BOE Updates

Review Package = Origination Form and Draft Implementation in Red Line.
Cycle = The year or cycle that revisions were made to the Section.
Comments/Responses = Comments and Responses with action taken to Comments.
N/C = No Comments were received during review.
FHWA Approval = Approved Red Line and Final (FHWA clean copy).


Current Cycle Updates
 

 

Review PackageStandard Specifications and Special Provision Title Notes
1020700Maintenance of TrafficNew pay item to be created under
102-78-A
1200603Excavation and EmbankmentNew pay item to be created *570-13* (currently detailed as HOLD)
1250100Excavation and Embankment for Structures and PipePayment will be incidental. Certain requirements to be meet under Section 110.
2870000Asphalt Treated Permeable BasePay item structure will be set to obsolete.
3000900Prime and Tack CoatsWill be considered as incidental work.
3300601Hot Mix Asphalt - General Construction RequirementsIn conjunction with changes to 2870000. **ATPB and 287-8 being removed**
3370000Asphalt Concrete Friction CoursesAddition of 2 FC-7 Pay items.
4550201Structures FoundationsMultiple pay item structures to have updates in the details and structure sections in DQE.
4580100Bridge Deck JointsNew pay item structure to be created *458- 3- * Galvanized Steel Sidewalk Cover Plate. Per foot.
5500200FencingThe phrase "and accepted by Engineer" removed from paragraph under Gate Payment.
5700308Performance TurfNew pay item structure to be created *570-13* (currently detailed as HOLD)
7060600Raised Pavement Markers and Marker AdhesiveLanguage in details to be changed. New pay item to be added under 102-78-A for temporary RPMs.
7100401Painted Pavement MarkingsChanges made in the Details of the pay item structure concerning durable paint for island nose paintings.
SP4550000DBStructures Foundations (Design Build)Multiple pay item structures to have updates in the details and structure sections in DQE.