1272 search results for temporary steel bridge

SP7150100

, number of lights, and breaker amps. 5. Identify bridges by Name and Bridge Number. 6. Number, and proceed to number all light poles (including bridge mounted), high mast poles, sign structures, of work performed, pole number, location by grid map or nearest count to a ramp or bridge, Standard Specifications for Road and Bridge Construction and is consistent with the existing, broken bolts and re-tap holes. Use stainless steel bolts to hold the door securely in place

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/maintenance/finalized/sp71501003178e724226a4e54a84570e69731bc99.pdf?sfvrsn=d5ae272d_3

SP7150100

, number of lights, and breaker amps. 5. Identify bridges by Name and Bridge Number. 6. Number, and proceed to number all light poles (including bridge mounted), high mast poles, sign structures, of work performed, pole number, location by grid map or nearest count to a ramp or bridge, Standard Specifications for Road and Bridge Construction and is consistent with the existing lighting, broken bolts and re-tap holes. Use stainless steel bolts to hold the door securely in place

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/maintenance/finalized/sp7150100ebbfd8c6-1198-4a30-8f85-a5bd6c19be15.pdf?sfvrsn=3ab39691_2

SP7150100

, number of lights, and breaker amps. 5. Identify bridges by Name and Bridge Number. 6. Number, and proceed to number all light poles (including bridge mounted), high mast poles, sign structures, of work performed, pole number, location by grid map or nearest count to a ramp or bridge, Standard Specifications for Road and Bridge Construction and is consistent with the existing, broken bolts and re-tap holes. Use stainless steel bolts to hold the door securely in place

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/maintenance/finalized/sp7150100.pdf?sfvrsn=c43711ef_1

SP7150100

, number of lights, and breaker amps. 5. Identify bridges by Name and Bridge Number. 6. Number, at a time and proceed to number all light poles (including bridge mounted), high mast poles, sign, of work performed, pole number, location by grid map or nearest count to a ramp or bridge, Standard Specifications for Road and Bridge Construction and is consistent with the existing, . Remove broken bolts and re-tap holes. Use stainless steel bolts to hold the door securely in place

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/maintenance/finalized/sp7150100.pdf?sfvrsn=6c3d31f7_1

SP7150000

, number of lights, and breaker amps. 5. Identify bridges by Name and Bridge Number. 6. Number, at a time and proceed to number all light poles (including bridge mounted), high mast poles, sign, of work performed, pole number, location by grid map or nearest count to a ramp or bridge, Standard Specifications for Road and Bridge Construction and is consistent with the existing, . Remove broken bolts and re-tap holes. Use stainless steel bolts to hold the door securely in place

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/maintenance/finalized/sp7150000.pdf?sfvrsn=667ae112_1

SP7150100

, number of lights, and breaker amps. 5. Identify bridges by Name and Bridge Number. 6. Number, at a time and proceed to number all light poles (including bridge mounted), high mast poles, sign, of work performed, pole number, location by grid map or nearest count to a ramp or bridge, Standard Specifications for Road and Bridge Construction and is consistent with the existing, . Remove broken bolts and re-tap holes. Use stainless steel bolts to hold the door securely in place

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/january-2017/maintenance/finalized/sp7150100.pdf?sfvrsn=89931f20_2

7000000-723 FHWA

signs erected partially or completely over the traveled roadway or mounted on bridges. as oOverhead, . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Section 347 Reinforcing Steel ................................................Section 415 Structural Steel Welding, . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Section 965 Structural Steel, shall have rounded corners. For flip up signs, the continuous hinge shall be stainless steel ANSI

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/fhwa/7000000-723-fhwa.pdf?sfvrsn=8b62410d_1

E6O83BidTabs

0015 0102 71 13 TEMPORARY BARRIER, F&I, LOW PROFILE, CONCRETE 1,000.000 LF 95.00000 95,000.00 50.00000 50,000.00 200.00000 200,000.00 0020 0102 71 15 TEMPORARY BARRIER, F&I, ANCHORED 100.000 LF 60.00000 6,000.00 100.00000 10,000.00 50.00000 5,000.00 0025 0102 71 16 TEMPORARY BARRIER, , TEMPORARY 500.000 ED 16.00000 8,000.00 50.00000 25,000.00 30.00000 15,000.00 0050 0102104 TEMPORARY, 50.00000 20,000.00 0055 0102107 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 400.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/bid-tabs/2023/sep28/e6o83bidtabs.pdf?sfvrsn=78d3b726_1

E1X04RFP

Bridge Plans 170129 I-75 SB Over Sumter Blvd Existing Plans – SPN 17075-3403 – Doc #1055431 Bridge Plans 170129 I-75 SB Over Sumter Blvd Widening - FPID 409210-1-52-01 - Doc #1055449 Bridge Plans 170130 I-75 NB Over Sumter Blvd Existing Plans – SPN 17075-3403 – Doc #1055432 Bridge Plans 170130 I-75 NB Sumter Blvd - FPID 409210-1-52-01 - Doc #1055450 Bridge Plans 170140 I-75 Over Toledo, shoulder beneath the I-75 bridge. The proposed Sumter Blvd. typical section will include two 12-foot

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1x04/e1x04rfp.pdf?sfvrsn=3ed34e5c_1

E1X04Addendum001

DOCUMENTS E01 - As-Built Plans Bridge Plans 170129 I-75 SB Over Sumter Blvd Existing Plans – SPN 17075-3403 – Doc #1055431 Bridge Plans 170129 I-75 SB Over Sumter Blvd Widening - FPID 409210-1-52-01 - Doc #1055449 Bridge Plans 170130 I-75 NB Over Sumter Blvd Existing Plans – SPN 17075-3403 – Doc #1055432 Bridge Plans 170130 I-75 NB Sumter Blvd - FPID 409210-1-52-01 - Doc #1055450 Bridge, guardrail to the outside of the 10-foot paved shoulder beneath the I-75 bridge. The proposed Sumter Blvd

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1x04/e1x04addendum001.pdf?sfvrsn=85bb5769_1

E1X04Addendum002

2023-01c dated 4/11/2023 Page 5 of 57 EXEMPT DOCUMENTS E01 - As-Built Plans Bridge Plans 170129 I-75 SB Over Sumter Blvd Existing Plans – SPN 17075-3403 – Doc #1055431 Bridge Plans 170129 I-75 SB Over Sumter Blvd Widening - FPID 409210-1-52-01 - Doc #1055449 Bridge Plans 170130 I-75 NB Over Sumter Blvd Existing Plans – SPN 17075-3403 – Doc #1055432 Bridge Plans 170130 I-75 NB Sumter Blvd - FPID 409210-1-52-01 - Doc #1055450 Bridge Plans 170140 I-75 Over Toledo Blade Blvd Bride Widening

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1x04/e1x04addendum002.pdf?sfvrsn=8b0091c4_1

E1X04Addendum003

- As-Built Plans Bridge Plans 170129 I-75 SB Over Sumter Blvd Existing Plans – SPN 17075-3403 – Doc #1055431 Bridge Plans 170129 I-75 SB Over Sumter Blvd Widening - FPID 409210-1-52-01 - Doc #1055449 Bridge Plans 170130 I-75 NB Over Sumter Blvd Existing Plans – SPN 17075-3403 – Doc #1055432 Bridge Plans 170130 I-75 NB Sumter Blvd - FPID 409210-1-52-01 - Doc #1055450 Bridge Plans 170140, to the outside of the 10-foot paved shoulder beneath the I-75 bridge. The proposed Sumter Blvd. typical

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/designbuild/e1x04/e1x04addendum003.pdf?sfvrsn=49e22945_1

2024-25-UpdateTraining

695-001 • Joshua Turley • Structures and Bridge Related Updates • Shae Gibbs • Miscellaneous, Standard Plans – Primary Updates: 1)Index 102-110 – Type K Temporary Concrete Barrier System 2)Index 102-200 – Te m porary Acrow 300 Series Detour Bridge General Notes and Details 3)Index 400-010, • Added “Shoulder Rocking” compatibility 2)Index 536-001 – Guardrail • New Sheet 21 - Bridge trailing, - Sheet 21 - Bridge trailing curb options • Revised washer usage – new exclusions Standard Plans

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/training/2024-25-updatetraining.pdf?sfvrsn=f8d70a6c_1

D3-09-11-25BSN

After consideration in accordance with Article 3-1 of the Standard Specifications for Road and Bridge, of the Department’s Standard Specifications for Road and Bridge Construction. Insurance companies must, /bidder_assist.shtm , Standard Specifications for Road and Bridge Construction and the Special, Roadway Length: 3.583 Miles Contract Days: 850 Total Bridge Length: 0.000 Miles Letting Date: 09/11/25, Bridge Length: Letting Date: Total Proposal Length: 0.00 0 Miles 0.000 Miles 0.00 0 Miles

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2025/sep11/d3-09-11-25bsn.pdf?sfvrsn=79011ac2_2

Motorola steel post 7-25-24 plans

Motorola steel post 7-25-24 plans, : FOUNDATION DESIGN DRAWINGS INCLUDES: PROPOSED CONCRETE FOUNDATION & STEEL EMBEDMENT COUNTY: HARDEE SITE, 2015 W/ 2017-2022 AMMENDMENTS & FDOT STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION FY, . THIS INCLUDES, BUT IS NOT LIMITED TO, THE ADDITION OF TEMPORARY BRACING, GUYS OR TIEXDOWNS THAT MAY, DRAWINGS. 1. ALL DETAILING, FABRICATION AND ERECTION OF STRUCTURAL STEEL SHALL CONFORM TO THE AISC SPECIFICATIONS, LATEST EDITION. 2. ALL STRUCTURAL STEEL ELEMENTS SHALL CONFORM TO THE FOLLOWING

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/test/approved-lpr/motorola-steel-post-7-25-24-plans.pdf?sfvrsn=a5978062_1

4550201-724IMPLrev

of the Engineer. Clean all areas of rust on structural steel items, and recoat those areas in accordance, concrete, steel, or timber piling including driving, jetting, preformed pile holes, cutting off, low displacement steel piling such as structural shapes, drive them through the compacted fill, of sufficient capacity (force and amplitude) may be used to drive steel sheet piles and, with approval of the Engineer, to drive steel bearing piles a sufficient distance to get the impact hammer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/implemented/4550201-724implrev.pdf?sfvrsn=ca68c24e_1

4550201-724IMPL

of the Engineer. Clean all areas of rust on structural steel items, and recoat those areas in accordance, concrete, steel, or timber piling including driving, jetting, preformed pile holes, cutting off, using low displacement steel piling such as structural shapes, drive them through the compacted fill, hammers of sufficient capacity (force and amplitude) may be used to drive steel sheet piles and, with approval of the Engineer, to drive steel bearing piles a sufficient distance to get the impact hammer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/implemented/4550201-724impl.pdf?sfvrsn=5be8e41b_1

rstandardplansfy2023-24e4

Bridge Approach Expansion Joint - Concrete Pavement with Special Select Soil Base 102-100 Temporary, for Mail Station 32 Road and Bridge Construction 605 Suwannee Street Topic No. 625-010-003, to Subsection 7-3 of the FDOT Standard Specifications for Road and Bridge Construction. DISTRIBUTION, of these sensitive documents. Structure is defined in Section 334.03(27), F.S., as “a bridge, determined that the term “structure” includes “bridges with an opening of more than 20 feet between

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2024/rstandardplansfy2023-24e4.pdf?sfvrsn=9bc213e4_2

SS4100000

to the plan details, including reinforcing steel grade, sizes and spacings, concrete cover, concrete, with the same hydraulic opening, fill height and reinforcing steel cover as shown in the plans, for the most critical design loading combination. Perform a bridge load rating in accordance, inches for 3 inch concrete cover. Perform a bridge load rating in accordance with the Structures, ’sEngineerofRecordperforms any bridge load rating and the design for any Special Designs and signs and seals

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2009/january-2009/workbook/ss4100000.pdf?sfvrsn=d503a7a8_0

rstandardplansfy2023-24e5

Bridge Approach Expansion Joint - Concrete Pavement with Special Select Soil Base 102-100 Temporary, for Mail Station 32 Road and Bridge Construction 605 Suwannee Street Topic No. 625-010-003, to Subsection 7-3 of the FDOT Standard Specifications for Road and Bridge Construction. DISTRIBUTION, of these sensitive documents. Structure is defined in Section 334.03(27), F.S., as “a bridge, determined that the term “structure” includes “bridges with an opening of more than 20 feet between

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2024/rstandardplansfy2023-24e5.pdf?sfvrsn=4b258559_1
20 of 1272 results