;

231 search results for bridge maintenance

E3Z29

): 45294715202 Federal Aid No: N/A Total Roadway Length: 4.024 Miles Contract Days: 140 Total Bridge, Section 0001 Roadway 0101- 1- MOBILIZATION (45294715201) LS 1.000 0102- 1- MAINTENANCE OF TRAFFIC, 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 280.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 280.000 0102-115- TYPE III BARRICADE ED 8.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2026/dec10/e3z29.pdf?sfvrsn=5910b5ed_1

Leon County FY27-31 Summary

DR) OVER STILL CREEK BRIDGE #550012 Type of Work: BRIDGE REPLACEMENT Phase Funding Source 2026, SLOUGH BRIDGE NO 550054 Type of Work: BRIDGE REPLACEMENT Phase Funding Source 2026 2027 2028 2029, MAGNOLIA DR. OVER FG&A RR BRIDGE NO. 550011 Type of Work: BRIDGE-REPAIR/REHABILITATION Phase Funding, OVER I-10 BRIDGE NO. 550076 Type of Work: BRIDGE-REPAIR/REHABILITATION Phase Funding Source 2026, for Project 454807-1 $1,470,750 454858-1 - SR 8 (I-10) FROM OCHLOCKONEE RELIEF BRIDGE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d3_adopted_documents/leon-county-fy27-31-summary.pdf?sfvrsn=78367d6c_1

2027FDMPart9PlansProduction

, supplemental site maps, bridge repair plans). 900.2 Labeling and Dimensioning Requirements Orient, , shoulder surfaces, sidewalks, bridge decks) - as a decimal part of a foot vertical per foot, bridge structures) in the plan view. Topic #625-000-002 FDOT Design Manual January 1, 2027 901, submittal that address the following: • Design speed • Lane widths • Shoulder widths • Bridge widths, distances • Intersection sight distances • Horizontal and vertical clearances • Existing bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdmpart9plansproduction.pdf?sfvrsn=dc86c8e2_1

Department Section 129 Final Report _ Signed

129 requirement to verify adequate maintenance of the toll facilities is conducted by the Department’s Office of Maintenance for Fiscal Year 2025-26 and is outside the scope of this review, requirement to verify adequate maintenance of the toll facilities was conducted by the Department’s Office of Maintenance for Fiscal Year 2025-26 and is outside the scope of this review, and maintenance of the toll facility, including reconstruction, resurfacing, restoration, and rehabilitation

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ig/reports/department-section-129-final-report-_-signed.pdf?sfvrsn=1976e568_1

District Seven Asset Maintenance Contracts

District Seven Asset Maintenance Contracts, Results Posting Notice E7P33Inspection, management, and performance of maintenance on all bridge, Search District 7 Asset Maintenance Contracts, of Events Planholders Addenda Posting Notice E7U86 District 7 Interstate Highway I-75 Asset Maintenance, E7U18 District 7 Interstate Highways Asset Maintenance Contract(Hillsborough and Pinellas Counties, Maintenance Contract Other Documents Previous contract files (E7J67) Advertisement Schedule

https://www.fdot.gov/contracts/district-offices/d7/lettings/asset-maintenance/asset-maintenance.shtm

2027FDM113RWRequirements

maintenance by the Department beyond the term of the easement can be constructed on a Temporary, a reasonable maintenance buffer. The roadway cut and fill slopes, drainage ditch slopes and other, be required for project access, maintenance of the facility, or transit facility needs? Check pond, by maintenance pursuant to Section 95.361, F.S. (Maintenance Statute). Topic #625-000-002 FDOT, construction or maintenance of the finished facility. The LA allows the Department entry to the property

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdm113rwrequirements.pdf?sfvrsn=2bfe811d_3

2027FDM281TollSiteRoadway

of the maintenance pull-off area must tie into the shoulder a minimum of 25 feet before bridges or similar roadside features. (b) TTC for bridge/sign structure inspection and maintenance that may extend into the toll site. (c) TTC for bridge widening and/or replacements that may extend, one shoulder with a minimum width of 10 feet. This is to provide adequate space for maintenance, the gantry as a travel lane during maintenance activities to avoid closing the entire ramp. Topic

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdm281tollsiteroadway.pdf?sfvrsn=3d77fc5f_7

Historical Item Averages Market Area 07

$1,362.49 $13,919,164.51 10,216.000 DA N MAINTENANCE OF TRAFFIC 0102 2200 10 $21.79 $8,537,767.31, MATERIAL FOR TEMPORARY DRIVEWAY MAINTENANCE 0102 4 1 5 $30.94 $182,837.42 5,910.000 SY N PEDESTRIAN, $279,458.96 15,339.000 ED N TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 0102107 1 16 $16.45 $252,322.31 15,339.000 ED N TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 0102112 6 $151.66 $290,121.60 1,913.000 DA N EXISTING ITS MAINTENANCE 0102115 16 $1.89 $318,112.21 168,342.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/market-area/pdf/historical-item-averages-market-area-07.pdf?sfvrsn=b2fc8db_16

Historical Item Averages Market Area 07

$13,919,164.51 10,216.000 DA N MAINTENANCE OF TRAFFIC 0102 2200 10 $21.79 $8,537,767.31 391,846.000 SY, FOR TEMPORARY DRIVEWAY MAINTENANCE 0102 4 1 5 $30.94 $182,837.42 5,910.000 SY N PEDESTRIAN OR BICYCLE, 15,339.000 ED N TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 0102107 1 16 $16.45 $252,322.31 15,339.000 ED N TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 0102112 6 $151.66 $290,121.60 1,913.000 DA N EXISTING ITS MAINTENANCE 0102115 16 $1.89 $318,112.21 168,342.000 ED N TYPE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/market-area/excel/historical-item-averages-market-area-07.xlsx?sfvrsn=9089faf6_17

2027 TEM Chapter 5 - Special Operational Topics

Maintenance Office to determine permitting requirements and review existing maintenance agreements, crossing with a STOP sign ( R1-1 ), traffic signal, or grade-separated pedestrian bridge or tunnel, responsible for the maintenance agreement. 5.2.5 SELECTION CRITERIA 5.2.5.1 Marked Crosswalk Validate, warning markings. Once approved, coordinate installation with the District Maintenance Office, with the District Maintenance Office prior to requesting DTOE approval to use this sign type

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/trafficservices/studies/tem/tem-2027/2027-tem-chapter-5---special-operational-topics.pdf?sfvrsn=7410e164_1

Historical Item Averages Statewide 6 Months

- PREVENTATIVE MAINTENANCE & ROUTINE REPAIR 0465 21 2 $1,000.00 $719,000.00 719.000 DA N MOVABLE BRIDGE, $57,345,507.56 52,173.000 DA N MAINTENANCE OF TRAFFIC 0102 2142 1 $325,000.00 $325,000.00 1.000 LS Y SPECIAL DETOUR- TEMPORARY BRIDGE, PROJECT 445148-1-52-01 0102 2200 30 $16.59 $7,736,330.54 466,444.000, FOR TEMPORARY DRIVEWAY MAINTENANCE 0102 4 1 38 $51.86 $1,175,739.95 22,672.000 SY N PEDESTRIAN, 0102104 61 $18.20 $1,835,596.65 100,859.000 ED N TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/statewide/pdf/historical-item-averages-statewide-6-months.pdf?sfvrsn=47aefe18_17

2027FDM945ArchPlans

storage or housing equipment (generators, lawn maintenance, etc.) or other similar uses. o “Building, A tender house on a moveable bridge -- this is part of the bridge structure. o Water or wastewater

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdm945archplans.pdf?sfvrsn=1d143a72_3

2027FDM111FinalEngDsn

(3) Structural (bridge) design (4) Structural (roadway) design (5) Roadway design including access, Location Hydraulics Report LocationHydraulicsReport Bridge Hydraulics Report, Maintenance Plan LandscapeMaintenancePlan Landscape Maintenance Cost Estimate, Document Type Document File Name STRUCTURES Structures Docs Bridge Structure Design Calculations BridgeStructureDesignCalculations Temporary Detour Bridge Calculations TempDetourBridgeCalculations

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdm111finalengdsn.pdf?sfvrsn=2e37ffde_9

pmg-pdf-v147c217041-a4d0-4e7a-918c-8de2c63dcded

& Maintenance of the PMG The PMG is managed by the Production Support Office’s Project Management, Development and Environment (PD&E), Design, Right of Way, Construction or Maintenance. The PM, , construction and maintenance services.  Process appropriate changes in the contract amount, future ownership and maintenance responsibility. The PM needs to coordinate with Work Program, agency and it should address future ownership and maintenance responsibility. The PM needs

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/project-management/pmg/pmg-pdf-v147c217041-a4d0-4e7a-918c-8de2c63dcded.pdf?sfvrsn=3b7021d2_2

2027FDMPart2DesignCriteria

Designs for highway and bridge projects are based on established design controls for the various, 201.1 General Designs for highway and bridge projects are based on established design controls, on Design Speed. Two examples of sudden change in cross section are where a narrow bridge exists, , slopes, and guardrail applications • Bridge width and roadway shoulders • Pavement crown, cross slope

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdmpart2designcriteria.pdf?sfvrsn=a68bb3f6_2

2027FDM262RetWalls

than 5 feet in height, provide a 10-ft maintenance area (1:10 or flatter) in front of the wall face with suitable access for maintenance vehicles. See SDG Chapter 3 for information regarding partial, ) Bridge Development Report (BDR) / 30% Plans: The BDR must discuss and justify the use/non-use of non, % Plans/Phase II Roadway Submittal: For bridge projects requiring project-specific details, . On bridge projects, discuss the use of and the selected type of temporary walls in the BDR. On roadway

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdm262retwalls.pdf?sfvrsn=d614070e_7

441636-2_SR714_Monterey_at_FEC_whitepaper_2025_01-ADA

and bridge structure over FEC Railroad and CR A1A. In order to allow construction and maintenance, earth (MSE) walls with a bridge structure over the FEC Railroad. In order to allow construction and maintenance of the MSE wall along the westside of CR A1A, without encroachment onto FEC property, ) and the new ramps would be elevated using MSE walls and bridge structures over FEC Railroad and CR A1A. In order to allow construction and maintenance of the MSE wall along the westside of CR A1A

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/montereyrd-fec-study-documents/10_26_2026/441636-2_sr714_monterey_at_fec_whitepaper_2025_01-ada.pdf?sfvrsn=18c6fd71_1

SPI-536-001

to Rigid Barrier, Index 536-001 applies only to newly constructed bridge Traffic Railings and Concrete, in this Index can be installed without conflicting with existing Traffic Railings, structures, or bridge approach slabs. For guardrail systems connecting to existing bridge Traffic Railings that conflict, reduced barrier system length and maintenance cost advantages. See Index 544-001 for additional Crash, Connections to Rigid Barrier (Approach or Trailing). For connections to existing bridge Traffic Railings

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2028/spi/spi-536-001.pdf?sfvrsn=8fe5c3f3_1

2027FDM265ReinfConcBox

Bridge Inspection Standards classify the following culverts as bridge- sized (a.k.a., bridge culverts, 265.1.1 provides an illustration of a single-span and a multi-span bridge culvert. Topic #625-000-002, Figure 265.1.1 Examples of Bridge Culverts Topic #625-000-002 FDOT Design Manual January 1, 2027 265, frame or arch, and a short- span bridge. While site conditions are the primary deciding factor, “beam” (top slab) depth (3) Maintenance and protection of traffic requirements (e.g., phase

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdm265reinfconcbox.pdf?sfvrsn=d4d8ff1f_4

2027 TEM Chapter 2 - Signs

) requests that the District Maintenance Engineer install SLIPPERY WHEN WET signs ( W8-5 ). Pavement, 25. DTOE also requests that the District Maintenance Engineer install SLIPPERY WHEN WET signs, SLIPPERY WHEN WET Signs 2.1-2 Ramp and Bridge Decks: Interchange exit or entrance ramps on sharp, this condition exists. Figure 2.1-1. Motorcycle Plaque 2.1.5 NOTIFICATION The District Maintenance, installed. The DTOE will direct the District Maintenance Engineer to remove SLIPPERY WHEN WET

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/trafficservices/studies/tem/tem-2027/2027-tem-chapter-2---signs.pdf?sfvrsn=96bd3ec6_1
20 of 231 results
Top