Specification Review: Origination Form, Red Lines, and DRAFT Implementation.
 Specification Comments: Click on the corresponding Comments link to submit a question or comment.
 Associated Standard Plans Review: Associated Standard Plans should be reviewed with corresponding Index. Click on the corresponding Specification Review to submit a question or comment.

REVIEW ENDING DATE: COB 8/26/2026

 Specifications
 Review
Specification Title Specification
 Comments
 Associated
 Standard Plans 
 Review

 Associated
 Standard Plans
 Comments
0060103Control of Materials *Associated with 9720000

Comments 

----
4150100
Reinforcement For Concrete *Associated with 9310100----
6490100Galvanized Steel Poles, Mast Arms, and Monotube Assemblies----
7050301Object Markers and Delineators----
9310100Metal Accessory Materials for Concrete Pavement and Concrete Structures *Associated with 4150100----
9490100Miscellaneous Components for Manholes, Inlets, and Other Structures----
9720000Recycled Plastic Products *Associated with 0060103----
9810100Turf Materials----
9920102Highway Lighting Materials----
 


   
REVIEW ENDING DATE: COB 8/19/2026

 Specifications
 Review
Specification Title Specification
 Comments
 Associated
 Standard Plans 
 Review

 Associated
 Standard Plans
 Comments
1050404MM92V2Contractor Quality Control General Requirements *Associated with 3460302

Comments 

----
3460302
Structural Portland Cement Concrete *Associated with 1050404MM92V2----
7000101Highway Signing *Associated with 9940101 and 9950209----
7100300Painted Pavement Markings *Associated with 7110201----
7110201Thermoplastic Pavement Markings *Associated with 7100300----
9320401Nonmetallic Accessory Materials for Concrete Pavement and Concrete Structures----
9650100General Provisions for Aluminum Items (Including Welding)----
9940101Retroreflective and Nonreflective Sheeting and Sign Panel Fabrication *Associated with 7000101----
9950209Traffic Control Signals and Device Materials *Associated with 7000101----
9960302Intelligent transportation System Device and Auxiliary Component Materials----
 

 

   REVIEW ENDING DATE: COB 8/12/2026

 Specifications
 Review
Specification Title Specification
 Comments
 Associated
 Standard Plans 
 Review

 Associated
 Standard Plans
 Comments
1040400Prevention, Control, and Abatement of Erosion and Water Pollution

Comments 

----
1050404MM8V2
Contractor Quality Control General Requirements----
1100100Clearing and Grubbing *Associated with 9560000110-200--
4002103Concrete Structures----
4600402Structural Steel and Miscellaneous Metals----
5150100Metal Pedestrian/Bicycle Railings, Guiderails, Handrails, and Bollards *Associated with 9560000*110-200--
5480100Retaining Wall Systems *Associated with 9360000----
6110100Acceptance Procedures For Traffic Control Signals and Devices----
9360000Components For Retaining Wall Systems *Associated with 5480100----
9560000Incidental Products *Associated with 1100100 and 5150100110-200--
 

REVIEW ENDING DATE: COB 8/5/2026

 Specifications
 Review
Specification Title Specification
 Comments
 Associated
 Standard Plans 
 Review

 Associated
 Standard Plans
 Comments
4550202Structures Foundations

Comments 

----
6350300
Pull Boxes, Splice Boxes, Junction Boxes, and Fiber Optic Splice Vaults----
6390307Electrical Power Service Assemblies----
SP4550000DBStructures Foundations (Design Build)----
 
Top