3724 search results for fla

3470000.FHWA

spalling or flaking off of the surface layer that exposes the rough, pitted aggregate surface in excess, in width or 1/4 inch in vertical displacement. Any spalling or flaking off of the surface layer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/review/fhwa/3470000.fhwa.pdf?sfvrsn=8f58004_0

2024 BOE Manual

) correlates to the Spec Type flags in the BOE, allowing for easy identification of items that may require, online through DQE. This report also includes valid (effective/obsolete) dates. A Spec flag is assigned, , Developmentals, Trial Items 1000s Utilities 2.8.3 Specification Flags on Pay Items Several letters or “flags” are used on the Master Pay Item list to indicate when a pay item is non-standard. The Spec-Type flags in the BOE are indications of the level of pay item support that were likely

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/estimates/publications/basis-of-estimates-manual/2024-boe-manual.pdf?sfvrsn=a5e4a0f0_1

2025 BOE Manual

with a character. That character (letter) correlates to the Spec Type flags in the BOE, allowing, (effective/obsolete) dates. A Spec flag is assigned to all pay items for non-standard work. See, , Developmentals, Trial Items 1000s Utilities 2.9.3 Specification Flags on Pay Items Several letters

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/estimates/publications/basis-of-estimates-manual/2025-boe-manual.pdf?sfvrsn=bbdfee82_1

1020300.impl

Flagger Assistance Devices (AFAD) must be signed and sealed by a Professional Engineer registered, a removable polymer striping tape or a molded engineered polymer material. 102-9.19 Automated Flagger, and out of the lane of traffic. The devices may be operated either by a single flagger at one end of the traffic control zone, from a central location, or by a separate flagger near each device’s, . AFADswillnotbepaidforseparately.AFADsmay be used as a supplement or an alternate to flaggers in accordance with Index 603. Include

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/implemented/1020300.impl.pdf?sfvrsn=e3f10f44_0

515-022

of the Contractor. * Use of either Type 1 or Type 2 Insert 2Ɓ" X ƈ" X 1'-0" Flat Bar. * Insert Bar (Type 2, flanges) Bar (Option 1) (web & Rail Splice/Expansion Rail Splice/Expansion Bar (web & inside flanges

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/idx/515-022.pdf?sfvrsn=b2d11a75_1

515-022

of the Contractor. * Use of either Type 1 or Type 2 Insert 2Ɓ" X ƈ" X 1'-0" Flat Bar. * Insert Bar, inside flanges) Bar (Option 1) (web & Rail Splice/Expansion Rail Splice/Expansion Bar (web & inside flanges) Rail Splice/Expansion Bar (Option 1) Splice/Expansion Bar Mitered Rail Rail Splice

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/515-022.pdf?sfvrsn=9c8298ad_1

CHAPTER 2

to change): • Bridge Investment Program (local roads) • Federal Lands Access Program (FLAP) • Ferry, District 4 District 5 District 6 District 7 Charlotte Baker Bay Indian River Flagler Monroe Citrus, Flagler Glades Bradford Franklin Sumter Hardee Columbia Gadsden Hendry Dixie Gulf Highlands

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/lap/manual/chapter-2.pdf?sfvrsn=e0bdf070_3

CH 2_redline_2025-02

Program (local roads) • Federal Lands Access Program (FLAP) • Ferry Boat and Ferry Terminal, District 5 District 6 District 7 Charlotte Baker Bay Indian River Flagler Monroe Citrus DeSoto, 3 District 5 DeSoto Baker Calhoun Flagler Glades Bradford Franklin Sumter Hardee Columbia

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/lap/manual/review/fy-2024-25/ch-2_redline_2025-02.pdf?sfvrsn=49d822b3_1

Design Standards 2002 Interim

to include curb ramp detectable warning. See flag on drawing for implementation information.Revised, or at the contractor's option whenever the plans call for the flared end anchorage option. This Interim

https://www.fdot.gov/roadway/ds/02/istds.shtm

D1-11-02-23BSN

- 6-423 GUARDRAIL END TREATMENT-FLARED APPROACH TERMINAL, REPLACE, NCHRP 350 EA 5.000 E536- 6-424 END ANCHORAGE ASSEM (REPLACE) (PARALLEL) EA 7.000 E536- 6-425 GUARDRAIL END TREATMENT-FLARED APPROACH, E536- 15- MISCELLANEOUS GUARDRAIL MAINTENANCE LF 1,500.000 E536-322-501 END ANCHOR ASSEM FLARED (REPL FLARED END SECT) EA 10.000 E536-322-502 END ANCHOR ASSEM FLARED (REPL ROUND END SECT) EA 10.000 E536-322-503 END ANCHOR ASSEM FLARED (REPL BUFFER END SECT) EA 10.000 E536-322-506 END ANCHOR ASSEM

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2023/nov02/d1-11-02-23bsn.pdf?sfvrsn=c4a15dfa_1

E1X48-R0BidTabs

ASSEM FLARED (REPL FLARED END SECT) 2.000 EA 60.00000 120.00 40.00000 80.00 0.01000 0.02 0235 E536322502 END ANCHOR ASSEM FLARED (REPL ROUND END SECT) 2.000 EA 100.00000 200.00 100.00000 200.00 500.00000 1,000.00 0240 E536322503 END ANCHOR ASSEM FLARED (REPL BUFFER END SECT) 2.000 EA 200.00000 400.00 200.00000 400.00 500.00000 1,000.00 0245 E536322506 END ANCHOR ASSEM FLARED, END ANCHOR ASSEM FLARED (REPL FLARED END SECT) 2.000 EA 125.00000 250.00 200.00000 400.00

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/bidtabs/2024/nov07/e1x48-r0bidtabs.pdf?sfvrsn=32256431_10

659-020

Junction Box And Dome Flange Camera Mounting Bracket Assembly Lower Contact Camera (TYP) Dome, And Flange Connection The Contractor Shall Coordinate Assembly (TYP) Dome Type Camera Fitting

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/idx/659-020.pdf?sfvrsn=dc5aac7c_1

44893815201-MultiPostSignReport

⎡ ⎢ ⎢ ⎢ ⎢ ⎢ ⎢ ⎢ ⎢ ⎣ ⎤ ⎥ ⎥ ⎥ ⎥ ⎥ ⎥ ⎥ ⎥ ⎦ Wt_per_Length_(lbf/ft) Overall_Width_(in)_ Flange_Width_(in)_ Flange_Thickness_(in)_ A_(in3) S_(in3) Z_(in3) Iy_(in4, ⎡ ⎢ ⎢ ⎢ ⎢ ⎢ ⎢ ⎢ ⎢ ⎢ ⎢ ⎢ ⎢ ⎢ ⎣ ⎤ ⎥ ⎥ ⎥ ⎥ ⎥ ⎥ ⎥ ⎥ ⎥ ⎥ ⎥ ⎥ ⎥ ⎦ Wt_per_Length_(lbf/ft) Flange_Width_(in) Flange_Thickness_(in) d_(in) Web_Thickness_(in) A_(in3) S_(in3) r_(in) I_(in4) Iy, ⎡ ⎢ ⎢ ⎢ ⎢ ⎢ ⎢ ⎢ ⎢ ⎣ ⎤ ⎥ ⎥ ⎥ ⎥ ⎥ ⎥ ⎥ ⎥ ⎦ Wt_per_Length_(lbf/ft) Overall_Width_(in)_ Flange

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25131/44893815201-multipostsignreport.pdf?sfvrsn=2108ee17_1

659-020

Junction Box And Dome Flange Camera Mounting Bracket Assembly Lower Contact Camera (TYP) Dome, And Flange Connection The Contractor Shall Coordinate Assembly (TYP) Dome Type Camera Fitting

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/659-020.pdf?sfvrsn=86491fa_1

4500301-724origind

flange dormant strands may be released after the concrete reaches a compressive strength of 2,000 psi, in the bearing areas and edges of the top flange, a minor spall is defined as a spall not larger than 2.0, . Spalls located at the edges of the top flange are considered minor spalls as follows: 1. A spall on one edge of the top flange, without a coincident spall on the other edge of the top flange, are not greater than 25% of the width of the top flange. 2. Coincident spalls on opposite edges

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/internal/4500301-724origind.pdf?sfvrsn=e28aa5db_1

D4600000.do

. Fieldinstallallshearconnectorswhicharelocatedonthetopflangeofsteelgirdersand beams after the deck forms are in place. Do not install top flange, d.Within6inches[150 mm] of bearing stiffeners in the top flange areas at end of girder. (2) D i a p h r

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2004/january-2004/workbook/d4600000.do.pdf?sfvrsn=9ef57e46_0

SP1020301WDorigind

and flagging operations and maintenance of all temporary traffic control devices are ready for work, and flagging operations and maintenance of devices are ready to begin. Travel time to and from

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/maintenance/review-package/sp1020301wdorigind.pdf?sfvrsn=6e0bd4e2_4

0071100.impl

or adjacent to railroad company right-of-way. 7-11.4.3 Watchman or Flagging Services: The railroad company will furnish protective services (i.e., watchman or flagging services) to ensure the safety

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/implemented/0071100.impl.pdf?sfvrsn=3016013d_0
20 of 3724 results