2891 search results for mot
SS6900000
/foundation in such a manner as not to result in a safety hazard to motorists or adjacent property, to motorists, pedestrians or adjacent property or damage to existing utilities. Ensure that all utilities
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/ss6900000.pdf?sfvrsn=4f271589_0SS6900000
/foundation in such a manner as not to result in a safety hazard to motorists or adjacent property, to motorists, pedestrians or adjacent property or damage to existing utilities. Ensure that all utilities
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2012/january-2012/workbook/ss6900000.pdf?sfvrsn=bd6dc329_0FDOT's Wrong-Way Driving (WWD) Program
wrong-way drivers, sending notifications to alert other motorists and notifying law enforcement, and increase motorists’ understanding of engineering solutions and best practices that can reduce
https://www.fdot.gov/traffic/teo-divisions.shtm/cmt/Wrong-Way-drivingE6P03BidTabs
12,750.00 600.00000 9,000.00 950.00000 14,250.00 0040 E102100 MOT MAINTENANCE SERVICES 90.000 HR, (TEMPORARY) 15.000 ED 1,750.00000 26,250.00 0040 E102100 MOT MAINTENANCE SERVICES 90.000 HR 190.00000
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/bid-tabs/2023/oct26/e6p03bidtabs.pdf?sfvrsn=e29fc4b9_1D4 ACEC FL Liaison Committee Meeting Summary Notes 1-26-2024
benefits, for pavement rehabilitation needs. • MOT training modules are being completed. ACEC has been reviewing. - When complete will be used to certify individuals’ ability to prepare MOT plans
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd4/documents/d4-acec-fl-liaison-committee-meeting-summary-notes-1-26-2024.pdf?sfvrsn=b8dd6ef8_1E3X85-R0
required to achieve this work include Maintenance of Traffic (MOT), adjusting utility features (e.g., , DITCH LINING TN 65.000 0530- 74- BEDDING STONE TN 50.000 E102-100- MOT MAINTENANCE SERVICES HR
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2024/apr11/e3x85-r0.pdf?sfvrsn=634c8d8a_1E21M4-R0BidTabs
1,120.00000 11,200.00 350.00000 3,500.00 1,100.00000 11,000.00 0060 E102100 MOT MAINTENANCE SERVICES, 0060 E102100 MOT MAINTENANCE SERVICES 420.000 HR 75.00000 31,500.00 $99,970.00 Section Totals
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/bid-tabs/2024/mar13/e21m4-r0bidtabs.pdf?sfvrsn=d7b156e5_1Community Awareness Plan (CAP) TEMPLATE - Updated May 2024
of Traffic (MOT) Plan 5 D. Access Impacts 4 Public Involvement 5 A. Identification of Concerned Public, of Traffic [Modify this section based on project specific] A thorough and approved MOT plan
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/designsupport/districts/d4/kbfiles/community-awareness-plan-(cap)-template---updated-may-2024.docx?sfvrsn=76afca6e_1PavementMarking101
Section 710: Painted Pavement Markings Standard-for MOT Durable-for Maintenance use Section 701, in accordance with 102- 5.8 (MOT, LS) Non-conflicting markings removed in accordance with the material
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cadd/downloads/webinars/files/microstation/pavementmarking101_e2428538-493e-42e6-802d-b8cb5ed2ca6f.pdf?sfvrsn=228fba0a_01021000-722FHWA
work zone pavement markings for MOT in construction areas and in close conformity with the lines, Pavement Marking. 102-10.1 Description: Furnish and install work zone pavement markings for MOT
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/fhwa/1021000-722fhwa.pdf?sfvrsn=bc3ade6e_26110203-722origind
and the Contract Documents, and all labor, travel, MOT, programs, training, equipment, and other requirements, and the Contract Documents, and all labor, travel, training, equipment, programs, MOT, and other requirements
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/6110203-722origind.pdf?sfvrsn=a1725013_21020302.comm
: Payment will be included under Lump Sum MOT. (Could this be added to 102-9.4?) Response: 6. 102-11.8, MOT pay item. Response: 102-11.7 describes Method of Measurement and 102-13.7 describes Basis
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/comments-responses/1020302.comm.pdf?sfvrsn=aabf8580_0E8W19BidTabs
Percent Of Low Bid Total Bid Rank Vendor Bid Type Bid Status 1 FLORIDA MOT, CORP $371,800.00, Description Alternate Ext Amount Ext Amount (1) FLORIDA MOT, CORP (2) TURTLE INFRASTRUCTURE, ) FLORIDA MOT, CORP (2) TURTLE INFRASTRUCTURE PARTNERS, LLC (3) ESTEP CONSTRUCTION, INC. Units, Description Alternate Ext Amount Ext Amount (1) FLORIDA MOT, CORP (2) TURTLE INFRASTRUCTURE, Price Ext Amount Unit Price Item Description Alternate Ext Amount Ext Amount (1) FLORIDA MOT
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/bid-tabs/2025/may13/e8w19bidtabs.pdf?sfvrsn=f23aa830_1Chapter5s14Redline
Certification of Quantities - (MOT, Signs, etc.) FDOT Excel Forms Manager Construction Downloads, Item Database NOTE 3 (B)Form 700-050-67/68, MOT – Traffic Stripes and Markings Daily Worksheet
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newhistory/chapter5s14redline.pdf?sfvrsn=3734a131_6E8W28BidTabs
% Responsive Non-Winning Bid 3 FLORIDA MOT, CORP $423,800.00 135.36% Responsive Non-Winning Bid 4, + BUILD, LLC (2) YOROCA ENGINEERING CONTRACTORS, (3) FLORIDA MOT, CORP Units ( ) indicates item, ) ALEXANDER DESIGN + BUILD, LLC (2) YOROCA ENGINEERING CONTRACTORS, (3) FLORIDA MOT, CORP Units, ENGINEERING CONTRACTORS, (3) FLORIDA MOT, CORP Units ( ) indicates item is bid as Lump Sum 0001, ENGINEERING CONTRACTORS, (3) FLORIDA MOT, CORP Units ( ) indicates item is bid as Lump Sum 0001
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/bid-tabs/2025/jun10/e8w28bidtabs.pdf?sfvrsn=e6d9e035_1SS7860000
during periods when the camera is in motion or otherwise not viewing the area designated for vehicle, . Ensurethatthedetection-onlycamera has a minimum 10x motorized optical zoom lens with automatic iris
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2007/january-2007/workbook/ss786000026e5e51e8271403d9f5349436efa54b6.pdf?sfvrsn=58c49f83_0SS7860000
during periods when the camera is in motion or otherwise not viewing the area designated for vehicle, . Ensurethatthedetection-onlycamera has a minimum 10x motorized optical zoom lens with automatic iris
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2007/january-2007/workbook/ss7860000.pdf?sfvrsn=c23d1e59_0SS7860000
is in motion or otherwise not viewing the area designated for vehicle detection shall indicate, a minimum 10x motorized optical zoom lens with automatic iris. Ensure that the lens is capable
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2008/january-2008/workbook/ss7860000.pdf?sfvrsn=a93a92be_0SS7860000
during periods when the camera is in motion or otherwise not viewing the area designated for vehicle, . Ensurethatthedetection-onlycamera has a minimum 10x motorized optical zoom lens with automatic iris. Ensure
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2009/january-2009/workbook/ss7860000c0e85d9b8c934ac1ac8f18532a453ff0.pdf?sfvrsn=984735fe_0SS7860000
requests during periods when the camera is in motion or otherwise not viewing the area designated, . Ensurethatthedetection-onlycamera has a minimum 10x motorized optical zoom lens with automatic iris
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2010/january-2010/workbook/ss7860000.pdf?sfvrsn=ab74db0d_0