7443 search results for Pavement

E59D2

- BLADING PAVED SHOULDER, UP TO 24" BEYOND PAVEMENT LF 10,560.000 E580-332- 21 TREE REMOVAL (4

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2026/feb03/e59d2.pdf?sfvrsn=7d261d10_1

E3Z31

- SHOULDER REWORK SY 80,000.000 E577- 71- BLADING PAVED SHOULDER, UP TO 24" BEYOND PAVEMENT LF 1,500.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2026/feb12/e3z31.pdf?sfvrsn=225aa96_1

2025 WP Project Summary_D4_v8

of travel lanes from six to eight. Work includes pavement widening, reconstruction, milling, includes concrete pavement design, minor realignment of interior access roads, drainage and lighting, . Work includes pavement widening, reconstruction, milling and resurfacing, noise walls in qualifying, to ten. Work includes pavement widening, reconstruction, milling and resurfacing, and noise walls, will increase the number of travel lanes from six to eight. Work includes pavement widening, reconstruction

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/turnpike-work-program-summaries/2025-wp-project-summary_d4_v8.pdf?sfvrsn=876994c5_1

LAP344-726

nonstructural concrete; including sidewalks, curb and gutter, ditch and slope pavement, or other non, (Pavement) (4) (11) 3,000 0.50 470 (6) 1.5 or 3 II (2) 3,400 0.53 470 3 (1) II (Bridge Deck, be reduced to 470 pounds per cubic yard. (8) Recycled Asphalt Pavement (RAP) may replace up to 20, than or equal to 6.0%. (11) For Class I (Pavement), air content testing is not required. 344-3.3

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2026-27/lap/lap344-726.pdf?sfvrsn=b95ef228_1

itsfm046-electronic-speed-feedback-sign-form

 Page ____ of ____ STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ITS Facility Management System Electronic Speed Feedback Sign (ESFS) Attribute Form Date: Inspector: Site Identification Name: Electronic Speed Feedback Sign Information ESFS Controller Speed Detector EFSS Name: Facility Owner: County: Date Installed (yyyy-mm-dd): Manufacturer: Model: Serial Number: Speed Detector Type: Radar Sensor Video Sensor Pavement Sensor Date Installed (yyyy-mm-dd): Manufacturer: Model

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/itsfm/documents/datacollection/2026/itsfm046-electronic-speed-feedback-sign-form.pdf?sfvrsn=570c1002_1

Agency Term Contracts

-SJ 5/8/2027 Pavement Markers: Raised, Reflectorized and Related Materials CR1264, CR1265, CR1266 DOT

https://www.fdot.gov/procurement/agencytermcontracts.shtm

District Maintenance Engineer (DME) Memorandums

Program Pavement Symbol Characteristic 17-02 Modifications to Asset Maintenance Contracts - Evacuations

https://www.fdot.gov/maintenance/dme/dmememos.shtm

E21R8BidTabs

, reflective pavement markers (RPM's), Maintenance of Traffic (MOT), and Mobilization on various roadways

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/bid-tabs/2026/feb18/e21r8bidtabs.pdf?sfvrsn=a9efdbae_1

Requalification Schedule & Requirements

Vertical Panels NCHRP 2-Year On-line Requalification 102033 Work Zone Raised Pavement Marker - Class D, Asphalt Pavement Base 2-Year On-line Requalification 285001 Optional Base Course, Asphalt 2-Year, Concrete Pavement 2-Year On-line Requalification APL Requalification Schedule 350002 Color Materials for Concrete Pavement 2-Year On-line Requalification 351001 DEV - Fiber Reinforced Polymer Patching, On-line Requalification 523000 Patterned Pavement 2-Year On-line Requalification & Sample 526002

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/programmanagement/productevaluation/ipl/files/requalification-schedule-requirements.pdf?sfvrsn=8d216c77_16

6950000-122FHWA

by manufacturer) Sensor Element Material Pressure sensing piezoelectric Pavement Operating Temperature 0°F, to outline the perimeter of the sensor on the pavement and routes for lead-in cables. Do not allow the saw cut in the pavement to deviate more than 1.0 inch from the chalk line. Ensure that all saw cuts, a temperature sensor in the roadway or paved shoulder to monitor pavement temperature. Ensure, shoulder to monitor pavement temperature to compensate for temperature variation. Install

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/fhwa/6950000-122fhwa.pdf?sfvrsn=83a247e2_2

2026FDM220RR

pavement message and the tracks. Remove all existing traffic control signs and pavement markings (e.g., turning signs and turning arrow lane-use pavement markings) from the upstream approach that may lead, - Railroads 11 220.2.3 Pavement Markings Do not place turning movement lane-use pavement markings on the upstream approach between the railroad crossing pavement message and the tracks. Remove all, pavement message and the tracks that may lead to driver confusion on the correct turning point

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2026/2026fdm220rr.pdf?sfvrsn=4f4e6c18_14

44629015201-PLANS-02-SIGNINGMARKING_PHIV

LICENSE NUMBER 72029 FLORIDA DEPARTMENT OF TRANSPORTATION (863) 519-2300 SIGNING AND PAVEMENT MARKING, R P A D I R O L F SIGNING AND PAVEMENT MARKING PLANS GENERAL NOTES KEY SHEET SHEET DESCRIPTION S-3 - S-25 S-2 S-1 SHEET NO. ISAMARIE L. MONREAL, P.E. FDOT PROJECT MANAGER: PAVEMENT MARKING PLANS INDEX OF SIGNING AND ENGINEER OF RECORD: PAVEMENT MARKING PLANS SIGNING AND F L, g A n d M a r k i n g \ K E Y S S P 0 1 . d g n SIGNING AND PAVEMENT MARKING

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25127/44629015201-plans-02-signingmarking_phiv.pdf?sfvrsn=5e442e2f_1

Special Provisions Archive

. SP3270100 MILLING OF EXISTING ASPHALT PAVEMENT(REV 8-31-99) (FA 2-14-00) (7-20) When the Plans, yards", etc. (Insert Information Required) SP3270200 MILLING OF EXISTING ASPHALT PAVEMENT, OF EXISTING ASPHALT PAVEMENT(REV 12-16-19) (FA 12-30-19) (7-20) Use with approval from the District, 2-22-18) (7-20) Use on all interstate and limited access asphalt pavement roadway projects. SP3500200 CEMENT CONCRETE PAVEMENT (COLORED CONCRETE)(REV 5-11-16) (FA 5-12-16) (7-20) Jobs with Colored

https://www.fdot.gov/specifications/special-provisions-archive
20 of 7443 results
Top