;

231 search results for bridge maintenance

OOM_20261113_Blanket Authorization Letter_Expires 11.22.2026

: A. This letter may be used to cover vehicles exceeding their Inner Bridge limitations. B. Overweight vehicles, on the Permit Office website at https://www.fdot.gov/maintenance/owodpermits.shtm. The hauler is responsible, BRIDGE MIN. FT BETWEEN GROUPINGS MAX. GROSS WEIGHT 1 AXLE GROUP MAX WEIGHT 2 AXLE GROUPMAX, , Thomas E. Beitelman, PE State Bridge Evaluation Engineer Docusign Envelope ID

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/maintenance/cont/am/oom_20261113_blanket-authorization-letter_expires-11-22-2026.pdf?sfvrsn=efd57815_1

2027FDM110InitialEngineering

the desired objectives. There are three basic types of projects: (1) New Construction - A highway or bridge, , or improvements to extend the service life of an existing highway or bridge. These projects generally, safety or resurfacing pavement to extend the service life, to minor lane and shoulder widening, bridge, Design, Traffic Operations, Safety, Right of Way, Utilities, Landscape, Survey, Maintenance, , such as Maintenance, Construction, Design, Traffic Operations, Access Management, Public Transportation

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdm110initialengineering.pdf?sfvrsn=5b454d21_5

Material Price Adjustment - Guardrail

THROUGH CONCRETE SURFACE EA 0.650000 $0.00 536-8 GUARDRAIL- BRIDGE ANCHORAGE ASSEMBLY, FURNISH, AND INSTALL, TL-3 EA 0.650000 $0.00 536-8-60 APPROACH TRANSITION TO RIGID BARRIER- BRIDGE ANCHORAGE ASSEMBLY, REMOVE EA 0.650000 $0.00 536-83-1 GUARDRAIL POST REPLACEMENT, REGULAR (MAINTENANCE USE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/mpa-index/material-price-adjustment---guardrail.xlsx?sfvrsn=9d2fa2d4_23

D1-12-03-26BSN

AND MAINTENANCE PROGRAMS 801 North Broadway Avenue Bartow, Florida 33830 Bartow, FL December 03, 2026, . Maintenance contracts do not require a contractor to have a certificate of qualification, unless, maintenance contracts will contain specific requirements for maintenance contractor eligibility. Bid, Specifications for Road and Bridge Construction, or as amended by the project Specifications Package or any, in the most current edition of the Department’s Standard Specifications for Road and Bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2026/dec03/d1-12-03-26bsn.pdf?sfvrsn=abd3236_1

E54E2-R0

/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles Letting Date, Fiscal Year: 2027 County: Marion Contract Calendar Days: 365 This is a Maintenance Work Document, , REFURBISHMENT, WHITE, SOLID, 6" FOR MAINTENANCE USE LF 120,000.000 0711- 12-122 THERMOPLASTIC, , YELLOW, SOLID, 6" MAINTENANCE USE ONLY LF 200,000.000 0711- 12-222 THERMOPLASTIC, REFURBISHMENT, YELLOW, SOLID, 8" MAINTENANCE USE ONLY LF 1,000.000 0711- 12-224 THERMOPLASTIC, REFURBISHMENT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2026/dec01/e54e2-r0.pdf?sfvrsn=77b5696f_1

2027FDM943Lighting

) Electrical work associated with bridge mounted signs, when applicable. 943.6.4 Box Girder Maintenance Lighting Details Sheet The Box Girder Maintenance Lighting Details sheet provides the following, ) Pole Details (8) Foundation Details (9) Underdeck Lighting Details (10) Box Girder Maintenance, Mast Lighting) • Index 715-240 (Maintenance Lighting for Box Girders) Topic #625-000-002 FDOT, work with standard notation to indicate the items that are incidental to the bridge. (2) Mounting

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdm943lighting.pdf?sfvrsn=47559077_4

2027FDM231Lighting

and restrictions related to bridge attachments. Typically, the District Maintenance Engineer in conjunction, to bridge traffic railings, concrete median barrier walls, concrete shoulder barrier walls, light loss and maintenance factors, and they are provided in Table 231.2.1 as the required initial, For the differing daytime bridge underdeck analysis requirements, see FDM 231.3.6.2. The Veiling Luminance, unless they are bridge or barrier mounted. Where practical, avoid placing unshielded light poles

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdm231lighting.pdf?sfvrsn=12cf90ed_5

drainagemanual2027

under FDOT’s Comprehensive O&M Program (COMP) or is categorized as a high-maintenance stormwater, developed with the new Supplemental O&M Plan Form, define maintenance effort ratings, include NPDES MS4, standards and criteria for the design, construction, maintenance, and operation of public roads, to, the FDOT Design Manual (FDM), Structures Design Guidelines (SDG), Standard Plans for Road and Bridge Construction (Standard Plans), and Standard Specifications for Road and Bridge Construction (Standard

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/drainage/files/drainagemanual2027.pdf?sfvrsn=2eea19e_4

2027FDM230SPavtMarkings

Bridge Deck * Two Reactive Components require approval by District Maintenance Engineer, and Traffic Railings For information regarding attachments to bridge traffic railings, concrete median, ramps. A delineator may be a flexible or a non-flexible type. District maintenance offices generally, TOL-050 is required at all maintenance pull-off areas. (2) Sign TOL-050 must be ground-mounted and located within 12 inches from the end of the concrete barrier adjacent to the maintenance pull-off area

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdm230spavtmarkings.pdf?sfvrsn=dd016927_5

BStandardPlansFY2027-28

, 2028 2027-28 STANDARD PLANS FOR BRIDGE CONSTRUCTION State of Florida Department, STANDARD PLANS FOR BRIDGE CONSTRUCTION FDOT Roadway Design Office Topic No: 625-010-003, Theo. Theoretical MOT Maintenance Of Traffic R/W Right Of Way THW or THWN Insulation (Flame Retardant, Concrete Construction (Cont.) Maintenance of Traffic 450-452 15" Florida Slab Beam 102-200 Temporary Acrow 300 Series Detour Bridge General Notes & Details 450-453 18" Florida Slab Beam 102-201

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2028/bstandardplansfy2027-28.pdf?sfvrsn=a8f76a75_1

Historical Item Averages Statewide 6 Months

0465 20 2 $361.61 $260,000.00 719.000 DA N MOVABLE BRIDGE- PREVENTATIVE MAINTENANCE & ROUTINE, 52,173.000 DA N MAINTENANCE OF TRAFFIC 0102 2142 1 $325,000.00 $325,000.00 1.000 LS Y SPECIAL DETOUR- TEMPORARY BRIDGE, PROJECT 445148-1-52-01 0102 2200 30 $16.59 $7,736,330.54 466,444.000 SY N SPECIAL, FOR TEMPORARY DRIVEWAY MAINTENANCE 0102 4 1 38 $51.86 $1,175,739.95 22,672.000 SY N PEDESTRIAN OR BICYCLE, 0102104 61 $18.20 $1,835,596.65 100,859.000 ED N TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/statewide/excel/historical-item-averages-statewide-6-months.xlsx?sfvrsn=1639ad93_16

CoverFY2027-28

and structures. These Standard Plans may be used for maintenance operations or adopted by other, refer to Subsection 7-3 of the FDOT Standard Specifications for Road and Bridge Construction, , as “a bridge, viaduct, tunnel, causeway, approach, ferry slip, culvert, toll plaza, gate, or other similar

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2028/coverfy2027-28.pdf?sfvrsn=6f8ebdc4_1

Escambia County FY27-31 Summary

Adopted Five-Year Work Program ESCAMBIA COUNTY Highways 000154-2 - CR 399 BOB SIKES BRIDGE INSURANCE, R/W and Bridge Bonds $372,384 State $159,016 Total for Project 222476-1 $3,093,848 $1,812,052, Railroad & Utilities State $2,600,000 Right of Way Federal $188,073 R/W and Bridge Bonds, $1,889,829 Total for Project 436739-1 $1,889,829 437699-1 - CR 4 W HWY 4 OVER CANOE CREEK BRIDGE NO. 480039 Type of Work: BRIDGE REPLACEMENT Phase Funding Source 2026 2027 2028 2029 2030

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d3_adopted_documents/escambia-county-fy27-31-summary.pdf?sfvrsn=d369346c_1

2027FDM224SharedUsePaths

ownership, maintenance, and management responsibilities, including: (a) Lighting (b) Fencing, January 1, 2027 224 Shared Use Paths 3 (4) A proposed overpass crossing (i.e., bridge structure, bridge) must meet minimum vertical clearance as defined in FDM 224.8. A proposed underpass must, in constrained conditions. Consider the accommodation of emergency and maintenance vehicles or management, Calculator may be used as a guide in determining appropriate width. 224.4.1 Tunnel and Bridge Widths Clear

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdm224sharedusepaths.pdf?sfvrsn=bc3f764f_3

Historical Item Averages Market Area 11

$2,238.53 $9,791,310.07 4,374.000 DA N MAINTENANCE OF TRAFFIC 0102 2200 2 $147.27 $2,408,931.00, TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 0102107 1 4 $8.08 $36,336.52 4,495.000 ED N TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 0102112 2 $61.30 $28,445.36 464.000 DA N EXISTING ITS MAINTENANCE 0102115 7 $.26 $6,555.59 25,299.000 ED N TYPE III BARRICADE 0102150 1 1, 137.000 EA N TREE ROOT AND BRANCH PRUNING 0110 71 1 1 $500.00 $71,500.00 143.000 LF N BRIDGE FENDER

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/market-area/pdf/historical-item-averages-market-area-11.pdf?sfvrsn=e5cf1326_15

E3Z70

: 1825 Total Bridge Length: 0.000 Miles Letting Date: 12/10/26 Total Proposal Length: 0.000 Miles, FOR TEMPORARY DRIVEWAY MAINTENANCE CY 300.000 0102- 14- TRAFFIC CONTROL OFFICER HR 300.000 0102, MESSAGE SIGN, TEMPORARY ED 900.000 0102-104- TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION ED 500.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION ED 500.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2026/dec10/e3z70.pdf?sfvrsn=8eabcf60_1

2027FDM127CAF

financial responsibility for the feature’s design, construction, and maintenance during its lifespan, the Department’s requirements governing safety, access, and maintenance of the highway. A CAF, maintaining agency, other than a local government, must coordinate approvals and maintenance through, code to which the feature will be designed. (6) If the feature is to be affixed to a bridge: (a) Identify the bridge owner. (b) Declare what the impact is to the bridge loading. (7) For Local ID

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdm127caf.pdf?sfvrsn=8867ee87_4

D3-12-10-26BSN

AND MAINTENANCE PROGRAMS 1074 Hwy 90 Chipley, Florida 32428 Chipley, FL November 10, 2026 Advertisement, over $250,000.00 as established by the Department’s budget. Maintenance contracts do not require, and specifications. If deemed necessary by the Department, certain maintenance contracts will contain specific requirements for maintenance contractor eligibility. Bid Solicitation Notice Page 2, consideration in accordance with Article 3-1 of the Standard Specifications for Road and Bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2026/dec10/d3-12-10-26bsn.pdf?sfvrsn=223eefa1_1

D4-12-11-26BSN

AND MAINTENANCE PROGRAMS FDOT District 4- Office of Procurement 3400 W. Commercial Blvd. Ft. Lauderdale, by the Department’s budget. Maintenance contracts do not require a contractor to have a certificate, by the Department, certain maintenance contracts will contain specific requirements for maintenance, of the Standard Specifications for Road and Bridge Construction, or as amended by the project, for Road and Bridge Construction. Insurance companies must be authorized to do business in the State

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2026/dec11/d4-12-11-26bsn.pdf?sfvrsn=85e67bab_1

PMG PDF V18

& Maintenance of the PMG The PMG is managed by the Production Support Office’s Project Management, Development and Environment (PD&E), Design, Right of Way, Construction or Maintenance. The PM, , construction and maintenance services.  Process appropriate changes in the contract amount, for the specific local government agency and it should address future ownership and maintenance, ownership and maintenance responsibility. The PM needs to coordinate with Work Program to program

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/project-management/pmg/pmg-pdf-v18.pdf?sfvrsn=66d2a975_9
20 of 231 results
Top