9204 search results for test
7090000.D01.FHWA
random samples of the materials in accordance with the Department’s Sampling, Testing and Reporting, of the glass spheres in accordance with ASTM D 1214 and the Department’s Sampling, Testing and Reporting, the right to test the markings within 3 days of receipt of the Contractor’s certification. Failure to afford the Department opportunity to test the markings will result in non-payment. The test readings, . Submit a certified test report to the Engineer indicating that the materials meet all requirements
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul09/files/7090000.d01.fhwa.pdf?sfvrsn=a634cfd5_023P-010 ATC Final Report Signed
determined ATC was compliant with the four required documentation areas and reports tested, in accordance, the period tested, CY 2022, ATC reported 92 active tenants. Attachment 2 shows a list of sites, available towers at the time of the audit. The testing results concluded with recommendations, with the Agreement for CY 2022. 2. If ATC was compliant with the four required documentation and reports tested, audit testing of the revenues reported by ATC. The quarterly revenue report contained data for each
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ig/reports/23p-010-atc-final-report-signed.pdf?sfvrsn=eef6ba0f_12012
with a valid driver’s license and designated by manufacturers of autonomous technology for testing, prior to testing an autonomous vehicle Limited liability of the vehicle manufacturer The Secretary
https://www.fdot.gov/contracts/district-offices/d5/lettings/dist-letting-project-info.shtm/lists/legislative-resources/f035e3c1-93e6-4663-acb1-bcbd768d6b2c7800000Comm
for Lightning Protection Systems and components, the Electrical Testing Laboratories (ETL), the National Electrical Testing Association (NETA),Institute of Electrical and Electronics Engineers
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan07/files/7800000comm.pdf?sfvrsn=c4012ba1_09160302.resp
supplier shall submit a sample to the State Materials Office for testing before use. A pretest number, Materials Office for testing before use. A pretest number will then be assigned by the State Materials
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul11/files/9160302.resp.pdf?sfvrsn=488ef40c_03370000.comm
at the preconstruction meeting. Anyone choosing the R squared option should be fully informed of how the testing, department acceptance. The declaration of what testing option the contractor has chosen should
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jan09/files/3370000.comm.pdf?sfvrsn=814aecd7_09160302.comm
supplier shall submit a sample to the State Materials Office for testing before use. A pretest number, Materials Office for testing before use. A pretest number will then be assigned by the State Materials
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul11/files/9160302.comm.pdf?sfvrsn=c711c70e_0SSM5750500resp
is allowed, and then only when absolutely necessary (as indicated by soil testing). As background, we, sampling or testing Response: Agree; change made
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/maintenance/comments-responses/ssm5750500resp.pdf?sfvrsn=76c26805_2SP4550000DB.comm
” after the numbering update. Likewise, the “100% Dynamic Testing” header has a reference to Note “4, time to the testing times indicated.” Class IV (Drilled Shaft) mix always have retarders, so it
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/comments-responses/sp4550000db.comm.pdf?sfvrsn=262c4acf_07000503.FHWA
within the clear zone, meet the crash testing requirements of NCHRP 350 or MASH 2009. SUBARTICLE, in accordance with Design Standards. For EDS within the clear zone, meet the crash testing requirements
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/fhwa/7000503.fhwa.pdf?sfvrsn=166e9da1_06820102.FHWA
testing procedures described in NEMA TS2, Sections 2.2.7, 2.2.8, and 2.2.9. All CCTV cameras, must perform all required functions during and after being subjected to the environmental testing
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/july-2018/review/fhwa/6820102.fhwa.pdf?sfvrsn=2dbde36c_07000100.comm
: 4. 700-4.22 Acceptance Testing: Line 2 may be modified as “If the equipment fails to operate for a total of six or more calendar days, testing will be restarted.” (Kandarappallil Jose) Response: ******************************************************************************
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/comments-responses/7000100.comm.pdf?sfvrsn=3bf12958_03530100.impl
centerline, in contact with the surface, testing until the replacement slab is straight edged from one side, , consolidate and refinish. Cut down and refinish any high areas. Continue straightedge testing and surface
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2014/january-2014/review/implemented/3530100.impl.pdf?sfvrsn=c956e469_01050813InternalCommentResponse
Geotechnical Technician and the DTO or DTE during dynamic load testing, the Senior Geotechnical, cannot work independently of the DTO or DTE to collect dynamic load testing data.” The comments
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/internal/comments-responses/1050813internalcommentresponse.pdf?sfvrsn=6e260275_15480203InternalCommentResponse
Specification Section 548 Articles 548-2, 548-3, and 548-9 ORIGINATION Date: 6-2-25 Name: Rodrigo Herrera Email: rodrigo.herrera@dot.state.fl.us COMMENTARY To provide clarification on how to address high water elevations and environmental testing for corrosivity. INTERNAL COMMENTS AND RESPONSES (Please note all comments and responses are verbatim as received. The Specifications, = Change Made to Specification Name: Barbara Beacham Date: 7-28-25 COMMENT: The 548 testing
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/review/industry/comments-responses/5480203internalcommentresponse.pdf?sfvrsn=c99d4a9a_1Negotiating Contracts
. The information may be anonymously submitted. Sample MS Word format for Materials Testing/Geotech firms, Testing/Geotech firms to submit their new published fee schedule (MS Excel 24.0 KB) The forms available
https://www.fdot.gov/procurement/negotiations.shtm20240412_AOR_Study_Webinar_Agenda
. Presentation: Recap on AOR Study Objectives Update on Testing Disaggregated Data Invitation to Participate in Testing Website Casey Perkins, Thomas Howell Ferguson III. Questions
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/ctd/docs/workshopdocs/2024/20240412_aor_study_webinar_agenda.pdf?sfvrsn=20d00917_16350000.resp
. 3.UseASTMD790,ASTMC580,orASTMC78,etc.in allenvironmental tests, except the simulated sunlight exposure test, to compare, Testing Requirements: On a recommendation from a listed lab (FDOT-TERL, List of Acceptable Test Labs, tests, except the simulated sunlight exposure test, to measure ultimate flexural strength, . --------------------------------------------------------------------------------------------------------------------- 3. 635-2.1.5 Testing Requirements, materials meeting the requirements of this Section.” The purpose of the flexural testing in Section 6
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/history/jul13/files/6350000.resp.pdf?sfvrsn=14ab4781_0Title VI Program 2025
against an individual because he/she made a complaint, testified, assisted or participated in any
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/transit/documents/title-vi-transit/title-vi-program-2025.pdf?sfvrsn=26de5a43_1SP6490000
% of the specified 28-day concrete strength and verifying test results have been provided to the Engineer. Determine concrete strength from tests on a minimum of two test cylinders prepared and tested, of 20 to 30 seconds. Test the grout fluidity using ASTM C939 Flow Cone Method. Discard any grout
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/implemented/workbooks/janworkbook2015/files/sp6490000.pdf?sfvrsn=36328c06_4