1779 search results for work mix

3000900int

measurement to verify the application rate. 300-5 Cleaning Base and Protection of Adjacent Work, the target application rate by 0.6. Table 300-2 Tack Coat Application Rates Asphalt Mixture Type, sufficiently in advance of placing bituminous mix to permit drying, but do not apply tack coat so far, : Keep the tack coat surface free from traffic until the subsequent layer of bituminous hot mix has, material when measured. 300-10 11 Basis of Payment. There is no direct payment for theThe work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/internal/3000900int.pdf?sfvrsn=c8f8523e_1

3000900ind

measurement to verify the application rate. 300-5 Cleaning Base and Protection of Adjacent Work, the target application rate by 0.6. Table 300-2 Tack Coat Application Rates Asphalt Mixture Type, sufficiently in advance of placing bituminous mix to permit drying, but do not apply tack coat so far, : Keep the tack coat surface free from traffic until the subsequent layer of bituminous hot mix has, material when measured. 300-10 11 Basis of Payment. There is no direct payment for theThe work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/3000900ind.pdf?sfvrsn=136aca0_1

Special Provisions Workbook FY 2024-25

PROVISIONS, AND SITE OF WORK. (REV 6-16-21) (FA 8-2-21) (FY 2024-25) SP0020400 All Jobs (Add, - EXAMINATION OF PLANS, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK (60 DAY AD). (REV, RECORDS (REV 10-17-16) (FA 10-24-16) (FY 2024-25) SP0030900 All Jobs. SCOPE OF THE WORK - INTENT, . SCOPE OF THE WORK (LUMP SUM). (REV 6-3-16) (FA 6-9-16) (FY 2024-25) SP0040100LS All Lump Sum Projects. CONTROL OF THE WORK (LUMP SUM). (REV 3-15-02) (FY 2024-25) SP0050101LS Lump Sum Projects

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/workbook/special-provisions-workbook-fy-2024-25.pdf?sfvrsn=62cb5ee0_1

4550300.FHWA

structures adjacent to the work and/or for other reasons the Contractor proposes. 455-5.2 Underwater, penetration, the Department will pay the costs for such removal as Unforeseeable Work. 455-5.10 Preformed, the Contractor demonstrates that such work is necessary to achieve the required penetration without, for the grouting work as Unforeseeable Work. 4550300 All Jobs 455-5.11 Bearing Requirements, capacity. The Department will pay for all work in conjunction with redriving piles due to pile

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/fhwa/4550300.fhwa.pdf?sfvrsn=47362d2e_0

SunRail Phase 2 Property Value Analysis

revenue from all the station areas. Tax revenue growth was often driven by new multifamily and mixed, by determining why new TODs were placed in a particular station area. Evidence suggests a mix, ), the area’s predisposition to TOD (i.e. neighborhood setting, land use mix, and infrastructure, homes to multifamily and mixed-use apartments Displaying multiple metrics, Table 5 presents changes, notable shifts in 15 development patterns from single-family homes to multifamily and mixed-use

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/transit/documents/sunrail-phase-2-property-value-analysis.pdf?sfvrsn=36e8fb36_2

Special Provisions Workbook FY 2023-24

, SPECIFICATIONS, SPECIAL PROVISIONS, AND SITE OF WORK. (REV 6-16-21) (FA 8-2-21) (FY 2023-24) Insert, , SPECIFICAITONS, SPECIAL PROVISIONS, AND SITE OF WORK (60 DAY AD). (REV 6-16-21) (FA 8-2-21) (FY, to: 3-9. SP0030900 All Jobs. SCOPE OF THE WORK - INTENT OF CONTRACT. (REV 10-25-21) (FA 1-26-22, Sum. SCOPE OF THE WORK (LUMP SUM). (REV 6-3-16) (FA 6-9-16) (FY 2023-24) Insert Information Required. Changes to: 4-1, 4-3.1, 4-3.4, 4-3.9.4. SP0040100LS Lump Sum Projects. CONTROL OF THE WORK

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/workbook/special-provisions-workbook-fy-2023-24.pdf?sfvrsn=c77fff35_1

0090201int

the index difference at the time work was performed. For asphalt concrete items payable by the ton or square yard, the number of gallons will be determined assuming a mix design with 6.25% liquid, , the number of gallons will be determined assuming a mix design with 3% liquid asphalt weighing 8.58

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/internal/0090201int.pdf?sfvrsn=f854a008_1

0090201ind

the index difference at the time work was performed. For asphalt concrete items payable by the ton or square yard, the number of gallons will be determined assuming a mix design with 6.25% liquid, , the number of gallons will be determined assuming a mix design with 3% liquid asphalt weighing 8.58

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/0090201ind.pdf?sfvrsn=b2bf795e_1

0090021SP

and for performing all work contemplated and embraced under the Contract; also for all loss or damage arising out of the nature of the work or from the action of the elements, or from any unforeseen difficulties or obstructions which may arise or be encountered in the prosecution of the work until its, of work contained in the proposal, except as might be specifically provided otherwise in the basis, for the complete item of work, including all requirements of the Section specifying such item of work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2005/january-2005/workbook/0090021sp.pdf?sfvrsn=7d97d043_0

SPM7090000-723-i18601

the manufacturer’s recommended mixing ratio between the components in a thorough and consistent manner, and acceptance of the work. The longitudinal pavement markings shall show no signs of failure due, by the Engineer, based on the amount of work done or completed. Ensure the certification of quantities consists, will be full compensation for all work specified in this Section, including, all cleaning, to complete the work. Final payment will be withheld until all deficiencies are corrected. Payment

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/maintenance/finalized/spm7090000-723-i18601.pdf?sfvrsn=4601eb84_2

SPM7090000-122

the manufacturer’s recommended mixing ratio between the components in a thorough and consistent manner, and acceptance of the work. The longitudinal pavement markings shall show no signs of failure due, , based on the amount of work done or completed. Ensure the certification of quantities consists, will be full compensation for all work specified in this Section, including, all cleaning and preparing, to complete the work. Final payment will be withheld until all deficiencies are corrected. Payment

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/maintenance/finalized/spm7090000-122.pdf?sfvrsn=7e38e9cd_2

SPM7090000-722-i17971

the manufacturer’s recommended mixing ratio between the components in a thorough and consistent manner, and acceptance of the work. The longitudinal pavement markings shall show no signs of failure due, , based on the amount of work done or completed. Ensure the certification of quantities consists, will be full compensation for all work specified in this Section, including, all cleaning and preparing, to complete the work. Final payment will be withheld until all deficiencies are corrected. Payment

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/maintenance/finalized/spm7090000-722-i17971.pdf?sfvrsn=7c002e35_2

SPM7090000-721

the manufacturer’s recommended mixing ratio between the components in a thorough and consistent manner, and acceptance of the work. The longitudinal pavement markings shall show no signs of failure due, , based on the amount of work done or completed. Ensure the certification of quantities consists, will be full compensation for all work specified in this Section, including, all cleaning and preparing, to complete the work. Final payment will be withheld until all deficiencies are corrected. Payment

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/maintenance/finalized/spm7090000-721.pdf?sfvrsn=c9b9ecb4_2

SP7090000-i16464

. 3. Capable of providing the manufacturer’s recommended mixing ratio between the components, completion and acceptance of the work. The longitudinal pavement markings shall show no signs, by the Engineer, based on the amount of work done or completed. Ensure the certification of quantities, and payment will be full compensation for all work specified in this Section, including, all cleaning, necessary to complete the work. Final payment will be withheld until all deficiencies are corrected

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/maintenance/finalized/sp7090000-i16464.docx?sfvrsn=9d66b672_2

SP7090000

. 3. Capable of providing the manufacturer’s recommended mixing ratio between the components, completion and acceptance of the work. The longitudinal pavement markings shall show no signs, by the Engineer, based on the amount of work done or completed. Ensure the certification of quantities, and payment will be full compensation for all work specified in this Section, including, all cleaning, necessary to complete the work. Final payment will be withheld until all deficiencies are corrected

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2020/july-2020/maintenance/finalized/sp7090000.docx?sfvrsn=f3c32372_2

SS7090000

to 60% embedment. (c) capable of providing the manufacturer’s recommended mixing ratio between, with the satisfactory completion and acceptance of the work. The pavement markings shall show no signs of failure, of work done or completed. Ensure the certification of quantities consists of the following, of Payment. Prices and payments will be full compensation for all work specified in this Section, , and all incidentals necessary to complete the work. Final payment will be withheld until all

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2012/january-2012/workbook/ss7090000.pdf?sfvrsn=b8a45db7_0

4500000.FHWA2

for performing daily Quality Control (QC) inspections of all phases of work ensuring all materials, and differences cannot be justified while work is in progress, recalibrate the equipment. Also verify, prestressing strand, use those cast from concrete of the same mix design as used in the prestressed, first. Make arrangements for heating, covering, insulating or housing the concrete work in advance, for temperature requirements and special measures for mixing concrete in hot weather. Apply fog mist

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/fhwa/4500000.fhwa2.pdf?sfvrsn=a835bd6_0

SP3300802.comm

 SP3300802 HOT MIX ASPHALT - GENERAL CONSTRUCTION REQUIREMENTS COMMENTS FROM INTERNAL/INDUSTRY REVIEW Allison Black Work Phone: allison.black@dot.state.fl.us Comments: (1-5-18) 1. Define all, and FC-12.5 on previous projects with laser profile requirements and no mention of either mix within, to this spec, simply call for their FC work. If it ends up costing time, you are simply delaying the project. We need to work together to find a better way to do this. The 10 days before we start and 10 days

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/comments-responses/sp3300802.comm.pdf?sfvrsn=fef0b586_0

SS6900000

approval for the removal process before beginning any removal work. These requirements do not apply, the Engineer’s approval for the removal process before beginning any removal work. Accomplish, concrete mix or concrete pavement mix so as to restore the roadway to the satisfaction, General: The quantities to be paid for will be measured in accordance with the different work tasks required in this Section. The Contract unit price for each different work task as specified

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2011/january-2011/workbook/ss6900000.pdf?sfvrsn=4f271589_0

SS6900000

approval for the removal process before beginning any removal work. These requirements do not apply, the Engineer’s approval for the removal process before beginning any removal work. Accomplish, concrete mix or concrete pavement mix so as to restore the roadway to the satisfaction, General: The quantities to be paid for will be measured in accordance with the different work tasks required in this Section. The Contract unit price for each different work task as specified

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2012/january-2012/workbook/ss6900000.pdf?sfvrsn=bd6dc329_0
20 of 1779 results