666 search results for item average unit cost

2023-2024 1st Quarter SRES Report

- small unit jobs drove the very high bids, with 40 projects under 1,000 CY at a weighted average, costs. However, the range between the average bid price index (calculated from all bids, , topping out at 39% in September - exceeding benchmark input costs for five months in a row. Monthly cost, that input cost increases seen over the summer may have moderated. Figure 3. Average Bid vs. Official, record FY 2023 prices (with weighted average prices about $178/ton). If global stability worsens, upper

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/estimates/reports/strategic-resource-evaluation-study-reports/quarterly/2023-2024-1st-quarter-sres-report.pdf?sfvrsn=b0becd2a_1

Historical Item Averages Market Area 12

Historical Item Averages Market Area 12,  Florida Department of Transportation Item Average Unit Cost From 2024/05/01 to 2025/04/30, of Transportation Item Average Unit Cost From 2024/05/01 to 2025/04/30 Statewide Market Area: 12, of Transportation Item Average Unit Cost From 2024/05/01 to 2025/04/30 Statewide Market Area: 12 Contract, 05/26/2025 Page: 3 Florida Department of Transportation Item Average Unit Cost From 2024/05/01, of Transportation Item Average Unit Cost From 2024/05/01 to 2025/04/30 Statewide Market Area: 12 Contract

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/estimates/reports/historical-item-average-costs-reports/moving/market-area/pdf/historical-item-averages-market-area-12.pdf?sfvrsn=2cade1d3_21

SP0090103LS

for the material in question based on the weighted average unit price in the Six Month Moving Statewide, in question based on the unit prices shown in Table 9-1. Table 9-1 Item Description Unit Unit Prices, from the quantity placed, then multiplying by the unit prices as shown in Table 9-2. Table 9-2 Item, in Table 9-3. Table 9-3 Item Description Unit Unit Prices Payment listed a b o v e f o r P i l i, Description Unit Unit Prices Table 9-4 Item Description Unit Unit Prices 9 - 2 . 2 . 6 A d j u s t m

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/workbook/sp0090103ls.pdf?sfvrsn=4b7c7253_0

3340700-722origind

stated in 334-1.4, then multiplying it by the tonnage-weighted average Gmm of the mixes used for the pay item. The bid price for the asphalt mix will include the cost of the liquid asphalt and the tack coat application as directed in 300-8. There will be no separate payment or unit price adjustment, to be paid for will be the weight of the mixture, in tons. For each pay item, excluding overbuild, the pay, quantity for the pay item. The adjusted plan quantity will be determined by dividing the pay item

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/3340700-722origind.pdf?sfvrsn=256d56b4_2

3371100-722origind

by the tonnage-weighted average Gmm of the mixes used for the pay item. For open graded mixes, the adjusted, by the tonnage-weighted average Gsb of the mixes used for the pay item. The bid price for the asphalt mix, . For each pay item, the pay quantity will be based on the quantity placed on the project, limited to 10510% of the adjusted plan quantity for the pay item. For dense-graded mixes, the adjusted plan quantity will be determined by dividing the pay item’s original plan quantity (including any

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/internal/3371100-722origind.pdf?sfvrsn=c89238d_2

D00900LS.do

in payment for the material in question based on the unit prices shown in Table 9-1. Table 9-1 Item, . Table 9-2 Item Description Unit UnitPrices Therearenopay adjustments for t h i s C o n t r a c, in payment on the unit prices as shown in Table 9-3. Table 9-3 Item Description Unit UnitPrices, prices shown in Table 9-4. Table 9-4 Item Description Unit UnitPrices Therearenopay adjustments, price for the actual cost of the item and the Contractor will retain ownership. ARTICLE 9-3

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2003/january-2003/workbook/d00900ls.do.pdf?sfvrsn=7d4828b0_0

fdot-bdv30-977-36-rpt

savings. Estimates Office - Historical Item Average Costs Design Staff Hours- Production Support, or potential claims). It really depends on the project, but asphalt unit costs are often important, accurate planning, and cost/benefit per project. These data are usually proprietary. Equipment costs, information on costs of repairs or elimination of cost of repairs. 14 Crash reduction factors, implementation or operational costs Similar to the previous cost question, capturing the related benefits

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bdv30-977-36-rpt.pdf?sfvrsn=2632488a_8

SS0090200

final acceptance; also for all other costs incurred under the provisions of Division I. For any item of work contained in the proposal, except as might be specifically provided otherwise in the basis of payment clause for the item, include in the Contract unit price (or lump sum price) for the pay item or items the cost of all labor, equipment, materials, tools and incidentals required for the complete item of work, including all requirements of the Section specifying such item of work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2012/january-2012/workbook/ss0090200.pdf?sfvrsn=96a405_0

2023 Homestead Freight Improvement Plan

6.5 Conceptual Cost Estimates, Site Layouts and Cost Estimates, ......................................................................................................................... 7-25 7.9 Cost Estimates, ............................................................................................ 3-51 Figure 4-1 Annual Average Daily Traffic (AADT), 2019, Truck Parking Concept Cost Estimate

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/rail/publications/d6/2023-homestead-freight-improvement-plan.pdf?sfvrsn=3756ccff_1

2341000.FHWA

. For the calculation of unit price adjustments of bituminous material specified in 9-2.1.1, the average asphalt, 320, 330 and 334. The bid price for the asphalt mix will include the cost of the liquid asphalt, will be made under: Item No. 285- 7- Optional Base - per square yard. 2341000 All Jobs SUPERPAVE, will include the cost of the liquid asphalt binder or the asphalt recycling agent and the tack coat application as directed in 300-8. Payment will be made under: Item No. 285- 7- Optional Base - per

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/fhwa/2341000.fhwa.pdf?sfvrsn=cff99385_0

2023 BOE Manual

. For Summary of Pay Items Report requirements, see FDM 902. Item Average Unit Cost by Item Number, . Item Average Unit Cost by Item Range This Webgate report provides a historical average for a pay, . Cost-Based Estimating: Method of cost estimating which uses material, equipment and labor costs, , 2016 will start fiscal year 2017. Fixed Price Pay Item: A pay item where the unit price is set, or unit bid items that do not responsibly reflect the actual costs (plus reasonable profit, overhead

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/estimates/publications/basis-of-estimates-manual/2023-boe-manual.pdf?sfvrsn=8dd363e4_1

Historical Item Averages Market Area 03

Historical Item Averages Market Area 03,  Florida Department of Transportation Item Average Unit Cost From 2024/05/01 to 2025/04/30, Item Average Unit Cost From 2024/05/01 to 2025/04/30 Statewide Market Area: 03 Contract Type, of Transportation Item Average Unit Cost From 2024/05/01 to 2025/04/30 Statewide Market Area, 05/26/2025 Page: 3 Florida Department of Transportation Item Average Unit Cost From 2024/05/01, of Transportation Item Average Unit Cost From 2024/05/01 to 2025/04/30 Statewide Market Area: 03 Contract Type

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/estimates/reports/historical-item-average-costs-reports/moving/market-area/pdf/historical-item-averages-market-area-03.pdf?sfvrsn=9cc6ed4_17

2024 SRES Final Report

average in FY 2024, supported by increased demand, skilled labor constraints, and other input costs, Department of Transportation (FDOT) Cost Index is calculated by assessing awarded and average bids, ................................................................. 22 Figure 15. FDOT Average Binder Cost, prices are here to stay, driven by higher cement costs despite new kiln capacity and fly ash, and fuel cost declines that traditionally would have lowered earthwork bids. Recruiting

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/estimates/reports/strategic-resource-evaluation-study-reports/final/2024-sres-final-report.pdf?sfvrsn=dd1bb7aa_3

F4006ScopeServices

Item Description Unit Unit Prices 0334-1-12 Superpave Asphalt Conc., Traffic B TN $150.00 cost, based on the weighted average unit price in the Six Month Moving Statewide Averages report. The dates, , or the adjustment defined in Section 334. Table 9-4 Item Description Unit Unit Prices 0334-1-12 Superpave, 33309 This is a Lump Sum Contract with only one pay item listed in the Contract. All references to payment under individual pay item numbers, regardless of where those references are contained

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/fcp/f4006/f4006scopeservices.pdf?sfvrsn=eab670c3_2

fdot-bdv31-977-144-rpt

of Florida, Gainesville, FL, 32611-5706 10. Work Unit No. 11. Contract or Grant No. BDV31 977-144, transit services and reducing labor and operation costs have intrigued many decision-makers, braking, financial sustainability (e.g., high capital cost), and low transit system efficiency (e.g., lane will be costly. 5. Some AV industry pioneers, like BEEP, have accumulated multiple years, Household Income of Lake Nona Region vs Orlando, 2011 to 2019 .......67 Figure 6-8 Monthly Housing Cost

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bdv31-977-144-rpt.pdf?sfvrsn=34118394_3

0090103SLLS.FHWA

will apply a reduction in payment for the material in question based on the weighted average unit, in Table 9-2. Table 9-2 Item Description Unit Unit Price 9-2.2.2 Foundations: Adjustment, prices as shown in Table 9-3. Table 9-3 Item Description Unit Unit Price Payment listed above, on the weighted average unit price in the Six Month Moving Statewide Averages report. The dates, , contact the District Construction Engineer prior to use. Item Description Unit Unit Price 9-2.2.2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/fhwa/0090103slls.fhwa.pdf?sfvrsn=bb0321d6_0

0090103SLLS.FHWA

for the material in question based on the weighted average unit price in the Six Month Moving Statewide, the DCE prior to use. Do not use with SP0090103LS. Table 9-2 Item Description Unit Unit Price 9-2.2.2, adjustments in payment on the unit prices as shown in Table 9-3. Table 9-3 Item Description Unit Unit, will be based on the actual cost of the items being deleted less all costs incurred prior to the date, a reduction in payment for the material in question based on the weighted average unit price

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/fhwa/0090103slls.fhwa.pdf?sfvrsn=19afbc39_0

SP0090103LS

of the average spread rate to the design spread rate, which will then be applied using the unit prices as shown in Table 9-2. Table 9-2 Item Description Unit Unit Prices An average spread rate, per, 9-1 Item Description Unit Unit Prices 9-2.2.2AsphaltDesignThickness/SpreadRate:Theaverage spread, Item Description Unit Unit Prices Payment listed above for Piling and Drilled Shafts includes all work, in Table 9-4. Table 9-4 Item Description Unit Unit Prices Table 9-4 Item Description Unit Unit Prices

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2007/january-2007/workbook/sp0090103ls.pdf?sfvrsn=c367c883_0

Historical Item Averages Market Area 08

Historical Item Averages Market Area 08,  Florida Department of Transportation Item Average Unit Cost From 2024/05/01 to 2025/04/30, , VP, DRUM, OR LCD 05/26/2025 Page: 1 Florida Department of Transportation Item Average Unit Cost, Page: 2 Florida Department of Transportation Item Average Unit Cost From 2024/05/01 to 2025/04/30, TO REMAIN 05/26/2025 Page: 3 Florida Department of Transportation Item Average Unit Cost From, 05/26/2025 Page: 4 Florida Department of Transportation Item Average Unit Cost From 2024/05/01

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/estimates/reports/historical-item-average-costs-reports/moving/market-area/pdf/historical-item-averages-market-area-08.pdf?sfvrsn=1ab3320a_19

SP0090103SLLS

in payment for the material in question based on the weighted average unit price in the Six Month, adjustments in payment on the unit prices as shown in Table 9-2. Table 9-2 Item Description Unit Unit, will base all adjustments in payment on the unit prices as shown in Table 9-3. Table 9-3 Item, will be based on the actual cost of the items being deleted less all costs incurred prior, any item of work in compliance with the Contract requirements; or to plan or authorized dimensions

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2013/january-2013/workbook/sp0090103slls.pdf?sfvrsn=e563b794_0
20 of 666 results