4542 search results for fla

FDOT and FHP Announce “Operation Southern Shield”

INDEX A-Z Search For Immediate ReleaseAugust 07, 2021 CONTACT FDOT: FDOT COMMUNICATIONS OFFICE (850) 414-4590 ICYMI: FDOT Receives the 2021 Transportation Achievement Award SunTrax recognized in TSMO Category for Achievement TALLAHASSEE, Fla. – The Florida Department

https://www.fdot.gov/info/co/news/2021/08072021

Florida Observes Older Driver Safety Awareness Week

& mobility independence Dec. 6-10, 2021 TALLAHASSEE, Fla. – The Florida Department of Transportation

https://www.fdot.gov/info/co/news/2021/12012021

FDOT Receives Grants Totaling $37 Million to Enhance Transportation Safety

INDEX A-Z Search For Immediate ReleaseAugust 12, 2022 CONTACT FDOT: FDOT COMMUNICATIONS OFFICE (850) 414-4590 | FDOTCommunicationsOffice@dot.state.fl.us FDOT Receives Grants Totaling $37 Million to Enhance Transportation Safety TALLAHASSEE, Fla. – The Florida

https://www.fdot.gov/info/co/news/2022/08122022

FDOT Announces I-75 Closure Due to Rising River

TALLAHASSEE, Fla. – Please be advised that the Myakka River under Interstate 75 (I-75) has risen

https://www.fdot.gov/info/co/news/2022/09302022-2

Gov. DeSantis Directs FDOT to Expedite Emergency Repairs Needed to Restore Access to Pine Island

Access to Pine Island will be Restored by Saturday, October 8 TALLAHASSEE, Fla. – Today, Governor

https://www.fdot.gov/info/co/news/2022/10022022

Tolls Status on Florida Roads Following Hurricane Ian

OCOEE, Fla. – The Florida Department of Transportation, Florida’s Turnpike Enterprise and other toll

https://www.fdot.gov/info/co/news/2022/10132022

FDOT and Partners Celebrate 9th Annual Mobility Week

| FDOTCommunicationsOffice@dot.state.fl.us FDOT and Partners Celebrate 9th Annual Mobility Week TALLAHASSEE, Fla

https://www.fdot.gov/info/co/news/2024/10252024

Toll Relief Program Begins January 1

please visit SunPass.com or call 1-888-TOLL-FLA (1-888-865-5352).  ### www.fdot.gov

https://www.fdot.gov/info/co/news/2022/12302022

Agency Term Contract - Street Sweeper

: Triangle & Flare Kit Manufacturer and model number: Global M4HSD Unit Price $200.00 ITEM DESCRIPTION, be of split flange type to enable replacement without having to remove belts and shafts. Sprockets, , LED back up lights and reflectors, self canceling turn signals with hazard flashers, electrical

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procurement/files_agency_term_contracts/agency-term-contract---street-sweeper.pdf?sfvrsn=575a7cfc_4

20_Drainage_Rulemaking

feet per second (fps) when the storm drain is flowing full. Where not practical or possible in flat, flow from intersecting streets before it reaches the major highway. • Flanking inlets in sag, longitudinal gutter grade shall be 0.3%. Minimum grades can be maintained in very flat terrain by use, , or water control facilities. If other modifications, such as landscaping or providing flat slopes, can

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/floridagreenbook/16th-edition/20_drainage_rulemaking.pdf?sfvrsn=417b68ec_1

521-405

. and finish flat by grouting or grinding as required. Exposed existing reinforcing steel not encased 3, Existing Flared Wing Wall similar Existing Parallel Wing Wall shown, (Type Varies) Existing Wing Post, Height on Match Existing Retrofit Railing of Vertical Face Begin Flared Portion Surface Final, Portion of Vertical Face Retrofit of Transition Limiting Station Face Retrofit Railing Begin Flared, OF INSIDE FACE OF RAILING RAILING END TREATMENT FOR FLARED CURBS SCHEME 4 (Existing Wing Post

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2025/idx/521-405.pdf?sfvrsn=e6521bd2_1

521-405

over. and finish flat by grouting or grinding as required. Exposed existing reinforcing steel, Face Existing Flared Wing Wall similar Existing Parallel Wing Wall shown, (Type Varies, Bridge Curb Height on Match Existing Retrofit Railing of Vertical Face Begin Flared Portion, Begin Flared Portion of Vertical (Varies) when present Asphalt Overlay Surface Final Riding, ) PARTIAL ELEVATION OF INSIDE FACE OF RAILING RAILING END TREATMENT FOR FLARED CURBS SCHEME 4 (Existing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/521-405.pdf?sfvrsn=543576b4_1

521-405

flat by grouting or grinding as required. Exposed existing reinforcing steel not encased 3. Where, Sleeve Assembly Expansion Dowel (Typ.) Bars 4C Retrofit Railing Vertical Face Existing Flared, Existing Retrofit Railing of Vertical Face Begin Flared Portion Surface Final Riding present, Face Retrofit of Transition Limiting Station Face Retrofit Railing Begin Flared Portion, OF RAILING RAILING END TREATMENT FOR FLARED CURBS SCHEME 4 (Existing Wing Post, Railing

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/521-405.pdf?sfvrsn=8980effe_1

6870300.impl

and flashing beacon sites. Ensurethatanypublicnetworkconnections(PSTN,cellular,orotherconnections, tests on at least one HAR system, including the operations center, one sign and flashing beacon

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/implemented/6870300.impl.pdf?sfvrsn=e7fbd7f2_0

E1Y19-R0

MIDBLOCK CROSSWALK: RECTANGULAR RAPID FLASHING BEACON, FURNISH & INSTALL- SOLAR, COMPLETE SIGN ASSY- SINGLE DIRECTION AS 2.000 0654- 2- 22 MIDBLOCK CROSSWALK: RECTANGULAR RAPID FLASHING BEACON

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2025/nov06/e1y19-r0.pdf?sfvrsn=74fe7295_1
20 of 4542 results