3726 search results for fla

Florida Department of Transportation Kicks Off Annual 'Operation Southern Slow Down'

Enforcement and Education Campaign Aims to Reduce Traffic Fatalities TALLAHASSEE, Fla.— The Florida

https://www.fdot.gov/info/co/news/2024/07152024

FDOT Highlights Innovative Measures to Enhance Work Zone Safety During Work Zone Awareness Week

, Fla. — This week, the Florida Department of Transportation (FDOT) is proud to join fellow

https://www.fdot.gov/info/co/news/2025/04212025

9750000-723impl

and ceiling exposure limits for all components, lower and upper explosive limits, flash point, boiling, sixteen flat and four composite test panels in accordance with AASHTO R-31 (in color White, Grey or Green, twelve flat test panels for random laboratory verification testing. 975-2.2.2 Outdoor Exposure Testing: Prepare and coat eight test panels (four flat and four composite) for exposure, . 975-7.2 Performance Requirements: For laboratory testing, use flat test panels prepared

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/implemented/9750000-723impl.pdf?sfvrsn=90c6a26a_1

9750000-723origind

components, lower and upper explosive limits, flash point, boiling point, amount of volatile organic, the application requirements of Section 560. Prepare and coat sixteen flat and four composite test panels, flat test panels for random laboratory verification testing. 9750000 All Jobs 975-2.2.2 Outdoor Exposure Testing: Prepare and coat eight test panels (four flat and four composite) for exposure, installation. 975-7.2 Performance Requirements: For laboratory testing, use flat test panels

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/internal/9750000-723origind.pdf?sfvrsn=fff1826e_1

D4520000.do

that offsets in flat surfaces do not exceed 1/16 inch [1.5 mm] and that offsets with corners and bends do, . Covertheabuttingsurfaceofthematch cast segment with a thin film of a bond breaker consisting of flax soap and talc, or other material approved by the Engineer. Use a soap and talc mixture consisting of five parts flax, in. per 20 ft not to exceed 1/2 in. [± 6 mm per 6 m not to exceed 13 mm] Flat Surface (deviation

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2004/january-2004/workbook/d4520000.do571f5ddb0a18491d97d08dcbf65fb0f9.pdf?sfvrsn=6ee1eeb7_0

4520000SS

. Wheresectionsofforms are joined, ensure that offsets in flat surfaces do not exceed 1/16 inch [1.5 mm, segment with a thin film of a bond breaker consisting of flax soap and talc, or other material approved by the Engineer. Use a soap and talc mixture consisting of five parts flax soap to one part, not to exceed 13 mm] Flat Surface (deviation from a plane at any location) ±0.025 in/ft not to exceed

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2005/january-2005/workbook/4520000ss.pdf?sfvrsn=8c2d4f07_0

4520000SS

. Wheresectionsofforms are joined, ensure that offsets in flat surfaces do not exceed 1/16 inch, . Covertheabuttingsurfaceofthematch cast segment with a thin film of a bond breaker consisting of flax soap and talc, or other material approved by the Engineer. Use a soap and talc mixture consisting of five parts flax soap to one, not to exceed 13 mm] Flat Surface (deviation from a plane at any location) ±0.025 in/ft

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2006/january-2006/workbook/4520000ss.pdf?sfvrsn=196bc72_0

SS4520000

. Wheresectionsofforms are joined, ensure that offsets in flat surfaces do not exceed 1/16 inch, breaker consisting of flax soap and talc, or other material approved by the Engineer. Use a soap and talc mixture consisting of five parts flax soap to one part talc. The Engineer will base, ft not to exceed 1/2 inch. Flat Surface (deviation from a plane at any location) ±0.025 in/ft

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2010/january-2010/workbook/ss4520000.pdf?sfvrsn=99075657_0

SS4520000

. Where sections of forms are joined, ensure that offsets in flat surfaces do not exceed 1/16 inch, surface of the match cast segment with a thin film of a bond breaker consisting of flax soap and talc, or other material approved by the Engineer. Use a soap and talc mixture consisting of five parts flax, per 20 ft width or depth ±1/4 inch per 20 ft not to exceed 1/2 inch. Flat Surface (deviation from

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2012/january-2012/workbook/ss4520000.pdf?sfvrsn=2c649539_0

E4X48 Attached Forms

%), which the Vendor shall pay to the State. For payments within the State accounting system (FLAIR

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/rfp/e4x48/e4x48-attached-forms.pdf?sfvrsn=aeed7249_1

SPM1020301WD-724-i19191

 MAINTENANCE OF TRAFFIC – WORK DOCUMENT. (REV 1-27-23) (FY 2024-25) SUBARTICLE 102-3.1 is deleted and the following substituted: 102-3.1 Contractor’s Responsibility: Time begins when the Engineer is notified that setup is complete and flagging operations and maintenance of all temporary traffic control devices are ready for work to begin. Time ends when work has been completed. Notify the Engineer immediately when work has been completed. travel time to and from the work site, as well

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/maintenance/finalized/spm1020301wd-724-i19191.pdf?sfvrsn=bae99c83_1

SPM1020301WD-725-i19870

 MAINTENANCE OF TRAFFIC – WORK DOCUMENT. (REV 1-20-25) (FY 2025-26) SUBARTICLE 102-3.1 is deleted and the following substituted: 102-3.1 Contractor’s Responsibility: Time begins when the Engineer is notified that setup is complete and flagging operations and maintenance of all temporary traffic control devices are ready for work to begin. Time ends when work has been completed. Notify the Engineer immediately when work has been completed. travel time to and from the work site, as well

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/maintenance/finalized/spm1020301wd-725-i19870.pdf?sfvrsn=2fe8756e_1

SPM1020301WD-723-i18715

 MAINTENANCE OF TRAFFIC – WORK DOCUMENT. (REV 1-27-23) (FY 2023-24) SUBARTICLE 102-3.1 is deleted and the following substituted: 102-3.1 Contractor’s Responsibility: Time begins when the Engineer is notified that setup is complete and flagging operations and maintenance of all temporary traffic control devices are ready for work to begin. Time ends when work has been completed. Notify the Engineer immediately when work has been completed. travel time to and from the work site, as well

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/maintenance/finalized/spm1020301wd-723-i18715.pdf?sfvrsn=897e370f_2
20 of 3726 results