4643 search results for fla

PgmMgt Memo 23-01

Temporary Traffic Control (Maintenance of Traffic) Personnel: Worksite Traffic Supervisors, flaggers

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/lap/lapmemos/pgmmgt-memo-23-01.pdf?sfvrsn=806da66_1

SP1020301WDorigind

and flagging operations and maintenance of all temporary traffic control devices are ready for work, and flagging operations and maintenance of devices are ready to begin. Travel time to and from

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/maintenance/review-package/sp1020301wdorigind.pdf?sfvrsn=6e0bd4e2_4

0071100.impl

or adjacent to railroad company right-of-way. 7-11.4.3 Watchman or Flagging Services: The railroad company will furnish protective services (i.e., watchman or flagging services) to ensure the safety

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/implemented/0071100.impl.pdf?sfvrsn=3016013d_0

2024 BOE Manual

) correlates to the Spec Type flags in the BOE, allowing for easy identification of items that may require, online through DQE. This report also includes valid (effective/obsolete) dates. A Spec flag is assigned, , Developmentals, Trial Items 1000s Utilities 2.8.3 Specification Flags on Pay Items Several letters or “flags” are used on the Master Pay Item list to indicate when a pay item is non-standard. The Spec-Type flags in the BOE are indications of the level of pay item support that were likely

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/publications/boe/2024-boe-manual.pdf?sfvrsn=95ad35c8_1

2025 BOE Manual

with a character. That character (letter) correlates to the Spec Type flags in the BOE, allowing, (effective/obsolete) dates. A Spec flag is assigned to all pay items for non-standard work. See, , Developmentals, Trial Items 1000s Utilities 2.9.3 Specification Flags on Pay Items Several letters

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/publications/boe/2025-boe-manual.pdf?sfvrsn=2c3b7dfa_1

Bulletin/Memorandum - 2015 to Present

Management Bulletin 18-03Guardrail - Flared Approach Terminals (FHWA Approved: 2/21/2018) 3/1/18 RDB, 15-10 Roadway Design Bulletin 15-10 Temporary Traffic Control - Warning Lights and Flags

https://www.fdot.gov/roadway/bulletin/default.shtm

Design Standards 2002 Interim

to include curb ramp detectable warning. See flag on drawing for implementation information.Revised, or at the contractor's option whenever the plans call for the flared end anchorage option. This Interim

https://www.fdot.gov/roadway/ds/02/istds.shtm

E4Y06 BidTabs

FROM FLAMINGO AVENUE TO SOUTH OF PINE AVE - RES 44840515201 (*) 44840515202 44840515203 N, ), tree (protection, pruning), and sod along State Road A1A (North Ocean Drive) from south of Flamingo, : 44840515201 (*) 44840515202 44840515203 Fed Aid No: SR-A1A FROM FLAMINGO AVENUE TO SOUTH

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/bidtabs/2025/sep05/e4y06-bidtabs.pdf?sfvrsn=df5f9a50_1

Section113V2-724

on at least three material specific reference blocks and/or mock-up specimens that contain flaws, scanning. For manual supplemental examinations such as for transverse flaw detection, scanning shall, is equal to or less than the maximum allowable length under the provisions of Class B or C, the flaw, be verified for linearity. A. Select a flat (normal incidence) linear array phased array probe

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/materials-manual/redline/section113v2-724.pdf?sfvrsn=8618b58c_1

102-100

 1 0 / 3 1 / 2 0 2 4 7 : 2 5 : 4 4 A M R E V I S I O N DESCRIPTION: REVISION LAST of STANDARD PLANS FY 2025-26 SHEET INDEX Lateral Offset Edge of Travel Way Slope 1:10 or Flatter Asphalt Pad Pavement or Flexible or Rigid Pavement/Asphalt Width Setback Distance Barrier Unit Barrier Delineators Above Ground Hazard Drop-Off Hazard Setback Distance, units. post-tensioned tendons within the concrete deck (top flange of concrete box girders

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/102-100.pdf?sfvrsn=4de1b7ae_2

1020921.impl

be used, at the Contractor’s option, as an alternate to flaggers for lane closure operations on two- lane, as an alternative to flaggers will be included in Maintenance of Traffic, lump sum. ARTICLE 102-13

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/implemented/1020921.impl.pdf?sfvrsn=c006a25d_0
20 of 4643 results