1779 search results for work mix

fe-guidelist 2025 CLEAN

5.11 PrC Information a)Monthly Progress Estimates ☐ ☐ b)Daily Work Report (DWR) and Daily, Software ☐ ☐ a)FDOT Quantities Programs (such as the Core-out Work Sheet) ☐ ☐ CPAM 5.14 CPAM 5.15, or ERS- Stabilizing Mix Depth Reports ☐ ☐ f)Mix Designs (for Gmm and Gsb) ☐ ☐ g)Other Reports, appropriate pay items are loaded in PrC. ☐ ☐ 6.Spot Check ☐ ☐ a)All MOT Items/night work, -Disincentive Contingency-Non-Part Work Order Amount Incentive-Disincentive Contingency

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/constadm/guidelist/finalest/fe-guidelist-2025-clean.docx?sfvrsn=6302b7d9_3

fe-guidelist 2025 CLEANrev

5.11 PrC Information a)Monthly Progress Estimates ☐ ☐ b)Daily Work Report (DWR) and Daily, Software ☐ ☐ a)FDOT Quantities Programs (such as the Core-out Work Sheet) ☐ ☐ CPAM 5.14 CPAM 5.15, or ERS- Stabilizing Mix Depth Reports ☐ ☐ f)Mix Designs (for Gmm and Gsb) ☐ ☐ g)Other Reports, to ensure appropriate pay items are loaded in PrC. ☐ ☐ 6.Spot Check ☐ ☐ a)All MOT Items/night work, Incentive-Disincentive Contingency-Non-Part Work Order Amount Incentive-Disincentive Contingency

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/constadm/guidelist/finalest/fe-guidelist-2025-cleanrev.docx?sfvrsn=23edfc42_3

FY 2023-2024 Workbook

, SPECIAL PROVISIONS, AND SITE OF WORK.(REV 6-16-21) (FA 8-2-21) (FY 2023-24) Insert Information, PROVISIONS, AND SITE OF WORK (60 DAY AD).(REV 6-16-21) (FA 8-2-21) (FY 2023-24) Insert Information, of the District Construction Engineer in accordance with the Work Program Instructions.*Notify Contracts Office, . SP0030100BC Use at the direction of the District Construction Engineer in accordance with the Work Program, 10-17-16) (FA 10-24-16) (FY 2023-24)Changes to: 3-9. SP0030900 All Jobs. SCOPE OF THE WORK - INTENT

https://www.fdot.gov/programmanagement/implemented/workbooks/fy-2023-2024-workbook/fy-2023-2024-workbook

July 2022 Workbook

, AND SITE OF WORK.(REV 6-16-21) (FA 8-2-21) (7-22) Insert Information Required.Changes to: 2-4, REQUIREMENTS AND CONDITIONS - EXAMINATION OF PLANS, SPECIFICAITONS, SPECIAL PROVISIONS, AND SITE OF WORK (60, . SP0030100 Use at the direction of the District Construction Engineer in accordance with the Work, in accordance with the Work Program Instructions.*Notify the Contracts Administration Office, 10-17-16) (FA 10-24-16 ) (7-22)Changes to: 3-9. SP0030900 All Jobs. SCOPE OF THE WORK - INTENT

https://www.fdot.gov/programmanagement/implemented/workbooks/jul-2022-workbook/july-2022-workbook

FDOT Local Government Resource Guide

» Office of Comptroller » Office of Work Program and Budget » Office of Administration Chief, Projects (LOPP), which feeds projects into the FDOT Work Program, the MPO’s Transportation, of Priority Projects Transportation Improvement Program Capital Improvement Plan Adopted Work, Government MPO State Strategic Intermodal System (SIS) Tentative Work Program Modal Plans P u b, ’s 5-Year Work Program and the STIP. T h e Transportation Improvement Program (TIP) is an MPO’s

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/policy/local-resource-guide/local_government_resource_guide.pdf?sfvrsn=73a47356_8

FDOT TA Set-Aside Program Tentative Work Program FY 2025-2026 – FY 2029-2030 Detailed Table Set_as-of-2025-04-09_ADA

FDOT TA Set-Aside Program Tentative Work Program FY 2025-2026 – FY 2029-2030 Detailed Table Set_as-of-2025-04-09_ADA, ” is listed as the county name; and (7) “Facility Type” corresponds with Work Mix, see Appendix D, , “Statewide” is listed as the county name; and (7) “Facility Type” corresponds with Work Mix, see, , “Statewide” is listed as the county name; and (7) “Facility Type” corresponds with Work Mix, see, as the county name; and (7) “Facility Type” corresponds with Work Mix, see Appendix D: https://www.fdot.gov, ” is listed as the county name; and (7) “Facility Type” corresponds with Work Mix, see Appendix D: https

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/systems/systems-management/document-repository/tap/fdot-ta-set-aside-program-tentative-work-program-fy-2025-2026-fy-2029-2030-detailed-table-set_as-of-2025-04-09_ada.pdf?sfvrsn=4d15253a_1

Chapter11s5

straightedging report for their use. (5) The VT-2 shall be present during the corrective work, as established in the FDOT Specifications. The corrective work will be reported on the Daily Report, corrective work in accordance with CPAM 11.5.5.1(4) and document the results in accordance with CPAM, by the Contractor, the VT-2 shall be present during the corrective work and will verify that each surface, work will be reported on Form No. 700-010-13, Daily Report of Construction. One or more follow-up

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/chapter11s5.pdf?sfvrsn=856d0be9_8

MPOAC-Governing-Board-Meeting-Packet-08-02-2018

of the Transportation Budget:  $10.8 billion total in the FDOT 5-Year Work Program o $9.8 billion, will work collaboratively towards setting the targets, developing the data, and reporting the progress, the existing SIS facility categories became 7 harder to work with. As a result, FDOT is proposing a new, , commented that she would like to give the Staff Directors’ direction to continue to work with FDOT, that the study could be used to 12 assist the heartland area of Florida and surrounding areas to work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2018/mpoac-governing-board-meeting-packet-08-02-2018.pdf?sfvrsn=f4d78014_1

1020602.comm

and LCD is now mixed in there as by the linear feet. Very confusing. Response, barrier separating pedestrians from our work zones. They have structural properties and construction, concrete barrier wall protects vehicular traffic from our work zones. LCDs have been an effective, work zone signs per each per day. But doesn’t state the LCDs in particular: like for instance will it, that accommodate mounting of Work Zone signs. Consider adding ‘as applicable’ to this sentence

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/comments-responses/1020602.comm.pdf?sfvrsn=ad76376f_0

SS9320102

structures. 932-1.2.2 Material: The joint sealant shall be composed of a mixture of materials, typically, breakers shall be covered by sealant at the end of each work day. A tolerance in cross-sectional

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2007/january-2007/workbook/ss93201020bc44787914c4ff0a8b2f4a20f802fec.pdf?sfvrsn=2ec47f2c_0

E54C0BidTabs

Project. Intent & Scope: The work under this Contract consists of asphalt milling and resurfacing, of prequalification with the Department in "Hot Plant Mix Bituminous Course" will suffice to meet

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/bid-tabs/2023/oct03/e54c0bidtabs.pdf?sfvrsn=960938ec_1

E55C0BidTabs

Lead Time: 14 Days This is a maintenance Pay Item Project. Intent: The work under this Contract, that presently has a certificate of prequalification with the Department in "Hot Plant Mix

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/bid-tabs/2023/nov07/e55c0bidtabs.pdf?sfvrsn=44b4c4cc_1

451270 Technical POP Memo

13.988 to MP 14.283 SB: MP 14.180 to MP 14.472 Project Length: 3.674 miles FPID No.: 451270-1 Work Mix: 0012 (Resurfacing) 1. Existing R/W Map Project Numbers: 09030-2529; Varies from 100-244 feet 2

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/25122/451270-technical-pop-memo.pdf?sfvrsn=bb158d_1

450884 Technical POP Memo

 1 Candidate Project Pavement Only Project (POP) April 29, 2024 To: Lavenia Toole, PE From: Felicia Pannell, PE RE: SR 544 from 8 th St NW (US 17) to 10TH St S TECHNICAL POP Memo State Road Number: SR 544 Section Number: 16140000 County: Polk County Project Limits: SR 544 from 8th St NW (US 17) to 10TH St S Begin MP/End MP: 3.210 to 11.647 Exception limits: MP 3.693 to MP 4.169 Section Equation: N/A Project Length: 8.437 miles FPID No.: 450884-1 Work Mix: 0226 Pavement Only

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26106/450884-technical-pop-memo.pdf?sfvrsn=83956f59_1

SS43100000M

for the proposed liner product from the Engineer prior to beginning work. Installation of the rehabilitative, mix applied with a centrifugal device in accordance with manufacturer’s written requirements

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/maintenance/review-package/ss43100000m.pdf?sfvrsn=47eaeb1_2

SS4310000Morigind

written approval for the proposed liner product from the Engineer prior to beginning work, reinforced cement/mortar mix applied with a centrifugal device in accordance with manufacturer’s

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/maintenance/review-package/ss4310000morigind.pdf?sfvrsn=ac3ea45b_2

19-14-Hill-TDMM

a Model Work? Where & How will people travel in the FUTURE? ESTABLISHED DATA Land use, travel together by vehicle How people travel by transit Mix of transportation modal

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/training/transportationsymposium/2025-june/19-14-hill-tdmm.pdf?sfvrsn=890b96d5_1

Staff-Directors-Meeting-Packet-08-02-2018

total in the FDOT 5-Year Work Program o $9.8 billion for projects and activities o $780 million, on how FDOT and FHWA will work collaboratively towards setting the targets, developing the data, process for the programing of Safety, Bridge and Pavement projects in the FDOT Work Program, types, and how the existing SIS facility categories became harder to work with. As a result, FDOT, Unified Planning Work Program (UPWP) has been developed by MPOAC Staff. The draft UPWP (included

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/mpoac_website/meetings/2018/staff-directors-meeting-packet-08-02-2018.pdf?sfvrsn=60a934cc_1
20 of 1779 results