1780 search results for bridge inspection

BCR_South_EA_07-17-2024

storage tracks via several ladder tracks north of westbound Terminal Drive bridge to offset, mainline tracks relocated to the outside. The station work and existing bridge piers will require, leading from the bus stop to the vertical circulation/pedestrian bridge to access the platform, goals and safety inspections. BCR South track work construction will require coordination with FEC

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/projects_browardcommuterrail/bcr_south_ea_07-17-2024.pdf?sfvrsn=d94477b_1

433256 FINAL AS_BUILT ROADWAY PLANS (1)

PROJECT LOCATION STA. 83+87.15 RT. STA. 83+34.38 LT. BEGIN BRIDGE #130075 & #130076 STA. 84+62.11, LT. END BRIDGE #130075 & #130076 TO PARRISH TO PARRISH TO SARASOTA TO BRADENTON TO PALMETTO, NAPLES KEY WEST CITY LAKE LENGTH OF PROJECT BRIDGE LENGTH IS BASED ON NORTHBOUND BRIDGE ROADWAY, at the following web site: For the Standard Specifications for Road and Bridge Construction GOVERNING STANDARDS, /specificationsoffice/ F L O R I D A ' S Contract Documents. Specifications for Road and Bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25120/433256-final-as_built-roadway-plans-(1).pdf?sfvrsn=166697cd_1

D5080000.DO

sufficient conductors for the actual needs of this bridge, and certification that cables to be furnished, , enclosure designed to be lifted as a unit from the unit for inspection. Include provisions to access, of the unit is such as to give sufficient light for the operation of the bridge, without glare, : F u r n i s h a n d i n s t a l l b r i d g e s u b marine cable assembly and bridge submarine, bridge submarine cables. Provide necessary clamps to secure bridge submarine cables to pier wall

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2003/january-2003/workbook/d5080000.do.pdf?sfvrsn=da8db018_0

D4520000.do

105. 452-3 Definitions. Thefollowingdefinitionsapply to segmental bridge construction: 452-3.1, that has to be followed in the casting cell or bed for achieving the theoretical bridge profile, taken place. The casting curve is a combination of the theoretical bridge geometrical profile grade, casting curves on a continuous layout of an entire unit of the bridge between expansion joints, of erection of the unit in the bridge between expansion joints

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2004/january-2004/workbook/d4520000.do571f5ddb0a18491d97d08dcbf65fb0f9.pdf?sfvrsn=6ee1eeb7_0

44653515201-PLANS-04-LIGHTING

 GOVERNING STANDARD SPECIFICATIONS: http://www.fdot.gov/programmanagement/Implemented/SpecBooks for Road and Bridge Construction at the following website: Florida Department of Transportation, are available at the Bridge Construction and applicable Interim Revisions (IRs). Florida, : EXCEPTIONS: BRIDGE LIMITS: RAILROAD CROSSING: ON ANY ELECTRONIC COPIES. AND THE SIGNATURE MUST, INSPECTION SHOP DRAWING SUBMITTAL DATA SHALL INCLUDE A COMPUTER PRINTOUT SHOWING HORIZONTAL AND VERTICAL

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26106/44653515201-plans-04-lighting.pdf?sfvrsn=69a9d84a_1

44728715201-PLANS-03-SIGNALIZATION

/Implemented/SpecBooks for Road and Bridge Construction at the following website: Florida, are available at the Bridge Construction and applicable Interim Revisions (IRs). Florida, PROJECT LIMITS: EXCEPTIONS: BRIDGE LIMITS: RAILROAD CROSSING: SIGNALIZATION SIGNING AND PAVEMENT, TRAFFIC SIGNALS COORDINATOR FOR INSPECTION AND ACCEPTANCE OF THE NEW TRAFFIC 5. TYPE OF WORK

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26111/44728715201-plans-03-signalization.pdf?sfvrsn=f3f4c772_1

7-17workbookredlinewithman01-02-03-04

DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS for ROAD and BRIDGE CONSTRUCTION JANUARY JULY 2017, PROVISIONS SP0000001 USAGE NOTE REMARKS INSPECTION. (REV 2-10-94) (1-177-17) Changes to: 5-9.1. SP0050901 Long bridge jobs (1500 feet or longer); modify to suit CONTROL OF MATERIALS. (REV, BRIDGE CONSTRUCTION. (REV 8-30-16) (FA 10-25-16) (7- 17) Changes to 452. SS4520200 All Jobs

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/workbook/7-17workbookredlinewithman01-02-03-04add596c440f84241b43de2dfda4302e2.pdf?sfvrsn=87da3bfe_4

Project Development Engineering Report

Separation Bridge Analysis L. Flood Insurance Rate Maps M. USEPA Biscayne Aquifer Letter E x e c u, that supplement the Standard Specifications for Road and Bridge Construction. • The FDOT, for Road and Bridge Construction. • FDOT will continue to coordinate with all adjacent projects, bridge is recommended to be a combined pedestrian and vehicular bridge. The segment between the two

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/project-sr710-documents/project-development-engineering-report.pdf?sfvrsn=8e25c5c8_1

Historical Item Averages Market Area 12

29 $10,294.86 $360,320.27 35.000 EA N MONITOR EXISTING STRUCTURES- INSPECTION AND SETTLEMENT, ) 0400 2 4 5 $1,486.70 $9,100,828.16 6,121.500 CY N CONC CLASS II, BRIDGE SUPERSTRUCTURE 0400 2 5 1 $1,500.00 $718,500.00 479.000 CY N CONCRETE CLASS II, BRIDGE SUBSTRUCTURE 0400 2 10 6 $932.49, II, MASS, BRIDGE SUBSTRUCTURE 0400 4 1 2 $2,156.76 $26,152,440.00 12,125.800 CY N CONCRETE CLASS, 5 6 $2,037.39 $4,451,700.00 2,185.000 CY N CONCRETE CLASS IV, BRIDGE SUBSTRUCTURE 0400 4 6 1

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/estimates/reports/historical-item-average-costs-reports/moving/market-area/pdf/historical-item-averages-market-area-12.pdf?sfvrsn=2cade1d3_19

MethodologyforLinkingGreenwaysandTrailswithPublicTransitinFlorida

and Upper Tampa Bay Trail at W. Waters Avenue Bridge ................................................................ 84 Figure 36: Hillsborough Scenario 3, W. Waters Avenue Bridge over Flood Control, Trail at Gooden Crossing Road, and PSTA Route 59 at the Ulmerton Road bridge over Pinellas Trail, the Pinellas Trail bridge at Ulmerton Road

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/transit/transit-planning-resources/methodologyforlinkinggreenwaysandtrailswithpublictransitinflorida_790e1a4d-4e7a-4522-98cd-ceffe757e3f6.pdf?sfvrsn=e422973e_2

E21G0-R0BidTabs

of the contract letting. The Vehicular Impact Attenuator inspections and cleaning will occur every, END ANCHORAGE ASSEM (REPLACE) (BRIDGE) 3.000 EA 1,000.00000 3,000.00 0.01000 0.03 4,900.00000, BEAM) 1.000 EA 0.01000 0.01 0.01000 0.01 1.00000 1.00 0285 E536306501 END ANCHOR ASSEM BRIDGE, END ANCHOR ASSEM BRIDGE (REPL ANCHOR PANEL SECT) 3.000 EA 0.01000 0.03 200.00000 600.00, END ANCHORAGE ASSEM (REPLACE) (BRIDGE) 3.000 EA 3,500.00000 10,500.00 0065 E536 6 48 END

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/bid-tabs/2024/mar13/e21g0-r0bidtabs.pdf?sfvrsn=fcea30a7_1

4550103.FHWA

of inspection by the divers, the Department may also elect to inspect the work before authorizing, by the divers to the Engineer indicating the results of their underwater inspection before, and compaction of fill. 14. P r o v i d e t h e make a n d model of the shaft inspection device, if applicable, equipment capable of constructing shafts supporting non-bridge structures, including sign, signal, soils or rock. Correct any deficiencies found by the divers. Upon completion of inspection

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/fhwa/4550103.fhwa.pdf?sfvrsn=99381d44_0

4550103.FHWA2

deficiencies found by the divers. Upon completion of inspection by the divers, the Department may also, the results of their underwater inspection before requesting authorization to place the seal concrete, and compaction of fill. 14. Provide the make and model of the shaft inspection device, . Provide equipment capable of constructing shafts supporting non-bridge structures, including sign, deficiencies found by the divers. Upon completion of inspection by the divers, the Department may

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/fhwa/4550103.fhwa2.pdf?sfvrsn=10e43641_0

Pt2Ch17-073124_clean

, stormwater from a bridge over a river that would flow into a nearby estuary). These comments should, adverse effects. A detailed assessment should include the results of on-site inspections, the views

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/pdeman/2024/pt2ch17-073124_clean.pdf?sfvrsn=e9b75cb4_1

flexiblehandbook

Not New Pavement (A) NOT NP Bridge Number BR #### Rigid Pavement (A) Rigid Pavt No Ride (A) NR, of cracking compared to traditional visual inspections. The LCMS system collects forward and 20-foot

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/administration/resources/library/publications/researchreports/pavement/flexiblehandbook.pdf?sfvrsn=a2d316f4_1

EEO Officer List - 03_05_2025

ALLIED ENGINEERING & PAULA MCQUEEN 2007/10/09 2398720292 . . TESTING INC ALLIED INSPECTION, BRIDGE COMPANY JOSHUA ROBERTSON 2012/08/03 4126311000 4126312000 JROBERTSON@AMERICANBRIDGE.NET, JENNY@AMERICANIMPACTWINDOWSYSTEMS.C AND DOORS, LLC OM AMERICAN IN LINE INSPECTION ROBIN VALLANCE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/equalopporunity/contract-compliance/eeo-officer-list---03_05_2025.pdf?sfvrsn=b23cbb1_1

EEO Officer Listing - 03_20_2025

ALLIED INSPECTION SERVICES ROBERT MCQUEEN 2005/05/17 9416370481 9415750444 . ALLIED RECYCLING INC, 2396931667 . TRENCHING INC AMERICAN BRIDGE COMPANY JOSHUA ROBERTSON 2012/08/03 4126311000 4126312000, IN LINE INSPECTION ROBIN VALLANCE 2012/06/26 3864095446 3869574919 americaninline@cfl.rr.com SERVICE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/equalopporunity/contract-compliance/eeo-officer-listing---03_20_2025.pdf?sfvrsn=6acbea83_1

EEO Officer Listing - 03_20_2025

ALLIED INSPECTION SERVICES ROBERT MCQUEEN 2005/05/17 9416370481 9415750444 . ALLIED RECYCLING INC, 2396931667 . TRENCHING INC AMERICAN BRIDGE COMPANY JOSHUA ROBERTSON 2012/08/03 4126311000 4126312000, IN LINE INSPECTION ROBIN VALLANCE 2012/06/26 3864095446 3869574919 americaninline@cfl.rr.com SERVICE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/equalopporunity/contract-compliance/eeo-officer-listing---03_20_20254683f8e2-7313-44d7-a24e-34c674888b35.pdf?sfvrsn=1aa1a1da_1

EEO OFFICER LIST 04 21 2025

ALLIED INSPECTION SERVICES ROBERT MCQUEEN 2005/05/17 9416370481 9415750444 . ALLIED RECYCLING INC TODD, 2396931667 . TRENCHING INC AMERICAN BRIDGE COMPANY JOSHUA ROBERTSON 2012/08/03 4126311000 4126312000, INSPECTION ROBIN VALLANCE 2012/06/26 3864095446 3869574919 americaninline@cfl.rr.com SERVICE INC

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/equalopporunity/contract-compliance/eeo-officer-listings/eeo-officer-list-04-21-2025.pdf?sfvrsn=c79b0963_1
20 of 1780 results