Errata for Road Construction

Index RedlineSheetsErrata DateIndex TitleDescription
430-0216 of 611/18/2019 Cross Drain Mitered End Section Corrected Steel Bar Thickness in the TONGUE AND GROOVE  CONNECTOR   DETAIL.
430-0224 of 708/12/2021 Side Drain Mitered End Section Corrected Dimension "C" to "A" in the Elevation view in the ROUND   CORRUGATED PIPE detail. 
425-0301 of 211/25/2019 Median Barrier Inlets Type 1 and 2 Corrected Index reference in General Note 2.
430-0303 of 402/13/20 Straight Concrete Endwalls-Single   Multiple Pipe Corrected the Elliptical Concrete and Corrugated Metal Pipe Table (Rise/Span).
430-0303 and 4 of 402/15/23 Straight Concrete Endwalls-Single   Multiple PipeSheet 3: Corrected dimension reference in Note 1.
Sheet 4:  Correct reference in the Legend and the dimension in the SKEWED PIPE PLAN detail.
433-0011 of 306/21/2021 French Drain Corrected the General Notes and Table of Contents
443-0023 of 311/18/2019 Skimmers For French Drain Outlets Corrected TYPE II Details Side Elevation Dimension.
IR509-0703 of 403/25/2020 Railroad Grade Crossing Traffic   Control Devices Corrected the 15"Min. dimension from Stop Bar to Track in the RAILROAD   CROSSING AT TWO-LANE ROADWAY Detail.
521-0101 of 210/15/2020 Opaque Visual Barrier Added concrete class per previous standard.
521-6202 of 401/07/2020 Concrete Barrier/Raised Sidewalk-   Wall  Coping Corrected reference in Note 7.
521-6501 of 309/11/2020 Light Pole Pedestal - Wall Coping Corrected Index reference in Note 1.
522-0027 of 804/30/2020 Detectable Warnings and Sidewalk  Curb Rams Deleted Sheet 7 of 8 and renumbered Index.
546-0103 of 301/07/2020 Ground-In Rumble Strips Corrected Location G's Depth in the RUMBLE STRIP DEPTH TABLE.
630-0014 of 4 05/20/2020 Conduit Installation Details Corrected dimensions on SECTION A-A.
659-0101 of 112/22/2022 Span Wire Mounted Sign Details Corrected the Min. Clearance dimension in the TYPICAL   INSTALLATION detail.
700-0106 of 1002/13/20 Single Column Ground Signs Clarified Notes 1 and 2.
700-101 1 of 106/24/2020 Typical Sections for Placement of   Single and Multi-Column Signs The intent of the change with the 20-21 Standard Plans was to provide     flexibility of the sign locations in accordance with the MUTCD. It was not to     create new offsets for the sign location.
700-1201 of 1009/29/2020 Enhanced Highway Signing   Assemblies Clarified Note 5 by adding 6" thickness to the dimensions.
711-00111, 13 of 1312/19/2019 Pavement Markings Added note to table for clarification.

 

 

Errata for Bridge Construction

Index RedlineSheetsErrata DateIndex TitleDescription
455-1242 of 210/15/2020 24" Square CFRP & SS Prestressed   Concrete Pile Corrected Spiral Ties in the Elevation View.
  515-0211 of 102/17/2020 Pedestrian/Bicycle Bullet Railing   For Traffic Railing Corrected spelling in Note 1.
  515-0221 of 302/17/2020 Pedestrian/Bicycle Bullet Railing   Details POST "CI" DETAILS-corrected spelling.
550-0132 of 3 02/26/2020 Bridge Fencing (Over Railroad Corrected Posts F1083 pipe size in the TABLE OF CHAIN LINK FENCE COMPONENTS.