707 search results for bridge maintenance

Future AM July 2026

Roads 2027 E2Z80-R0 * 7.0 10/1/2020 9/30/2027 1 Districtwide Structure (Bridge and Non-Bridge) Inspection and Maintenance 2027 E1U99 5.0 11/1/2022 10/30/2027 4 Martin, St. Lucie, Palm Beach & Broward US 1 and A1A Structures (bridge and non-bridge) 2027 E4T64-R0 * 8.0 11/1/2019 10/30/2027 7 Districtwide Structures (Bridge and Non-Bridge) Inspection and Maintenance 2027 E7P33 5.0, 1/28/2028 6 Districtwide Movable Bridge Inspection & Maintenance 2027 E6N26-R0 * 7.0 2/1/2021

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/maintenance/future-am-july-2026.pdf?sfvrsn=befbcec_1

2027FDM133DocRetention

Time Correspondence Unpaid Bills Utility Maintenance Records Groups Bridge Plans and Specifications Bridge Record Bridge Working Drawings Correspondence Geotechnical High Mast Record, and Specs CD - Revisions CD - Cat II Bridge As- Built Files Files stored in the PEDDS Database

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/review/2027fdm133docretention.pdf?sfvrsn=fbbd5af_2

E3Y94

Letting: 03260709 Call Order: 001 Proposal: E3Y94 District:03 Counties: FRANKLIN Road Name: - BRIDGE, Length: Contract Days: 135 Total Bridge Length: Letting Date: 07/09/26 Total Proposal Length: 0, advertisement Description: Improvements under this District Contract consist of bridge repair and rehabilitation on SR30 (US 98) over Apalachicola River Bridge No. 490031. Work includes joint replacements, bridge painting, fender repair as well as barrier wall repair, and any additional work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2026/jul09/e3y94.pdf?sfvrsn=bc38e8cc_1

E22D6-R0

 Florida Department of Transportation Bid Solicitation Notice and Approximate Quantities Letting: 02261021 Call Order: 001 Proposal: E22D6-R0 District:02 Counties: ALACHUA, BRADFORD Road Name: Alachua and Bradford County Edging and Sweeping Limits: Midpoint Project(s): 41021347289(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000, , weeds, soil, litter, etc.). Mobilization and Maintenance of Traffic are incidental to the pay

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2026/oct21/e22d6-r0.pdf?sfvrsn=b1e9afa3_1

SPI-635-005

 Standard Plans Instructions Topic No. 625-010-003 Index 635-005 Fiber Optic Splice Vault FY 2027-28 1 Index 635-005 Fiber Optic Splice Vault Design Criteria AASHTO Standard Specification for Highway Bridges and AASHTO LRFD Bridge Design Specifications Design Assumptions and Limitations Index 635-005 provides requirements for installation of partially buried Fiber Optic Splice Vaults, and maintenance vehicles, Index 635-005 is designed for AASHTO H-20 loadings. At the discretion

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2028/spi/spi-635-005.pdf?sfvrsn=90c712d3_1

FastFacts-428271-2

/innovation/FRP.shtm Project Name: SR-A1A (SR 5A) from Bridge of Lions to Charlotte Street FPID, maintenance repairs. Describe New Approach: The new approached employs the use of GFRP reinforcement, eliminating future corrosion and concrete delamination, and saving costly maintenance repairs, , and saving future maintenance cost. Project Start Date/Substantial Completion Date: 6/15/2026 – 7/23/2027

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/structures/innovation/fastfacts/fastfacts-428271-2.pdf?sfvrsn=4e71490a_1

CM Small Business Program

Search Construction and Maintenance Small Business Certification To work on a designated small business contract, every business must be certified, " means a business with yearly average gross receipts of l ess than $25 million for road and bridge, Business Affidavit Certified Small Business Construction & Maintenance Directory Small Business

https://www.fdot.gov/BusinessGrowth/small-business-program.shtm

HAMILTON COUNTY_TWP2027-2031 WPPH_BY DESCRIPTION_04-01-2026_SUBJECT TO CHANGE

Bridge/Roadway/Contract Maintenance State $22,843 $23,597 $24,376 $25,529 Total for Project 455995-1, MAINTENANCE Phase Funding Source 2027 2028 2029 2030 2031 Bridge/Roadway/Contract Maintenance, : ROUTINE MAINTENANCE Phase Funding Source 2027 2028 2029 2030 2031 Bridge/Roadway/Contract Maintenance, Source 2027 2028 2029 2030 2031 Bridge/Roadway/Contract Maintenance State $79,907 $61,634 $63,485, $7,598,850 413523-1 - D2-HAMILTON COUNTY TRAFFIC SIGNAL MAINTENANCE AGREEMENT Type of Work

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/2025-wp-hearing-docs/updated-5-14-2026/by-description/hamilton-county_twp2027-2031-wpph_by-description_04-01-2026_subject-to-change.pdf?sfvrsn=c21a785_1

HAMILTON COUNTY_TWP2027-2031 WPPH_BY ITEM_04-01-2026_SUBJECT TO CHANGE

Funding Source 2027 2028 2029 2030 2031 Bridge/Roadway/Contract Maintenance State $300,000 $300,000, Phase Funding Source 2027 2028 2029 2030 2031 Bridge/Roadway/Contract Maintenance State $50,000, 2029 2030 2031 Bridge/Roadway/Contract Maintenance State $79,907 $61,634 $63,485 Total for Project, Bridge/Roadway/Contract Maintenance State $22,843 $23,597 $24,376 $25,529 Total for Project 455995-1, - D2-HAMILTON COUNTY TRAFFIC SIGNAL MAINTENANCE AGREEMENT Type of Work: TRAFFIC CONTROL DEVICES/SYSTEM

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/2025-wp-hearing-docs/updated-5-14-2026/by-segment/hamilton-county_twp2027-2031-wpph_by-item_04-01-2026_subject-to-change.pdf?sfvrsn=9ec28310_1

2027FDM250HydraulicData

250 Hydraulic Data and Agency Permits 250.1 General A Bridge Hydraulic Report (BHR) includes the following, as applicable: • Bridge Hydraulics Recommendation Sheet, • Bridge hydraulic, No. 625-040-002). 250.1.1 Bridge Hydraulic Recommendation Sheet (BHRS) Prepare the Bridge Hydraulic, and for major widening of an existing bridge structure. See the Structures Design Guidelines, Design Engineer. Design bridges and bridge culverts to withstand the design flood without damage

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/review/2027fdm250hydraulicdata.pdf?sfvrsn=6b8fb56b_1

OOM_20260608_future-am-contract-list-June-2026

* 7.0 10/1/2020 9/30/2027 1 Districtwide Structure (Bridge and Non-Bridge) Inspection and Maintenance 2027 E1U99 5.0 11/1/2022 10/30/2027 4 Martin, St. Lucie, Palm Beach & Broward US 1 and A1A Structures (bridge and non-bridge) 2027 E4T64-R0 * 8.0 11/1/2019 10/30/2027 7 Districtwide Structures (Bridge and Non-Bridge) Inspection and Maintenance 2027 E7P33 5.0 11/1/2022 10/31/2027, Districtwide Movable Bridge Inspection & Maintenance 2027 E6N26-R0 * 7.0 2/1/2021 1/31/2028 4 Year

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/maintenance/cont/am/oom_20260608_future-am-contract-list-june-2026.pdf?sfvrsn=a9a8bbae_1

E4Y76-R0BidTabs

SWEEPING - ROUTINE MAINTENANCE 45832417201 (*) N/A Page 1 of 1 09/04/2026 Florida Department, . PLEASE READ STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION FY 2026-27 (SECTION 7-13, No: TREASURE COAST SWEEPING - ROUTINE MAINTENANCE N/A Contract Descr: Unit Price Quantity Line

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/bidtabs/2026/sep04/e4y76-r0bidtabs.pdf?sfvrsn=19524612_1

2027FDM103Forms

of Bridge (a) ….………………... Select Status (3) Maintenance of Traffic Requirements, Financial Project ID: Federal Aid No. Local Agency: Project Description: Bridge No.: MAINTENANCE, on the use of each form. Forms: • 110……….. Proprietary Product Certification • 121-A……..Bridge, ……..Project Traffic • 131……….. Sample Local Agency Maintenance Agreement for Work Performed, 121-A Bridge Development Report Submittal Checklist Topic #625-000-002 FDOT Design Manual January

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/review/2027fdm103forms.pdf?sfvrsn=387ab017_2

E6Q04-R0BidTabs

( ) indicates item is bid as Lump Sum 0001 (BRIDGE DECK MAINTENANCE AND REPAIR (SF SECTION: 0005 0102, CONSTRUCTION, INC Units ( ) indicates item is bid as Lump Sum 0001 (BRIDGE DECK MAINTENANCE AND REPAIR (SF, as Lump Sum 0001 (BRIDGE DECK MAINTENANCE AND REPAIR (SF SECTION: 0105 E700 46 33 REPAIR EXISTING, 500.00000 2,500.00 $383,100.00 $226,640.00 $266,625.00 Section Totals: 0001 BRIDGE DECK MAINTENANCE, is bid as Lump Sum 0001 (BRIDGE DECK MAINTENANCE AND REPAIR (SF SECTION: 0005 0102 14 TRAFFIC

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d6/bid-tabs/2026/mar26/e6q04-r0bidtabs.pdf?sfvrsn=931ff592_1

OOM_20260821_EmergencyRoadUsePermitLetter_EmergencyOrder_26-05

on the Permit Office website at https://www.fdot.gov/maintenance/owodpermits.shtm . The hauler, Gross Vehicle Weight for vehicles equipped with five (5) weight-bearing axles with outer bridge, thousand (90,000) pounds. Axle weight restrictions are as follows when operating under Bridge, : F85072F2-63CC-895E-83C8-E3EA01C9DED3 Axle weight restrictions are as follows when operating under Bridge, Weight for vehicles equipped with five (5) weight-bearing axles with outer bridge spans of not less

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/maintenance/str/owodp/oom_20260821_emergencyroadusepermitletter_emergencyorder_26-05.pdf?sfvrsn=66af99d4_1

01_ALL COUNTIES_TWP2027-2031 WPPH_BY ITEM_04-01-2026_SUBJECT TO CHANGE

: ROUTINE MAINTENANCE Phase Funding Source 2027 2028 2029 2030 2031 Bridge/Roadway/Contract Maintenance, : ROUTINE MAINTENANCE Phase Funding Source 2027 2028 2029 2030 2031 Bridge/Roadway/Contract, Bridge/Roadway/Contract Maintenance State $100,000 $100,000 $100,000 $100,000 $100,000 Total, Phase Funding Source 2027 2028 2029 2030 2031 Bridge/Roadway/Contract Maintenance State $175,000, COUNTY Type of Work: ROUTINE MAINTENANCE Phase Funding Source 2027 2028 2029 2030 2031 Bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/2025-wp-hearing-docs/updated-5-14-2026/by-segment/01_all-counties_twp2027-2031-wpph_by-item_04-01-2026_subject-to-change.pdf?sfvrsn=98484b5d_1

TAYLOR COUNTY_TWP2027-2031 WPPH_BY DESCRIPTION_04-01-2026_SUBJECT TO CHANGE

/SYSTEM Phase Funding Source 2027 2028 2029 2030 2031 Bridge/Roadway/Contract Maintenance State $43,436, Bridge/Roadway/Contract Maintenance State $71,690 $73,481 $76,056 Total for Project 414414-1, of Work: ROUTINE MAINTENANCE Phase Funding Source 2027 2028 2029 2030 2031 Bridge/Roadway/Contract, MAINTENANCE Type of Work: ROUTINE MAINTENANCE Phase Funding Source 2027 2028 2029 2030 2031 Bridge, MAINTENANCE - SECURITY SYSTEM DESIGN/INSTALLATION Type of Work: FIXED CAPITAL OUTLAY Phase Funding

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/2025-wp-hearing-docs/updated-5-14-2026/by-description/taylor-county_twp2027-2031-wpph_by-description_04-01-2026_subject-to-change.pdf?sfvrsn=7666d74f_1

TAYLOR COUNTY_TWP2027-2031 WPPH_BY ITEM_04-01-2026_SUBJECT TO CHANGE

MAINTENANCE Type of Work: ROUTINE MAINTENANCE Phase Funding Source 2027 2028 2029 2030 2031 Bridge, MAINTENANCE Phase Funding Source 2027 2028 2029 2030 2031 Bridge/Roadway/Contract Maintenance State, 2031 Bridge/Roadway/Contract Maintenance State $43,436 $44,869 $46,349 $47,844 Total for Project, MAINTENANCE SECURITY UPGRADES Type of Work: FIXED CAPITAL OUTLAY Phase Funding Source 2027 2028 2029 2030 2031 Construction State $80,000 Total for Project 213936-6 $80,000 445030-9 - PERRY MAINTENANCE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d2_documents/2025-wp-hearing-docs/updated-5-14-2026/by-segment/taylor-county_twp2027-2031-wpph_by-item_04-01-2026_subject-to-change.pdf?sfvrsn=d81b42ab_1

E3Y94BidTabs

100.00% Responsive Winning bid 2 SOUTHERN ROAD & BRIDGE, LLC $3,571,327.00 103.14% Responsive Non, : 001 Contract Desc: FRANKLIN E3Y94 Project(s): Contract: Contract Time: Vendor Ranking - BRIDGE, of bridge repair and rehabilitation on SR30 (US 98) over Apalachicola River Bridge No. 490031. Work includes joint replacements, bridge painting, fender repair as well as barrier wall repair, and any additional work to rehabilitate Bridge No. 490031. All work is to be done in Franklin County. PRE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/bidtabs/2026/jul09/e3y94bidtabs.pdf?sfvrsn=43a7d581_1

E59F6BidTabs

$7,301,950.40 100.00% Responsive Winning bid 2 SOUTHERN ROAD & BRIDGE, LLC $9,944,168.10 136.19, and 700117 and the addition of riprap to Bridge #700031. Total work length is consisting of approximately, (2) SOUTHERN ROAD & BRIDGE, LLC (3) GLF CONSTRUCTION CORPORATION Units ( ) indicates item, 130,250.00 188.00000 97,948.00 120.00000 62,520.00 0020 0465 2107 MOVABLE BRIDGE MACHINERY & CASTING, 80,000.00 0025 0465 2401 MOVABLE BRIDGE MACHINERY & CASTING-REHABILITATION, RECONDITION, SPEED

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/bid-tabs/2026/may05/e59f6bidtabs.pdf?sfvrsn=85a4bdf3_1
20 of 707 results
Top