13229 search results for DESIGN

Grants

was established to provide funding to designated official planning agencies to assist the Commission

https://www.fdot.gov/ctd/grants

FDOT Office of Right of Way

their designated counties and a Turnpike Enterprise with responsibility for toll roads. Each district office

https://www.fdot.gov/rightofway/default.shtm

District 6

Type of Contract Contract Project Estimate Letting DateResponse Date Description Professional Services 20646 $300,000.00 10/7/19 SR A1A/COLLINS AVE. FROM 4700 BLOCK TO 5800 BLOCK. Major Work Types 13.4 and 13.5 Minor Work Types 3.1 Minor Highway Design, 6.1 Traffic Engineering Studies,2.0 PD&E Studies. Professional Services 20651 $1,500,000.00 11/4/19 Districtwide ROW Mapping & Survey (Maps) Major: 8.4; Minor: N/A Professional Services 20654 $191,000.00

https://www.fdot.gov/contracts/district-offices/d5/lettings/dist-letting-project-info.shtm/lists/bdi-reserved-contracts1/district-6

646-001IndReviewResponse

 Industry Review Comments and Responses FDOT – Standard Plans 1 Index 646-001 Aluminum Post and Pedestal Mounted Pedestrian Detectors and Signals ORIGINATION Date: May 25, 2023 Name: Rick Jenkins Phone: (850) 414-4355 Email: Rick.Jenkins@dot.state.fl.us COMMENTARY Note 6 was added because of new spread footing design in Standard Plans Index 700-120. COMMENTS AND RESPONSES BLACK = Industry Review Comments BLUE = Standard Plans Response GREEN = Change Made to Index Name: Bijan

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2025/646-001indreviewresponse.pdf?sfvrsn=53bf7ce5_1

2024FDM905RdwyXSections

 Topic #625-000-002 FDOT Design Manual 905 - Roadway Cross Sections 905 Roadway Cross Sections 905.1 General Cross sections depict the existing ground and manmade features, and proposed, (PSEE) within the Design Development Documentation Module (see FDM 111.7 ) See Exhibit 905-1, be the mainline, side streets, then ramps. Topic #625-000-002 FDOT Design Manual 905 - Roadway Cross, is not required. Topic #625-000-002 FDOT Design Manual 905 - Roadway Cross Sections Exhibit 905-1

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm905rdwyxsections.pdf?sfvrsn=a742c7bb_1

2024FDM920SoilSurvCorBor

 Topic #625-000-002 FDOT Design Manual 920 - Soil Survey Sheet and Boring Coring Data 920 Soil Survey Sheet and Boring Coring Data 920.1 General This chapter provides the requirements, ) generated from the FDOT Topic #625-000-002 FDOT Design Manual 920 - Soil Survey Sheet and Boring, #625-000-002 FDOT Design Manual 920 - Soil Survey Sheet and Boring Coring Data Exhibit 920-1: Roadway Soil Survey Topic #625-000-002 FDOT Design Manual 920 - Soil Survey Sheet and Boring Coring Data

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdm920soilsurvcorbor.pdf?sfvrsn=d8d36fbb_1

Exhibit 920-1

 THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY: ON THE DATE ADJACENT TO THE SEAL PRINTED COPIES OF THIS DOCUMENT ARE NOT CONSIDERED SIGNED AND SEALED. THE SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES. SOIL SURVEY, INC. 321 EAST 2ND STREET TALLAHASSEE, FL 32301 LEIA I. CROSSWELL, P.E. NO. 99995 SURVEY ENDS STA. : SURVEY BEGINS STA. : MATERIALS AND RESEARCH DEPARTMENT OF TRANSPORTATION STATE OF FLORIDA CROSS SECTION SOIL SURVEY FOR THE DESIGN OF ROADS FINANCIAL

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/exhibit-920-1.pdf?sfvrsn=ee5fe252_1

3 - Project Development Process_I95

 PROJEC T D EVELOPMENT PROCESS PLANNING DESIGN RIGHT‐OF ‐WAY ACQUISITION PROJECT DEVELOPMENT & ENVIRONMENT (PD&E) STUDY CONSTRUCTION MAINTENANCE Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Phase 6 P U B L I C I N V O L V E M E N T What is a Pro j ect Development and Env ironment (PD&E) Study? o A pro cess followed by FDOT t o eva l u ate:  Engineering Alternatives  Env iro n m e ntal Impacts  Social, Cultural and Economic impacts associated with a planned

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/i95broward/3---project-development-process_i95.pdf?sfvrsn=beaf20c3_1

2023 WP Hearing Presentation FINAL

Status • PD&E is underway • Design in 2025 • Construction in 2027 • Cost - $203 million SR, Project Status: • Design is underway • Construction in 2026 • Cost - $16 million Replacement Project Status: • PD&E in 2024 • Design in 2026 • Construction in 2030 • Cost - $659 million SR, SUGARLOAF KEY MULTIMODAL TRAIL PROJECT 440909 - 2 Status: • Design is underway • Construction in 2028, PROJECT 450733 - 1 Status: • Design is underway • Construction in 2024 • Cost - $5.5 million

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/d6_documents/2023-wp-hearing-presentation-final.pdf?sfvrsn=cc0467cf_3

Al Aponas DRB Resume

: bid-build, design-build, CMGC and Progressive D-B delivery projects. Extensive operational experience, to contractors, engineers and owners. Services include management of Design Build pursuits, strategies and innovated solutions that resulted in being shortlisted over 25 FDOT design-build projects, of 25 design build pursuits with project values up to $350 million. • Proficient in all aspects

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/constadm/drb/resume/al-aponas-drb-resume.pdf?sfvrsn=5515cbb6_1

E21F5-RFP-Addendum01Summary-12-8-23

 Page 1 of 1 SR 212 (Beach Blvd.) from Cedar Swamp Creek to Brougham Avenue Drainage Improvements Duval County, Florida Financial Project Number(s): 432849-1-52-01 & 432849-1-52-02 Federal Aid Project Number(s): D221-013-B Contract Number: E21F5 Addendum #1 – December 8, 2023 RFP Revisions: Page Revision 5 Removed language related to exotic plants. 6-7 Updated Schedule of Events. 34 Removed pavement marking eradication language. 34-35 Removed detour design language. Bid

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/design-build/e21f5/e21f5-rfp-addendum01summary-12-8-23.pdf?sfvrsn=9931d77d_1

MANUEL (Manny) AGUIAR DRB RESUME v.012023

“Bid-Build” Projects) to conceptual (alternative procurement such as “Design-Build” Projects). 1997, (conventional “Bid-Build” Projects) to conceptual (alternative procurement such as “Design-Build, and Owners. 2 EDUCATION ARCHITECTURAL & ENGINEERING DESIGN MIAMI-DADE COMMUNITY COLLEGE CIVIL, DESIGN STANDARDS • CONTRACT MANAGEMENT • DESIGN BUILD CONTRACTS • HEAVY HIGHWAY CONSTRUCTION, and coordination. Removal and relocation of gas, water, power and other utilities. Design

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/constadm/drb/resume/manuel-(manny)-aguiar-drb-resume-v-012023.pdf?sfvrsn=f6c0c2fe_3
20 of 13229 results