Structures Design Office
Meeting Information
Dates
May 3, 2017, 1:00pm - 5:00pm
   
Location
FDOT - District 7 HQ 
Auditorium
11201 North Malcom McKinley Drive,
Tampa, Florida 33612
Presentations:
Outline & Agenda
Bridge Design (Masseus & Siddiqui)
Developmental Design Standards (Nolan)
Research Project & Monitoring (Roddenberry)
Construction Oversight Perspective (CEI/D7 Construction) 
Contractor's Perspective (Astaldi)
Corrosion Free Design with FRP Composites (Padilla)
Post Workshop Reports:
- BDV30 706-01 Inspection and Monitoring of Fabrication and Construction for the West Halls River Road Bridge Replacement
        
- Deliverable 1a – End of Construction Report for Inspection and Monitoring
 - Deliverable 1b & 2b – Durability Testing – Initial (EOC) and 9 Months
 - Deliverable 2a - End of Construction Six-Month Report
 - Deliverable 3b - Durability Testing: One-Year Report
 
 - Research Showcase – Halls River Bridge: BDV30 706-01
 
Other Media Links:
- Composites: Sustainable, Innovative Infrastructures Solutions for Halls River Bridge (Video) September 21, 2016
 - Florida Bridge Project To Test Composites (ENR Southeast) January 2, 2017
 - Halls River Bridge Site Interviews (Video) May 4, 2017
 - Rebar Reinvented - composite solutions (Video) May 4, 2017
 - Deployment of Composite Reinforcing (Concrete International) May 5, 2017
 - Fiber Reinforced Polymers: The Future of Concrete Infrastructure (University of Miami, College of Engineering, News) June 20, 2017
 - Twelve Firsts in Structural Engineering on the Halls River Bridge (Podcast: The Structural Engineering Channel) November 29, 2019