1780 search results for bridge inspection

NASSAU COUNTY_TWP2026-2030 WPPH_BY ITEM_11-13-2024_SUBJECT TO CHANGE

- CRANDALL ROAD OVER MCQUEEN SWAMP BRIDGE #744304 Type of Work: BRIDGE REPLACEMENT Phase Funding Source, for Project 447364-3 $1,923,434 $800,405 447863-1 - I-95 YULEE WEIGH STATION - INSPECTION BARN, : ROUTINE MAINTENANCE Phase Funding Source 2026 2027 2028 2029 2030 Bridge/Roadway/Contract Maintenance, : ROUTINE MAINTENANCE Phase Funding Source 2026 2027 2028 2029 2030 Bridge/Roadway/Contract Maintenance, Source 2026 2027 2028 2029 2030 Bridge/Roadway/Contract Maintenance State $72,360 $74,534 Total

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/documents-by-type/nassau-county_twp2026-2030-wpph_by-item_11-13-2024_subject-to-change.pdf?sfvrsn=c69cf6d2_1

6410000.FHWA

for Road and Bridge Construction (SSRBC). This activity is a planned part of an ongoing specification, . Assume responsibility for performance of all quality control testing and inspections required, with the manufacturer recommended field installation instructions, inspection instructions (including recommended, and inspections required by Sections 346 and 450; however, the PCI personnel certifications are not required, , inspection instructions (including recommended schedules and procedures), and operating instructions

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/fhwa/6410000.fhwa.pdf?sfvrsn=eb168fac_0

Section84-12717

, and inspection and testing of production concrete. The concrete may be produced either at an on-site, (QA) inspection and testing of SCC. 8.4.2 AUTHORITY Sections 20.23(3)(a) and 334.048(3), Florida, Specifications for Road and Bridge Construction. Topic No.: 675-000-000 Materials Manual Effective, are involved in these activities. (7) The proposed inspection and test methods for the laboratory, and familiarity of the personnel performing the required inspection, and testing of SCC. 8.4.6 SCC MIX DESIGN

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2017/july-2017/materials-manual/section84-12717.pdf?sfvrsn=2f9011d2_1

section84-042219

, and inspection and testing of production concrete. Produce SCC at an approved on-site facility, or off, ,; and quality assurance (QA) inspection and testing of SCC. AUTHORITY Sections 20.23(3)(a)334.044(10, of Transportation Standard Specifications for Road and Bridge Construction. Florida Department of Transportation, of personnel who are involved in these activities. G. The proposed inspection and test methods, of the personnel performing the required inspection, and testing of SCC. Topic No.: 675-000-000 Materials

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/materials-manual/section84-042219.pdf?sfvrsn=168e3e9e_1

Section8.4-72612

of the concrete mixes, and inspection and testing of production concrete. The concrete may be produced, process; and quality assurance inspection and testing of self- consolidating concrete. 8.4.2 AUTHORITY, Products 8-4-2 Florida Department of Transportation Standard Specifications for Road and Bridge, concrete related guidelines as part of the quality control plan. (7) The proposed inspection and test, and familiarity of the personnel performing the required inspection, and testing of self-consolidating

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2012/january-2012/materials-manual/section8-4-72612.pdf?sfvrsn=cf3e362d_1

Section8.4-042219_1-20WB

, and inspection and testing of production concrete. Produce SCC at an approved on-site facility, or off-site, (QA) inspection and testing of SCC. 8.4.2 AUTHORITY Sections 334.044(10)(a) and 334.048(3, Department of Transportation Standard Specifications for Road and Bridge Construction. Florida Department, for the training of personnel who are involved in these activities. G. The proposed inspection and test, of the personnel performing the required inspection, and testing of SCC. Topic No.: 675-000-000 Materials

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/january-2020/materials-manual/section8-4-042219_1-20wb.pdf?sfvrsn=85b8c033_1

section84-042219

, and inspection and testing of production concrete. Produce SCC at an approved on-site facility, or off, ,; and quality assurance (QA) inspection and testing of SCC. AUTHORITY Sections 20.23(3)(a)334.044(10, of Transportation Standard Specifications for Road and Bridge Construction. Florida Department of Transportation, of personnel who are involved in these activities. G. The proposed inspection and test methods, of the personnel performing the required inspection, and testing of SCC. Topic No.: 675-000-000 Materials

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/july-2019/materials-manual/section84-042219.pdf?sfvrsn=ff242a48_1

SS3460301

) 1.0 to 6.0 I (Pavement) 3,000 2 1.0 to 6.0 II (a) 3,400 3 (b) 1.0 to 6.0 II (Bridge Deck) 4,500, the responsibility for QC inspections on all phases of work. Ensure all materials and workmanship, sample. The Department may perform inspections in lieu of plastic properties tests of the precast, compliance with specification requirements. All QC activities, calculations, and inspections, production I (Pavement) 250 lane ft, or one day’s production, whichever is less II, II (Bridge Deck

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/ss3460301.pdf?sfvrsn=8bd48be9_0

drainagemanual2024withRevisions

for temporary drainage. Section 3.13.2 – Moved pipe inspection and siltation report to top of the list, and Bridge Construction (Standard Plans) , and Standard Specifications for Road and Bridge, Pipe Inspection and Siltation............................................. 3-19 3.11 Pipes Within, , within handicap drop curb locations or on curb returns. Do not place inlets in bridge approach, no overflow outlet other than the storm drain system (i.e., barrier wall, bridge abutment, cut sections

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/drainage/files/drainagemanual2024withrevisions.pdf?sfvrsn=90938a97_1

3460100-122impl

Environment Moderately Aggressive Environment Extremely Aggressive Environment (1) Bridge, , or Ternary Blend Bridge Substructures, Drainage Structures, and other Structures All Elements Type I, are designated as Class I, Class I (Pavement), Class II, Class II (Bridge Deck), Class III, Class III (Seal, ) 3,000 0.50 1.5 or 3 (3) II (1) 3,400 0.53 3 (2) II (Bridge Deck) 4,500 0.44 3 (2) III (4, Aggressive I, I (Pavement), II, and III (Seal) 470 II (Bridge Deck), III (1) , IV, IV

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/implemented/3460100-122impl.pdf?sfvrsn=1a1c383c_2

3460100-122origind

Environment Moderately Aggressive Environment Extremely Aggressive Environment (1) Bridge, Blend Bridge Substructures, Drainage Structures, and other Structures All Elements Type I or Type, covered by this Section are designated as Class I, Class I (Pavement), Class II, Class II (Bridge Deck, (2) I (Pavement) 3,000 0.50 1.5 or 3 (53) II (1) 3,400 0.53 3 (2) II (Bridge Deck) 4,500, Slightly Aggressive I, I (Pavement), II, and III (Seal) 470 II (Bridge Deck), III (1) , IV, IV

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/internal/3460100-122origind.pdf?sfvrsn=224284a5_2

9600000.origind

with AASHTO LRFD Bridge Design Specifications and AASHTO LRFD Bridge Construction Specifications, anchorages in accordance with AASHTO LRFD Bridge Construction Specifications, or the Guideline, for inspection from either top or front of anchorage. Anchorages may be fabricated to facilitate both inspection locations or may be two separate anchorages of the same type, each providing singular inspection entry locations. 7. Geometry of grout and flexible filler outlets must facilitate

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/internal/9600000.origind.pdf?sfvrsn=3778ec17_0

SDB 24-01

. The welding inspection for the rehabilitation or modification for bridge structures should follow, in the upcoming 10th Edition of the AASHTO LRFD Bridge Design Specifications which provides, Displacement Amplification in Narrow I-Girder Bridge Units 15. Renumber Structures Design Guidelines Equation, . Design bridge widening or rehabilitation projects in accordance with SDG 7.3 and load rate in accordance with SDG 1.7. Do not isolate and evaluate the widened portion of the bridge separately from

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/structures/bulletins/2024/sdb-24-01.pdf?sfvrsn=e04a3368_1

E8V40BidTabs

of roadway widening, milling and resurfacing, widening of Bridge No. 870397 over Caribbean Boulevard, OF EXISTING STRUCTURES/BRIDGES 43721115201 BRIDGE ID 870182 (310.000) SF (LS) 173,700.00000, STRUCTURES/BRIDGES 43721115201 BRIDGE ID 870395 (250.000) SF (LS) 170,250.00000 170,250.00 27,500.00000, 43721115201 BRIDGE ID 870397 (4893.000) SF (LS) 380,750.00000 380,750.00 485,388.95000 485,388.95 1,500,000.00000 1,500,000.00 0020 0110 3 REMOVAL OF EXISTING STRUCTURES/BRIDGES 43721115201 BRIDGE ID

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/bid-tabs/2025/mar28/e8v40bidtabs.pdf?sfvrsn=23a97e1_1

E3X19

No: N/A Total Roadway Length: 0.532 Miles Contract Days: 700 Total Bridge Length: 0.016 Miles, culvert at Dry Branch Creek will be replaced with a new bridge, Bridge No. 464172, within the project, - INSPECTION AND SETTLEMENT MONITORING (21791095201) LS 1.000 0108- 2- MONITOR EXISTING STRUCTURES- VIBRATION MONITORING (21791095201) LS 1.000 0400- 2- 4 CONC CLASS II, BRIDGE SUPERSTRUCTURE CY 218.700 0400- 2- 10 CONCRETE CLASS II, APPROACH SLABS CY 209.500 0400- 4- 5 CONCRETE CLASS IV, BRIDGE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2025/jun12/e3x19.pdf?sfvrsn=1fb19577_1

drainagemanual2025

– Updated reference to FDOT’s Bridge Scour Manual to replace the interim rock/clay scour procedure, and Bridge Construction (Standard Plans) , and Standard Specifications for Road and Bridge Construction, Inspection and Siltation...............................................3-19 3.11 Pipes within, not place inlets in bridge approach slabs. Topic No. 625-040-002 Effective: January 2025 Drainage Manual, no overflow outlet other than the storm drain system (i.e., barrier wall, bridge abutment, cut sections

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/drainage/files/drainagemanual2025.pdf?sfvrsn=8cd9b5d4_8

E4X34-R0

/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles Letting, SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION FY 2023-24 (SECTION 7-13) FOR INSURANCE LIMITS. Call Order, INSPECTION (VIDEO CAMERA) LF 1,000.000 E575- 1- SODDING SY 1,567.000 Page 3 Bid Solicitation

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2024/feb04/e4x34-r0.pdf?sfvrsn=34923c36_1

Documents and Publications

Inspection of Rest Areas, Welcome Centers Download Handbook N/A Maintenance (850) 410-5757 Standard Plans for Road and Bridge Construction Download Manual N/A Roadway Design (850) 414-4334 Standard Specification for Road and Bridge Construction (All Years) Download Manual N/A Program

https://www.fdot.gov/contracts/district-offices/d5/lettings/dist-letting-project-info.shtm/lists/documentlisting/documents-and-publications

District One Letting and Project Information

Maintenance 1 E1X58-R0 Lee Guardrail & Handrail Repair E1X59-R0 Lee Pipe Inspection, Cleaning, Major Work Type Addendum E1W90 Collier Bridge Repair/ Rehabilitation 1 E1W93 Sarasota Pavement Only, E1X65-R0 Glades, Hendry BDIRPM Removal and Replacement E1X66 Lee Halfway Creek Bridge Deck

https://www.fdot.gov/contracts/district-offices/d1/lettings/dist-letting-project-info.shtm

District Six Letting and Project Information

Prequalification is not required E6P61 Miami-Dade Road and bridge sweeping on State Roads 5, 94, 825, 953, Traffic Operations Prequalification is required 1 E6P16 Monroe Bridge-Repair, Sheet MUST be submitted with the bid as an attachment. E6P68-R0 Miami-Dade Drainage Inspection

https://www.fdot.gov/contracts/district-offices/d6/lettings/letting-project-info.shtm
20 of 1780 results