1066 search results for curb ramp

LAP120-725

with the construction of mainline traffic bearing applications such as pavement lanes, turn lanes, ramps, parking lots, block, concrete slab, sidewalk, curb and gutter, etc., excavated in the removal of existing pavements, such as pavement lanes, turn lanes, ramps, parking lots, concrete box culverts, emergency shoulder use

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/lap/lap120-725.pdf?sfvrsn=78975a5f_2

MAM_Applications Guide_20240628

to the system ramp between westbound US 192 and southbound US 27, which did not meet spacing, will allow for an acceleration lane for the US 192 ramp with taper, improving safety. The relocated, SR 570 southbound off-ramp should be replaced with a yield condition at the off-ramp intersection (the spacing should be measured from the end of the taper of the ramp furthest from the interchange, from the interchange ramp terminal to the east. After 1 2 3  Site 1 N 2 3 29 US 98

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/systems/systems-management/document-repository/access-management/mam_applications-guide_20240628.pdf?sfvrsn=8d12ea6c_1

TP-05-14-24BSN

Order: 001 Proposal: E8U46 District:08 Counties: ORANGE Road Name: PAINT BRIDGES ON RAMPS, , equipment and incidentals necessary for Adding Lanes, Drainage improvements, Curb & Gutter, SLABS LB 10,545.000 0425- 1-201 INLETS, CURB, TYPE 9, =14' OF CLEAR TRUNK EA 12.000 0590- 70- 5, on Florida's Turnpike (SR-91), Milepost (MP) 73.0 to 100.0, including ramps, feeder, and connector, , including ramps, feeder, and connector roads. NO PRE-BID CONFERENCE WILL BE HELD

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2024/may14/tp-05-14-24bsn.pdf?sfvrsn=bc5408ec_3

E8V33

of multiple ancillary structures, and the replacement of 6 bridges. Interchange (On/Off Ramp) modifications, 0425- 1-211 INLETS, CURB, TYPE 10, 10' EA 1.000 0425- 1-781 INLETS, MEDIAN BARRIER, TYPE 1, 10' EA

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/jan28/e8v33.pdf?sfvrsn=1cabb56e_1

441700-1 Cove Road PD&E October 2024 MPO Presentation

at Tres Belle to accommodate u-turns from South Fork Estates neighborhood and boat ramp • Segment, width of shared use path an pulling up next to curb through the constrained area 10 Project

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/cove-road-study/441700-1-cove-road-pd-e-october-2024-mpo-presentation.pdf?sfvrsn=568cf46c_1

TP-05-30-25BSN3

. These improvements consist of pavement reconstruction, guardrail, sidewalk, retaining wall and curb ramps. The summary of pay items for this project are listed in the Estimated Quantities Report. No Pre, WALL INDEX 400-011CY 34.100 0425- 1-311INLETS, CURB, TYPE P-1, 10'EA 1.000 0425- 1-341INLETS, CURB, TYPE P-4, 10'EA 1.000 0425- 1-361INLETS, CURB, TYPE P-6, 10'EA 1.000 0425- 2- 63MANHOLES, 0520- 1- 10CONCRETE CURB & GUTTER, TYPE FLF 2,963.000 0520- 3-VALLEY GUTTER- CONCRETELF 211.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/may30/tp-05-30-25bsn3.pdf?sfvrsn=39e1ad02_1

2026FDM913TypSect

for projects with bridges (new or widened) (3) Toll sites (4) Ramps and service roads, on widening projects. (12) Curb locations and types (show Type E or F Curb, not the dimension). (13, base course Type B- 12.5 only, indicate the asphalt curb pad on the typical section and include an asphalt base curb pad detail. (6) For resurfacing projects on curbed roadways where the milling, Traffic data is required only for mainline roadways and bridges and for ramps. Show the following

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm913typsect.pdf?sfvrsn=6dfc2157_4

44586715201-specs-(9)

............................................................................... 31 FPID(S):445867-1-52-01, ETC. -3- CONCRETE GUTTER, CURB ELEMENTS, AND TRAFFIC, crossings, Pedestrian Hybrid Beacons, milling and resurfacing, curb and gutter, sidewalk, drainage

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/guidance/44586715201-specs-(9).pdf?sfvrsn=24e59745_1

RStandardPlansFY2026-27

Skimmers for French Drain Outlets 522-002 Detectable Warnings and Sidewalk Curb Ramps 444-T01 Deep, 330-001 Paved and Graded Driveways 000-525 Ramp Terminals 350-001 Concrete Pavement Joints General, - Type J and P 102-606 Two-Lane Roadway, Lane Closure Using Temporary Traffic Signals 425-020 Curb Inlet Tops - Types 1, 2, 3 and 4 102-607 Mobile Operations 425-021 Curb Inlet Tops - Types 5 and 6 102-608 Two-Lane, Two-Way, Temporary Diversion Connection 425-022 Curb Inlet - Type 7 102-613

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/rstandardplansfy2026-27.pdf?sfvrsn=101e3d88_1

2024FDMPart1

be placed in the same locations as that of a curb ramp. Bicycle Way Any road, path, or way which by law, that the project is ready for the Plans, Specifications, and Estimates (PS&E) Submittal(s). Ramp A turning roadway that connects a Freeway to a crossing roadway within an interchange. The components of a ramp are a terminal at each leg and a connecting road. The geometry of the connecting road ramp usually

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/review/2024fdmpart1.pdf?sfvrsn=d253b296_1

D005011e.do

TYPICAL SECTION (CURB AND GUTTER)’, ‘6” WHITE 2”X4” SKIP’ – Dimension ‘2”x4” ’ deleted and 2’-4’ substituted. Index No. 17346 (Sheet 13 of 13), ‘INTERCHANGE RAMPS RURAL TYPICAL SECTION (PAVED

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2003/january-2003/workbook/d005011e.do.pdf?sfvrsn=91157942_0

2025FDM916DrainStruct

separators, sidewalks, curb ramps, driveways, and R/W lines. Show proposed bridges and approach slabs

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2025/2025fdm916drainstruct.pdf?sfvrsn=1761266d_3

E8V06

of providing all labor, materials, equipment and incidentals necessary for mainline and ramp new, improvements, guardrail placement, curb and gutter, sidewalk, signing and pavement markings, signal, -22 TN 542.900 0339- 1- MISCELLANEOUS ASPHALT PAVEMENT TN 1,205.900 0425- 1-351 INLETS, CURB, TYPE P-5, 10' EA 1.000 0425- 1-361 INLETS, CURB, TYPE P-6, 10' EA 4.000 0425- 1-543 INLETS, DITCH, PEDESTRIAN / BICYCLE RAILING, NS, 42" TYPE 1 LF 457.000 0520- 1- 7 CONCRETE CURB & GUTTER, TYPE E

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/may02/e8v06.pdf?sfvrsn=fac999d6_1

44787815201-PLANS 01-ROADWAY

EXIST. TYPE F CURB LANE BIKE 5' R/W VARIES (47.15' MIN.) R/W VARIES (50' MIN.) NATURAL GROUND, CURB 5' 5' 11' 11' 11' 22' 22' 27' 27' 12' LANE BIKE 5' STA. 537+23.65 TO STA. 1191+57.35, OPENING YEAR = 2025 AADT = 26,000 CURRENT YEAR = 2023 AADT = 24,000 CURB TYPE B SAWCUT ALL BASE TO 30" BELOW TOP OF CURB REMOVE EXIST. PAVEMENT INCLUDING CURB TYPE B SAWCUT TRAVEL LANES, TRAFFIC SEPARATOR TYPE I TYPE B CURB TWO-WAY DIRECTIONAL MEDIAN OPENING (NTS) 1.0' R 2 . 0

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26111/44787815201-plans-01-roadway.pdf?sfvrsn=28251b6e_1

December 2023 Target Zero Partner Update

to-date • Improvement types: • Sidewalk/curb ramp improvements • Signing/pavement markings • High-visibility crosswalks • Buffered bicycle lanes, bicycle conflict markings • Curb extensions • Re

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/targetzerodocs/december-2023-target-zero-partner-update.pdf?sfvrsn=21a99dc1_1

700-120

preformed joint filler required between sidewalk and spread or curb ramp where applicable. Maintain, installed in-line with sidewalk curb that results permitted where shown in the Plans. d. Sidewalk

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/700-120.pdf?sfvrsn=85b86a3b_1

700-120

preformed joint filler required between sidewalk and spread or curb ramp where applicable. Maintain, installed in-line with sidewalk curb that results permitted where shown in the Plans. d. Sidewalk

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/700-120.pdf?sfvrsn=63c12d64_1

fdot-bdv29-977-61-rpt

or percentages of the approach volume at each intersection and ramp. The users of Synchro, limits for different road classes (freeway, rural highway, expressway, weaving, system ramp, collector-distributor, ramp, minor arterial, major arterial, minor collector, major collector, local, of the on- ramps and off-ramps. Simulation models are flexible in modeling these operations and the impacts

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bdv29-977-61-rpt.pdf?sfvrsn=fc553b23_5

E50F1BidTabs

this Contract consist of, but not limited to, signalization, concrete pavement, curb & gutter, sidewalks, ADA ramps, signing & pavement markings, lighting, and ITS at the intersection of SR 15, 1 10 CONCRETE CURB & GUTTER, TYPE F 161.000 LF 85.00000 13,685.00 100.00000 16,100.00 0100 0522

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/bid-tabs/2024/feb06/e50f1bidtabs.pdf?sfvrsn=66d2ea84_1
20 of 1066 results