4220 search results for drainage

OOD23-01e

Management Engineers, District Drainage Engineers, District Materials Engineers, District

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/bulletins/ood23-01e.pdf?sfvrsn=bc8712ec_1

E50D4

drainage and outfall ditches in Volusia County. Scope includes removal of vegetation and debris

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2024/may07/e50d4.pdf?sfvrsn=de9d4e54_1

E3X97-R0

Contract in Leon County consists of litter removal and mowing of drainage outfall ditches. Work may

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2024/may09/e3x97-r0.pdf?sfvrsn=d07c1e06_1

E8V30-R0

vegetation control associated with off-road assets such as fence-lines, sound-walls, drainage

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/may14/e8v30-r0.pdf?sfvrsn=786bc892_1

E1X31-R0

. Call Order: 007 Proposal: E1X31-R0 ALT Item Description Unit Quantity Section 0001 CLEAN DRAINAGE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2024/aug15/e1x31-r0.pdf?sfvrsn=f793c999_1

E21K8-R0

inside a pipe or box culvert to restore maximum drainage capacity. As directed by the Engineer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2024/sep11/e21k8-r0.pdf?sfvrsn=ea1c50f3_1

Exhibit 907-1

SURVEY 11 DRAINAGE MAP 10 STORMWATER FACILITIES 7 - 9 6 ROADWAY PLAN-PROFILE PROJECT CONTROL 4 - 5

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/exhibit-907-1.pdf?sfvrsn=a2e6cb40_1

D. Van Leuven-Resume

: Signalization, Minor Drainage Improvements, Curb & Gutter, Sidewalk both 4 and 6 inch, widening for turn, ) in Wakulla County. This project also consisted of signing and pavement markings and minor drainage, construction, (ADA), guardrail and drainage improvements, signing and pavement marking, and resurfacing, extensive drainage improvements including construction of a concrete box culvert, 490021 and 490022, drainage and safety upgrades, telemetered traffic monitoring site, roadway

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/constadm/drb/resume/d-van-leuven-resume.pdf?sfvrsn=391ea6cf_1

400-011

Note 6) And PVC Drain Drainage Layer Tolerance) 6" Cl. (± 2" D e p t h ) ( T o e V a r, Slab in to be included in the Contract Unit Price for Concrete drain pipes, drainage layer, edge of Drain Pipe a minimum of 2'-0" from wall joints. at 10 ft. max. spacing (when Drainage Layer, with Specification 514. wall heights 3 ft. and higher. Wrap drainage layer as shown, with 6. Provide

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/400-011.pdf?sfvrsn=1b3b29c0_1

425-060

. 4 1 425-060 BACK OF SIDEWALK DRAINAGE 11/01/20 TYPE C (MODIFIED) INLET (Pipe Connection, 6 ' ) Unsupported Edge 3'-4" 2" Cover 4 2 425-060 BACK OF SIDEWALK DRAINAGE 11/01/20 SLAB, the ¡) or Flatter 2 1 Sod Slopes 1: 1 4 3 425-060 BACK OF SIDEWALK DRAINAGE 11/01/20 C (CY, 425-060 BACK OF SIDEWALK DRAINAGE 11/01/21

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/425-060.pdf?sfvrsn=b14f51d0_1

522-001

Index 522-002 For Joints PT PT See Index 522-002 for Joints A G A A PT A A Drainage Inlet Drainage Inlet A Strip Utility Sidewalk Sidewalk Clear Width 9" 9 " 45° Sidewalk G, D- " Formed Open Joints 8 1 C- " Dummy Joints, Tooled 8 1 B- (e.g. drainage inlets, - (e.g. drainage inlets and utility poles). driveways, sidewalk-intersections, and all other fixed

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/522-001.pdf?sfvrsn=7f31a9d5_1

Roadway Criteria

Previous Next Roadway Design Office Standard Plans Drainage Design

https://www.fdot.gov/roadway/cs/cs.shtm

2025FDM908DrngXSections

of construction activities (4) Overland flow drainage patterns (5) Areas of soil disturbance (6) Areas which

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/review/2025fdm908drngxsections.pdf?sfvrsn=a4845e0b_3

Exhibit 907-1

SURVEY 11 DRAINAGE MAP 10 STORMWATER FACILITIES 7 - 9 6 ROADWAY PLAN-PROFILE PROJECT CONTROL 4 - 5

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/exhibit-907-1.pdf?sfvrsn=493892fc_1

Staff Directory

ACTIVE STATE OF EMERGENCY As Florida prepares for Hurricane Helene, the Florida Department of Transportation (FDOT) has suspended interstate lane closures and operations on active construction projects within the projected path. Contractors on these construction projects are currently securing work sites, clearing traffic control devices that are not actively being used to direct traffic, and checking drainage systems. Visit FloridaDisaster.org for the latest storm

https://www.fdot.gov/projects/jenkinsroadproject/staff-directory

Email Updates

ACTIVE STATE OF EMERGENCY As Florida prepares for Hurricane Helene, the Florida Department of Transportation (FDOT) has suspended interstate lane closures and operations on active construction projects within the projected path. Contractors on these construction projects are currently securing work sites, clearing traffic control devices that are not actively being used to direct traffic, and checking drainage systems. Visit FloridaDisaster.org for the latest storm

https://www.fdot.gov/projects/jenkinsroadproject/email-updates

ERS102020

as ERS Density Embankment on a Drainage logbook. A new sample with the correct key fields must

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/materials/mac/training/ers/pa-ers/ers102020.pdf?sfvrsn=a53796ad_3
20 of 4220 results