SR-9/I-95 PD&E Study
This page will be updated as documents become available. Please check back regularly for the latest updates.
04/30/26: Virtual Public Hearing; 05/07/26: In-Person Public Hearing
Public Hearing Draft Documents (SUBJECT TO CHANGE)
- DRAFT Systems Interchange Modification Report (SIMR) (Feb. 2026)
- DRAFT Noise Study Report (NSR) (Mar. 2026)
- DRAFT Contamination Screening Evaluation Report (CSER) (Jan. 2026)
- DRAFT Natural Resource Evaluation (NRE) Report (Feb. 2026)
- FINAL Cultural Resource Assessment Survey (CRAS) (Dec. 2023)
- DRAFT Cultural Resource Assessment Survey (CRAS) Addendum (Mar. 2026)
- DRAFT Pond Siting Report (Mar. 2026)
- DRAFT Location Hydraulic Report (LHR) (Mar. 2026)
- DRAFT Utility Assessment Package (UAP) (Mar. 2026)
- DRAFT Conceptual Stage Relocation Plan (CSRP) (Feb. 2024)
- DRAFT Type II Categorical Exclusion (CE) (Apr. 2026)
- DRAFT Geotechnical Technical Memorandum (Mar. 2026)
- DRAFT Tolling Site Technical Memorandum (Mar. 2026)
- DRAFT Concept of Operations (ConOps) (Mar. 2026)
- DRAFT Preliminary Engineering Report (Apr. 2026)
CURRENTLY EXPERIENCING TECHNICAL DIFFICULTIES FOR SOME LINKS. PLEASE CHECK BACK LATER.
Public Hearing Exhibits will be available for viewing on Thursday, April 30, 2026.
10/29/25: Virtual Alternatives Public Workshop; 11/06/25: In-Person Alternatives Public Workshop
Alternatives Public Workshop Materials
Virtual Alternatives Public Workshop Presentation PDF
Virtual Alternatives Public Workshop Presentation Video Recording
10/12/23: Virtual Kick-Off Meeting; 10/17/23: In-Person Public Kick-Off Meeting
Public Kick-Off Meeting Materials
Virtual Kick-Off Meeting Presentation
Recording of Virtual Presentation
No-Build Alternative Traffic LOS