SR A1A over Sebastian Inlet - Bridge Replacement
Welcome
Announcement of Location and Design Concept Acceptance
On May 23, 2023, the Florida Department of Transportation (FDOT), pursuant to 23 U.S.C. § 327 and a Memorandum of Understanding dated May 26, 2023, and executed by the Federal Highway Administration (FHWA) and FDOT, granted Location and Design Concept Acceptance for the SR A1A over Sebastian Inlet – Bridge 880005 – Bridge Replacement from Mile Post (MP) 21.945 to MP 22.665 Indian River County and from MP 0.00 north to MP 0.307 Brevard County PD&E Study in Indian River and Brevard County, Florida.
The project is currently in design and is in the process of establishing right of way requirements along SR-A1A.
The proposed improvements consist of:
A new bridge alignment that is shifted to the east of the existing bridge with:
- Two 12-foot travel lane
- Two 8-foot shoulders
- Two 12-foot shared use paths
South of the bridge, improvements include:
- Addition of a crosswalk crossing SR A1A at the State Park’s south entrance
- Reconfiguration of the State Park’s south entrance including the addition of an exit right turn lane
- A southbound acceleration lane from the State Park’s south entrance
- Lengthened storage of the southbound right turn lane into the State Park
- Continuation of the shared use path on the west side of the bridge and roadway
- Addition of a shared use path on the east side of the bridge and roadway
North of the bridge, the improvements include:
- Reconfiguration of the State Park’s north entrance including the addition of an exit right turn lane
- Lengthened storage of the southbound right turn lane into the State Park
- Continuation of the shared use path on the west side of the bridge and roadway
- Addition of a shared use path on the east side of the bridge and roadway terminating at the State Park’s north entrance
- Addition of a crosswalk crossing SR A1A at the State Park’s north entrance
- Reconfiguration of the Sebastian Inlet District (SID) Access Road
All bridge improvements are located within existing FDOT Right of Way and minimized overall impacts, to the greatest extent practicable, while meeting the stated purpose and need to address the structural and functional deficiencies of the existing bridge and the gap in system linkage for bicyclists and pedestrians. Roadway improvements will require additional right of way to accommodate the aforementioned improvements north and south of the bridge.
This project will now proceed to the next phase of development. For more information please contact:
Mr. Binod Basnet, PE
FDOT Project Manager
3400 West Commercial Boulevard
Fort Lauderdale, FL 33309
Contact phone #: (954) 777-4146
Project Development Process
Project Overview
The Florida Department of Transportation (FDOT) has initiated Design Project along State Road (SR) A1A over Sebastian Inlet. The project location is the Sebastian Inlet Bridge (No. 880005), which carries SR A1A over the Sebastian Inlet at the Indian River and Brevard County line. The purpose of this project is to address the structural and functional deficiencies of the existing bridge and address the gap in system linkage for bicyclists and pedestrians.
A PD&E Study was completed in 2023. Click here to read a copy of the study. Public involvement is a critical component of the design process. We encourage you to become and stay involved throughout the entire project. Please visit this website often to get the most up-to-date information on the Sebastian Inlet Bridge Design Project. Project meetings, workshops, and hearings are advertised on this webpage.
Click here to be included in the mailing list or to leave a comment.
Steve Braun,
District Four Secretary
3400 W Commercial Boulevard
Fort Lauderdale, FL 33309
Tel: 954-777-4100
Fax: 954-777-4197
E-Mail Us
Additional Contacts
Staff Directory