistent with latest CADD standards. 902 FDM Estimated Quantities Report All

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2024/2024fdmrevisions.pdf?sfvrsn=f974392e_1
20 of 4266 results