Expired Materials Bulletins


 

Materials Bulletins are issued primarily by the Director, Office of Materials. This action is taken when immediate implementation is needed, i.e., such as to implement a mandatory legislative change, FHWA directive, judicial court ruling, Department policy, or other sensitive issue. The document has temporary authority and shall expire one year after the date of issuance unless extended or rescinded by the Director, Office of Materials.

 

No.
Subject

File Size

Date

20-16
PDF-253KB
09-01-20
20-15
PDF-156KB
07-24-20
20-12
PDF-242KB
04-08-20
20-10
PDF-259KB
04-06-20
20-07
PDF-343KB
02-21-20
20-05
PDF-248KB
02-18-20
20-02
PDF-329KB
01-09-20
08-19
PDF-690KB
06-04-19
06-19
PDF-232KB
02-27-19
11-18
PDF-127KB
08-13-18
07-18
PDF-210KB
08-01-18
06-18
PDF-180KB
04-30-18
04-18
PDF-200KB
04-02-18
13-17
Contractor QC Plans in MAC
PDF-106KB
09-20-17
12-17
CPAM 11.5 - State Construction Engineer (SCE) Approval of Straightedge Deficiencies Left in Place with Pay
PDF-330KB
08-01-17
08-17
Lehigh Cape Canaveral Slag Plant (SLAG08)
PDF-178KB
06-12-17
06-17
Materials Manual, Chapter 9.2, Volume II[Revised]
PDF-88KB
04-06-17
06-17
Materials Manual, Chapter 9.2, Volume II
PDF-88KB
03-20-17
05-17
Soil Classification Acceptance Criteria
PDF-166KB
03-01-17
02-17
Acceptance of Brick Masonry Sand
PDF-165KB
02-06-17
01-17
Asphalt Roadway Daily Report of Quality Control Upload to Materials Acceptance and Certification (MAC) Database
PDF-166KB
01-10-17
12-16
Use of Recycled Concrete Aggregate as Backfill with Aluminum and Metalized Pipe
PDF-162KB
12-23-16
11-16
Titan America Cement Company Plant (CMT23)
PDF-169KB
11-15-16
10-16
Materials Acceptance and Certification System (MAC) Soils/Earthwork Information
PDF-197KB
10-11-16
09-16
Materials Acceptance and Certification (MAC) Full Implementation
PDF-144KB
09-08-16
08-16
Changing PG 76-22 (ARB) to PG 76-22 (PMA)
PDF-600KB
09-07-16
07-16
New ASTM Designation for High Strength Structural Bolts
PDF-494KB
08-01-16
06-16
Buy America Requirements - All Producers
PDF-358KB
07-12-16
05-16
Materials Acceptance and Certification System (MAC) Full Implementation Schedule
PDF-723KB
06-22-16
04-16
Materials Acceptance and Certification System (MAC) Full Implementation Schedule
PDF-386KB
04-13-16
03-16
Cemex Brooksville South Plant (CMT08) [Revised]
PDF-677KB
03-23-16
02-16
Titan America Cement Company Plant (CMT23) [Revised]
PDF-606KB
02-19-16
01-16
Revisions to Specification Section 400 - Concrete Structures [Revised]
PDF-245KB
02-19-16
15-15
Materials Acceptance and Certification System (MAC) Company Profile and MAC Access
PDF-824KB
12-16-15
14-15
Implementation of Vacuum Drying for Determination of Roadway Core Density
PDF-364KB
01-08-16
13-15
Revisions to Specification Section 353 - Concrete Pavement Slab Replacement
PDF-291KB
10-20-15
12-15
Materials Acceptance and Certification System (MAC) Implementation and Contractor Quality Control Plans
PDF-71KB
07-16-15
11-15
Monitor Existing Structures
PDF-1.65MB
07-08-15
10-15
Materials Acceptance and Certification System (MAC) Implementation, Company Profile Training
PDF-937KB
05-29-15
09-15
St. Johns River Power Park Fly Ash - Jacksonville (FA17)
PDF-274KB
04-27-15
08-15
PG 76-22 (ARB) Supply Issues and Changing to PG 76-22 (PMA)
PDF-690KB
03-24-15
07-15
Revisions to Materials Manual Volume II Section 9.2 - Substitution of Materials - Fly Ash
PDF-746KB
03-12-15
06-15
Revisions to Specification Section 346 - Portland Cement Concrete
PDF-275KB
03-02-15
05-15
Emulsions Now Listed on Approved Products List
PDF-315KB
02-20-15
04-15
Protection of Existing Structures
PDF-1.56MB
02-06-15
03-15
Revisions to the Materials Manual Volume II Section 9.2 - Delete the Absorption Testing Requirement
PDF-257KB
01-30-15
02-15
Revisions to Specification Section 346 - Portland Cement Concrete
PDF-488KB
02-03-15
01-15
Separation Technologies - Big Bend, Apollo Beach Fly Ash (FA30)
PDF-731KB
01-22-15
15-14
Boral Materials-Bowen Plant, Fly Ash (FA02)
PDF-658KB
11-10-14
14-14
Reduced Sampling Frequency for Cementitious Material and Water Used at the Concrete Production Facilities
PDF-334KB
11-04-14
13-14
Program Changes to the Management of Concrete Production Facility Chloride Data
PDF-720KB
11-10-14
12-14
Approval of Concrete Curing Compounds
PDF-311KB
10-09-14
11-14
Modification to Specification Section 919 - Ground Tire Rubber for Use in Asphalt Binder
PDF-324KB
10-09-14
10-14
Specification Change for Section 200 Rock Base - Adding Pit Proctor
PDF-1.27MB
08-04-14
09-14
Pilot Study to Verify Data Storage of Chloride Concentrations in Concrete Produced by Argos USA and CEMEX Concluded
PDF-333KB
07-21-14
08-14
American Cement Company (CMT40)
PDF-757KB
07-07-14
07-14
Eye Bolts for Span Wire Assembly
PDF-395KB
05-28-14
06-14
Headwaters Orlando, Fly Ash (FA20)
PDF-714KB
05-19-14
05-14
Cemex Brooksville South Cement Plant (CMT08) [Revised]
PDF-609KB
05-08-14
04-14
Data Storage of Chloride Concentrations in Concrete Produced by Argos USA and Cemex, May 1, 2014 to July 1, 2014
PDF-414KB
04-16-14
03-14
Separation Technologies - Jacksonville, Fly Ash (FA17)
PDF-754KB
04-03-14
02-14
Titan America Cement Company Plant (CMT23)
PDF-744KB
03-24-14
01-14
Vulcan Materials
PDF-646KB
03-10-14
15-13
Specification Change for Rip-Rap, Rubble (Bank and Shore)
PDF-352KB
12-05-13
14-13
Conflict of Interest Clarification
PDF-394KB
10-24-13
13-13
American Cement Company Plant (CMT40)
PDF-865KB
07-25-13
12-13
Identification of Concrete Testing Technicians on the Material Sample Transmittal Card (C-22 Card)
PDF-1.69KB
07-24-13
11-13
Demonstration Project for Non-Metallic Rebar Fasteners
PDF-769KB
07-11-13
10-13
Change from ARB-5 and ARB-12 to PG 76-22 (ARB) on Projects Let Prior to July 1, 2013
PDF-522KB
07-03-13
09-13
Revisions to the Construction Training Qualification Manual Requirements for Requalification of Quality Control Manager, Asphalt Mix Designer, and Concrete Lab Level 2 Qualifications [Revised]
PDF-322KB
05-21-13
08-13
Boral Plant Bowen Fly Ash (FA02)
PDF-697KB
05-02-13
07-13
Technical Specification Change for Reclaimed Concrete Aggregate - Use on Projects with Federal Ai
PDF-385KB
03-13-13
06-13
End of Asphalt Load Segregation Concerns
PDF-396KB
03-26-13
05-13
Approval of Chapter 8.4 of the Materials Manual
PDF-529KB
03-06-13
04-13
Headwaters Resources - Orlando, Stanton, Fly Ash (FA20)
PDF-879KB
03-06-13
03-13
Separation Technologies - Jacksonville, Fly Ash (FA17)
PDF-868KB
03-06-13
02-13
Structural Concrete Resolution Cost for Verification Being Upheld
PDF-517KB
03-06-13
01-13
Modifications to Section 320 - Hot Mix Asphalt - Plant Methods and Equipment and Section 334 - Superpave Asphalt Concrete
PDF-386KB
01-02-13
12-12
Boral Plant Bowen Fly Ash (FA02)
PDF-654KB
12-17-12
11-12
Modifications to Section 916 - Bituminous Materials
PDF-562KB
12-05-12
10-12
Titan America Pennsuco Cement Plant (CMT23)
PDF-140KB
08-27-12
09-12
Pit Sampling
PDF-120KB
06-12-12
08-12
Modifications to Section 334 Superpave Asphalt Concrete
PDF-57KB
06-04-12
07-12
Modifications to Section 300 Prime and Tack Coats
PDF-55KB
05-29-12
06-12
Coating of Structural Steel: Soluble Salt Testing and Caulking
PDF-72KB
04-12-12
05-12
American Cement Company Cement Plant (CMT40)
PDF-673KB
02-16-12
04-12
Specification Change for Coarse Aggregate - No. 89 Stone Specification for No. 8 Sieve
PDF-519KB
02-07-12
03-12
St. Johns River Power Park Fly Ash Plant (FA17)
PDF-674KB
02-01-12
02-12
Reinforcing Steel Sample Frequency, Metals and Guardrail Steel Acceptance
PDF-885KB
02-01-12
01-12
Prestressed Concrete Products Curing Period
PDF-54KB
01-05-12
05-11
Concrete with Lumps and Balls in the Precast/Prestressed Concrete Fabrication Facilities
PDF-92KB
10-07-11
04-11
Unverified Concrete Lots on the Project Final Materials Certifications
PDF-63KB
05-25-11
03-11
Standardized Concrete Sample Number/Lot Number Systems
PDF-77KB
05-25-11
02-11
Specification Change for Section 914-2.2 Stabilization Materials
PDF-72KB
02-28-11
01-11
Loss of Crystal River Power Plant Fly Ash (FA-01)
PDF-154KB
01-20-11
08-10
Recent Specification Revision to Article 346-3.3 Mass Concrete
PDF-93KB
12-27-10
07-10
High Slump Concrete with Lumps and Balls
PDF-104KB
12-01-10
06-10
Specification Change for Coarse Aggregate - Reclaimed Portland Cement Concrete
PDF-205KB
11-10-10
05-10
Qualified Products for Structural Coatings
PDF-58KB
10-25-10
04-10
Field Welding -- Field Welding of Temporary Works [DCE Memo 14-11]
PDF-110KB
09-01-10
03-10
Standardized Concrete Sample Number/Lot Number System [Revised]
PDF-21KB
06-29-10
02-10
Maintenance of Traffic for Existing Steel Structures
PDF-22KB
07-29-10
01-10
Modifications to Section 916 Bituminous Materials
PDF-518KB
04-26-10
11-09
Qualified Products for Materials and Concrete Repair
PDF-379KB
06-09-09
10-09
Centrifugally Spun Cast Concrete Poles
PDF-83KB
05-18-09
09-09
Making Revisions to Contractor Quality Control Plans
PDF-19KB
04-24-09
08-09
Asphalt Recycle Agents
PDF-19KB
04-20-09
07-09
New Requirements for the Superpave Gyratory Compactor
PDF-21KB
04-20-09
06-09
FM 1-T 166 Revisions
PDF-94KB
03-26-09
05-09
AASHTO T 255 Sample Sizes
PDF-31KB
03-25-09
04-09
Changes to Material IDs for Aggregate Base
PDF-17KB
03-26-09
03-09
Warm Mix Asphalt
PDF-386KB
03-26-09
02-09
Specification Change for Coarse Aggregate - Maximum Percent Passing The Minus 200 Sieve
PDF-50KB
01-22-09
01-09
Specification Change for Materials for Concrete Repair
PDF-17KB
01-15-09
11-08
Specification Change for Architectural Pavers
PDF-271KB
10-16-08
10-08
Changes To Logging Samples Into LIMS [Revised]
PDF-453KB
10-16-08
09-08
Substitution of Type Q Epoxy for Type F-2 Epoxy in Florida U Beams
PDF-17KB
08-19-08
08-08
Guidelines for Changing the Binder Type in Friction Course Mixtures from Asphalt Rubber to Polymer Modified
PDF-23.4KB
07-17-08
07-08
Revision to Testing Protocol for Section 948 Class II High Density Polyethylene Pipe
PDF-109KB
07-07-08
06-08
Clarification of Use of Compressive Strength Results to Determine Form Removal
PDF-18.4KB
05-02-08
05-08
Use of Palm Beach Aggregates in FC-5 Mixtures
PDF-20.3KB
03-20-08
04-08
Modified Density and Compaction Requirements for One Inch Thick Lifts of SP-9.5 and FC-9.5 Superpave Mixtures
PDF-23.1KB
03-20-08
03-08
Qualification Changes for Aggregate Technician Training
PDF-34.8KB
03-13-08
02-08
Qualified Products for Structural Coatings for Use of Steel Strain Poles, Signal Mast Arm and Monotube Structures [Revised]
PDF-129KB
04-29-08
02-08
Qualified Products for Structural Coatings [Revised 04-29-08]
PDF-129KB
02-22-08
01-08
Substituting Higher Strength Concrete For Lower Strength Concrete and Substituting Structural Concrete for Non-Structural Concrete
PDF-47KB
01-25-08
11-07
Use of 4 x 8 Inch Concrete Cylinders
PDF-19KB
10-26-07
10-07
Statewide Implementation of Concrete Sample/Lot Numbering System and Report
PDF-69KB
10-29-07
 
-- Related Numbering Instructions
PDF
10-29-07
09-07
Revision to Specification 285 Optional Base Course
PDF-18KB
10-09-07
08-07
Substitution of Concrete Admixtures
PDF-32.3KB
07-05-07
07-07
Verification Testing of Manufactured Products
PDF-125KB
09-19-07
07-07
Verification Testing of Manufactured Products [Revised 09-19-07]
PDF-242KB
07-09-07
06-07
Asphalt Plant Staffing Requirements
PDF-34.4KB
04-12-07
05-07
Detection of Soluble Salts Prior to Painting of Structural Steel
PDF-60.3KB
03-27-07
04-07
Qualified Products for Structural Coatings
PDF-20KB
04-12-07
03-07
Modified Independent Verification Procedure for Asphalt [Revised]
PDF-282KB
08-20-07
03-07
Modified Independent Verification Procedure for Asphalt [Revised 08-20-07]
PDF-250KB
03-14-07
03-07
Modified Independent Verification Procedure for Asphalt [Original, Revised 03-14-07]
PDF-31.22KB
02-19-07
02-07
Change to Specification 975 Structural Coating Materials
PDF-76.3KB
01-25-07
01-07
Quality Control Personnel Training
PDF-51.6KB
01-08-07
11-06
Revisions to 346 Class IV Requirements to Drilled Shafts
PDF-21.1KB
12-07-06
10-06
Clarification For 455-43 Auger Cast Piles
PDF-15.3KB
11-16-06
09-06
Qualified Products For Structural Steel Coatings
PDF-17.9KB
12-12-06
08-06
Revision to 346 - Reduced Frequency for Acceptance Tests
PDF-18.1KB
09-01-06
07-06
Specification Change for Granitic Coarse Aggregate - Maximum Percent Passing the Minus 200 Sieve
PDF-16.7KB
08-24-06
06-06
Use of Alternative Emulsified Asphalt Tack Coat Materials
PDF-423KB
07-27-06
05-06
Specification Change 916-1 Superpave PG Asphalt Binder
PDF-192KB
06-20-06
04-06
Clarification To Section 347
PDF-17.01KB
02-13-06
03-06
Hot Mix Asphalt (HMA) QC Failures
PDF-26.99KB
02-20-06
02-06
Asphalt Roadway Cores In Non-Density Areas
PDF-27.5KB
02-01-06
01-06
Approval of New Section 347
PDF-17.9KB
01-18-06
14-05
Verification Testing of Manufactured Products
PDF-97.5KB
12-06-05
13-05
Policies for Welding Procedure Specifications and Repairs of Steel and Miscellaneous Metal Products Effective January 2006 Lettings
PDF-571KB
11-01-05
12-05
ASTM International Changes to Concrete Testing
PDF-67.3KB
10-13-05
11-05
Use of Approved Aggregate Products without Producer Certification at Hot-Mix Asphalt Plants
PDF-101KB
10-13-05
10-05
Use of Positive Spot Test PG Asphalt Binders
PDF-44.7KB
09-30-05
09-05
#78 Coarse Aggregate
PDF-18.2KB
09-28-05
08-05
Use of Rap Material in Roadway Embankment Construction (Supersedes Materials Bulletin 04-05 / DCE Memorandum 09-05)
PDF-89KB
08-25-05
07-05
Precast/Prestressed Concrete Plant Quality Control Manager
PDF-54.8KB
07-21-05
06-05
Class II High Density Polyethylene (HDPE) Corrugated Pipe Procedures for Initial Product Approval and Manufacturer Quality Control/Quality Assurance
PDF-53.2KB
07-06-05
05-05
Substitution of 07/05 Version of Section 334 on On-Going Asphalt Projects
PDF-38.9KB
05-27-05
04-05
Use of Rap Material in Roadway Construction MB 1-00
PDF-41.4KB
05-27-05
03-05
LIMS Data Entry: Disposition Codes
PDF-15.5KB
05-04-05
02-05
PDF-65.2KB
02-14-05
01-05
Delineation Guidance
PDF-29KB
01-14-05
10-04
Sampling of FC-5 Asphalt Mixtures
PDF-84.40KB
11-02-04
09-04
Correction Factor for Maximum Specific Gravity Test (Gmm), FM 1-T 209
PDF-84.40KB
11-02-04
08-04
Asphalt Mixture Reheating
PDF-90.44KB
11-02-04
07-04
Refer To Materials Bulletin 04-05
N/A
N/A
06-04
Fugitive Dye In Penetrating Sealers For Concrete
PDF-18.1KB
09-14-04
05-04
Contractor Quality Control (CQC) Specification Compliance
PDF-28KB
08-24-04
04-04
Self-Consolidated Concrete, Flowing Concrete
PDF-775KB
06-29-04
03-04
Class I Non-Structural Concrete - Minimum Cementitious Material Content and Maximum Water to Cementitious Materials Ratio
PDF-221KB
06-23-05
 
-- 12-27-04 Revision to 03-04
PDF-157KB
12-27-04
 
-- 10-07-04 Revision to 03-04
PDF-138KB
10-07-04
 
-- 06-23-04 Revision to 03-04
PDF-41.27KB
06-23-04
 
-- 06-15-04 Original to 03-04
PDF-28.98KB
06-15-04
02-04
Redefining the LOTs (334-4.2, 334-4.2.1 and 334-8.1) Change the Sub-Article Number in 285-6.2
PDF-79.64KB
04-19-04
01-04
Thick Lift Compaction of Rock Base
PDF-51.95KB
03-11-04
07-03
Precast Concrete Pipe and Precast Concrete Drainage Structures
PDF-63.4KB
11-13-03
06-03
Contractor Quality Control Implementation of the Unsoaked LBR Test
PDF-221KB
10-21-03
05-03
Conflict of Interest
PDF-42.9KB
09-25-03
04-03
Guidance to Asphalt Verification Technicians
PDF-552KB
05-25-03
03-03
Section 400-Concrete Structures (REV 6-11-02)
(FA 7-19-02) (1-03) Penetrant Sealers for Concrete Surfaces
PDF-40.7KB
05-20-03
02-03
User of 4 x 8-in Compressive Strength Test Cylinders
PDF-40.9KB
04-21-03
01-03
Precast Concrete Pipe and Precast Concrete Drainage Structures
PDF-120KB
04-21-03
07-02
Precast Concrete Pipe/Precast Concrete Drainage Structures
PDF-60.26KB
12-03-02
06-02
Implementation of Manufactured Products Acceptance Process Change
PDF-94.59KB
11-25-02
05-02
Substitution to a Higher Class of Concrete
PDF-28.25KB
09-05-02
04-02
Frequency Reduction of Reinforcing Steel
PDF-33.93KB
08-21-02
03-02
Contractor Guaranteed Asphalt Pavement
PDF-31.91KB
08-13-02
02-02
Project Documentation in the Delegation of Final Materials Certifications
PDF-103KB
07-31-02
01-02
Aluminum Clad Drainage Pipe
PDF-37.7KB
04-19-02
01-01
Implementation of the Unsoaked LBR Test [Obsolete]
PDF-15.35KB
01-09-01
01-00
Use of RAP Material in Roadway Construction
HTML
11-13-00
N/A
Acceptance Process for Manufactured Products by Certification
PDF-805KB
N/A
Notice
Changes to the Florida Sampling and Testing Methods
PDF-40.9KB
12-12-00