;

231 search results for bridge maintenance

2027FDM222Peds

sidewalk across bridge structures when sidewalk is provided on the approach roadway. Also provide, clearance over the entire walking surface. For pedestrian bridge vertical clearance requirements over facilities (e.g., roadways, railways, etc.) see FDM 260.6. For enclosed pedestrian bridge fencing, 222.2.1 Pedestrian Bridge Enclosed Fencing Envelope 222.2.1.3 Grades and Cross Slope When a sidewalk, is typically used in C2T, C3, C4, C5, and C6 context classifications, and at locations attaching to bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdm222peds.pdf?sfvrsn=8398dfe7_5

TP-12-08-26BSN

AND MAINTENANCE PROGRAMS Florida Turnpike Headquarters FL Turnpike MP 263, Building 5315 Ocoee, FL 34761, projects over $250,000.00 as established by the Department’s budget. Maintenance contracts do, description and specifications. If deemed necessary by the Department, certain maintenance contracts will contain specific requirements for maintenance contractor eligibility. Bid Solicitation Notice Page, of the Standard Specifications for Road and Bridge Construction, or as amended by the project Specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2026/dec08/tp-12-08-26bsn.pdf?sfvrsn=a01b204a_1

E1Y94-R0

 Florida Department of Transportation Bid Solicitation Notice and Approximate Quantities Letting: 01261203 Call Order: 004 Proposal: E1Y94-R0 District:01 Counties: DIST/ST-WIDE, POLK Road Name: BARTOW OPERATIONS MAINTENANCE CONTRACTS - ROUTINE MAINTENANCE Limits: Midpoint Project(s): 43272727292(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge, of Stormwater Pond Maintenance. The award amount and contract bond shall be based on the Departments Budget

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2026/dec03/e1y94-r0.pdf?sfvrsn=35e8d7c0_1

320-designprojectmanagement-process

to fund them in whole or in part and also usually written maintenance agreements. The Design Project, of drainage details and design approaches to the maintenance of traffic. Coordination with all potential, and Bridge Construction. The rule of thumb is that the most project- specific documents take precedence over

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/project-management/pmg/320-designprojectmanagement-process.pdf?sfvrsn=76d95885_2

2027FDM261StrSupSignsLumSigs

foundations) and the review of the shop drawings. Details for supports attached to bridge structures must be coordinated with the bridge structural engineer and included in the plans. See Structures Design, is to provide the funding for the additional construction cost and be responsible for maintenance costs, And Traffic Signals (LRFDLTS-1), and Structures Manual Volume 3, for limitations on the use of bridge, Cantilever Ground Mounted Sign • Index 700-012 Single Post Bridge-Mounted Sign Support • Index 700-013

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdm261strsupsignslumsigs.pdf?sfvrsn=519e33bf_5

TP-01-12-27BSN

AND MAINTENANCE PROGRAMS Florida Turnpike Headquarters FL Turnpike MP 263, Building 5315 Ocoee, FL 34761, projects over $250,000.00 as established by the Department’s budget. Maintenance contracts do, description and specifications. If deemed necessary by the Department, certain maintenance contracts will contain specific requirements for maintenance contractor eligibility. Bid Solicitation Notice Page 2, of the Standard Specifications for Road and Bridge Construction, or as amended by the project Specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2027/jan12/tp-01-12-27bsn.pdf?sfvrsn=e599de4d_1

Historical Item Averages Market Area 08

2 $195.00 $195,000.00 1,000.000 DA N MOVABLE BRIDGE- PREVENTATIVE MAINTENANCE & ROUTINE REPAIR, $843.80 $18,557,706.89 21,993.000 DA N MAINTENANCE OF TRAFFIC 0102 2200 13 $31.17 $1,350,461.43, FOR TEMPORARY DRIVEWAY MAINTENANCE 0102 4 1 21 $65.00 $775,290.44 11,927.000 SY N PEDESTRIAN, ED N TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 0102107 1 32 $12.59 $757,662.04 60,187.000 ED N TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 0102112 27 $132.80 $1,489,893.73

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/market-area/pdf/historical-item-averages-market-area-08.pdf?sfvrsn=fc20ed22_16

OOM_20261106_Blanket Authorization Letter_Expires 11.15.2026

on the Permit Office website at https://www.fdot.gov/maintenance/owodpermits.shtm. The hauler is responsible, Pounds MIN. # OF AXLES REQ. MIN. OUTER BRIDGE MIN. FT BETWEEN GROUPINGS MAX. GROSS WEIGHT 1, Road Use Permit Office. Sincerely, Thomas E. Beitelman, PE State Bridge Evaluation Engineer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/maintenance/str/owodp/oom_20261106_blanket-authorization-letter_expires-11-15-2026.pdf?sfvrsn=a81beb42_1

Historical Item Averages Market Area 05

$949.67 $6,229,809.31 6,560.000 DA N MAINTENANCE OF TRAFFIC 0102 2200 5 $9.74 $208,345.65, N TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 0102107 1 12 $21.63 $266,752.40 12,330.000 ED N TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 0102115 15 $.21 $21,896.79, 20.000 LF N BRIDGE APPROACH EXPANSION JOINT FOR CONCRETE PAVEMENT 0400 0 13 1 $2,900.00 $20,880.00, , BRIDGE SUPERSTRUCTURE 0400 2 10 1 $600.00 $599,040.00 998.400 CY N CONCRETE CLASS II, APPROACH SLABS

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/market-area/pdf/historical-item-averages-market-area-05.pdf?sfvrsn=71dccc23_15

2027FDMComplete

) Maintenance of Traffic Requirements (a) ….…………….… Select Status (4) Bridge Hydraulics Report (c, No: 625-000-002 FDOT Design Manual Release The 2027 Design Manual photo features CR 455 Overpass Bridge, to four lanes in each direction. The project replaced bridge structures along the Turnpike Mainline, for the new West Orange Trail bridge to match the existing aesthetics, and accommodation was made, January 1, 2027 102 Glossary of Terms 7 Maintenance Agreement An agreement with a Local Agency

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdmcomplete.pdf?sfvrsn=fd2778e8_8

Historical Item Averages Statewide 12 Months

$112,453,066.45 105,809.000 DA N MAINTENANCE OF TRAFFIC 0102 2142 1 $325,000.00 $325,000.00 1.000 LS Y SPECIAL DETOUR- TEMPORARY BRIDGE, PROJECT 445148-1-52-01 0102 2200 64 $21.56 $22,411,178.88, DETOUR- TEMPORARY BRIDGE 0102 3 31 $59.41 $381,926.15 6,428.900 CY N COMMERCIAL MATERIAL FOR TEMPORARY DRIVEWAY MAINTENANCE 0102 4 1 83 $45.61 $2,316,068.59 50,778.000 SY N PEDESTRIAN OR BICYCLE, 211,898.000 ED N TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 0102107 1 136 $12.96

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/statewide/pdf/historical-item-averages-statewide-12-months.pdf?sfvrsn=32501f5b_16

Historical Item Averages Statewide 12 Months

MAINTENANCE & ROUTINE REPAIR 0465 21 4 $903.84 $1,529,300.00 1,692.000 DA N MOVABLE BRIDGE OPERATOR, 105,809.000 DA N MAINTENANCE OF TRAFFIC 0102 2142 1 $325,000.00 $325,000.00 1.000 LS Y SPECIAL DETOUR- TEMPORARY BRIDGE, PROJECT 445148-1-52-01 0102 2200 64 $21.56 $22,411,178.88 1,039,333.000 SY N, - TEMPORARY BRIDGE 0102 3 31 $59.41 $381,926.15 6,428.900 CY N COMMERCIAL MATERIAL FOR TEMPORARY DRIVEWAY MAINTENANCE 0102 4 1 83 $45.61 $2,316,068.59 50,778.000 SY N PEDESTRIAN OR BICYCLE SPECIAL

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/statewide/excel/historical-item-averages-statewide-12-months.xlsx?sfvrsn=7653cef1_18

designsheforms-v- 2026-01-1

31T. Toll Facility Development 10. Bridge Development Report NOISE BARRIERS 11. Temporary Bridge Noise Guidelines 12. Short Span Concrete Bridge 32. Noise Barriers Impact Design Assessment in the Design Phase 13. Medium Span Concrete Bridge INTELLIGENT TRANSPORTATION SYSTEMS (ITS) 14. Structural Steel Bridge ITS Guidelines 15. Segmental Concrete Bridge 33. ITS Analysis 16. Movable Span 34, & firm Enter name & office 10. Structures - Bridge Development Report Enter name & firm Enter

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/project-management/scope/designsheforms-v--2026-01-1.xlsx?sfvrsn=7d4fb43b_2

TP-11-17-26BSN

AND MAINTENANCE PROGRAMS Florida Turnpike Headquarters FL Turnpike MP 263, Building 5315 Ocoee, FL 34761, projects over $250,000.00 as established by the Department’s budget. Maintenance contracts do, description and specifications. If deemed necessary by the Department, certain maintenance contracts will contain specific requirements for maintenance contractor eligibility. Bid Solicitation Notice Page 2, of the Standard Specifications for Road and Bridge Construction, or as amended by the project Specifications

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2026/nov17/tp-11-17-26bsn.pdf?sfvrsn=3bfb0bf7_2

D5-12-01-26BSN

AND MAINTENANCE PROGRAMS Procurement Services, MS 4-524 719 S. Woodland Blvd, DeLand, FL 32720 Deland, projects over $250,000.00 as established by the Department’s budget. Maintenance contracts do, description and specifications. If deemed necessary by the Department, certain maintenance contracts will contain specific requirements for maintenance contractor eligibility. Bid Solicitation Notice Page 2, After consideration in accordance with Article 3-1 of the Standard Specifications for Road and Bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2026/dec01/d5-12-01-26bsn.pdf?sfvrsn=a14e93a2_1

2027FDM233ITS

to bridge traffic railings, concrete median barrier walls, concrete shoulder barrier walls, for continued operations and maintenance. (2) Value engineering for installation and maintenance, (Topic No. 750-040-003). 233.2.2 Maintenance Considerations Consider the following for maintenance access: • Provide a minimum 4-ft clear area around the ITS pole for maintenance of the camera, and topographic features that affect sunlight or wind exposure, size of site, and protection from maintenance

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdm233its.pdf?sfvrsn=9f090a7d_6

E1Y50

 Florida Department of Transportation Bid Solicitation Notice and Approximate Quantities Letting: 01261203 Call Order: 001 Proposal: E1Y50 District:01 Counties: CHARLOTTE Road Name: SR 31 FROM N OF CR 74 TO DESOTO COUNTY LINE Limits: 01030000 Project(s): 45110315201(*) Federal Aid No: N/A Total Roadway Length: 5.965 Miles Contract Days: 130 Total Bridge Length: 0.000 Miles Letting Date, Roadway 0101- 1- MOBILIZATION (45110315201) LS 1.000 0102- 1- MAINTENANCE OF TRAFFIC (45110315201) LS

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2026/dec03/e1y50.pdf?sfvrsn=575fb828_1

2027FDM915PlanProfile

the project limits. Transitions for maintenance of traffic and other construction work, construction, resurfacing, bridge work, widening, and milling). Use shading, patterning, or labeling, and Bridge Culverts Bridge-sized culverts (a.k.a., bridge culverts) are defined in FDM 265.1. Flag and station the begin station and end station for bridge culverts (outside wall to outside wall). Provide a bridge number and a drainage structure number for all bridge culverts. Topic #625-000-002

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdm915planprofile.pdf?sfvrsn=2f9d80c7_4

Drainage

of Florida's environment. For maintenance and local inquiries, please see the Statewide Maintenance Contacts or District Drainage Information pages. For the Drainage Connection Permit, Statewide Maintenance Contact District Drainage Staff Directory Central Office, for these practice areas: - Prediction of bridge hydraulics and scour for riverine and tidal waterways - Design of bank protection and bridge scour countermeasures

https://www.fdot.gov/roadway/drainage/default.shtm

Historical Item Averages Market Area 04

$695.15 $3,760,779.50 5,410.000 DA N MAINTENANCE OF TRAFFIC 0102 2142 1 $325,000.00 $325,000.00 1.000 LS Y SPECIAL DETOUR- TEMPORARY BRIDGE, PROJECT 445148-1-52-01 0102 2200 4 $23.63 $409,912.11, 6,340.000 ED N TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 0102107 1 7 $9.72 $61,620.80 6,340.000 ED N TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 0102115 11 $.29 $7,857.97, , BRIDGE SUBSTRUCTURE 0400 4 8 1 $1,650.00 $11,880.00 7.200 CY N CONC CLASS IV, BULKHEAD 0400 4 47

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/market-area/pdf/historical-item-averages-market-area-04.pdf?sfvrsn=aed33433_15
20 of 231 results
Top