4361 search results for FDOT DESIGN STANDARD

Software Requirements Specification_9.0

The following documents were used to develop this document:  FDOT Scope of Services: BE492, Standard, EV ..............................Event Viewer FDOT .........................Florida Department, and discussion with ITS Central Office 1.0.2 April 2, 2004 Incorporated FDOT comments. 2.0.0-Draft August 27, Finalized with FDOT comments, new enhancements (from ECO 1.1) 2.0.1 August 11, 2005 Finalized, nomenclature changes in the EM PM design and implementation 2.2.2 December 4, 2006 Added Ramp

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/traffic/cmtp/sunguide/releases/9.0/software-requirements-specification_9-0.pdf?sfvrsn=a63fde17_1

fdot-bed30-977-03-rpt

of Transportation (FDOT) Public Transit Office for their assistance and feedback throughout, the software and hardware sides. Scholarly literature, technical standards, and pertinent reports were used, Study Research Topic Mode Data Classification Region Murdan et al. (2020) Design, development

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bed30-977-03-rpt.pdf?sfvrsn=7dd7ed98_1

fdot-bed33-977-01-rpt

 Exploring Micromobility Services in Florida Final Report FDOT Contract No: BED33-977-01, 15. Supplementary Notes FDOT Project Manager: Jeffery Frost 17. Key Words 18. Distribution, No. (TRAIS) 16. Abstract The Florida Department of Transportation (FDOT), through its Connected, by the Research Center of the Florida Department of Transportation (FDOT). The authors thank project, and in Florida. The Florida Department of Transportation (FDOT), through its Connected and Automated

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/research/reports/fdot-bed33-977-01-rpt.pdf?sfvrsn=5cd93a97_1

4500000.FHWA2

or minus 3 inches andfor the location of intermediate diaphragms, relative to design plan positions, . If the camber exceeds by 1 inch of the design camber shown in the Plans, take appropriate actions, requirements: a. The provisions of the Contract Documents. b. The AASHTO LRFD Bridge Design, with the proposed changes is not less than the ultimate strength of the original design. g. The provisions of the Departments Structures Design Guidelines. 4500000.D01D02 All Jobs 450-6 Forms. 450-6.1

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2019/january-2019/review/fhwa/4500000.fhwa2.pdf?sfvrsn=a835bd6_0

4551508-724CommResp

Staff Contacted Standard Plans Index Traffic Engineering Manual FDOT Design Manual Construction Project Administration Manual Basis of Estimate/Pay Items Structures Design Guidelines Approved, necessitate any of the following: Design Bulletin Construction (DCE Memo) Estimates Bulletin Materials, . Refusal is defined as the depth where the penetration of the standard auger equipment is less than

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/review/comments-responses/4551508-724commresp.pdf?sfvrsn=fee74b29_2

sp4550000db

STRUCTURES FOUNDATIONS (Design Build). (REV 6-17-19) (FA 7-9-19) (1-21) SECTION 455 is deleted, a qualified Specialty Engineer to design cofferdams, and to sign and seal the plans, evaluation of the preliminary design calculations and settlement estimates and to provide information for final pile/shaft length design. Ensure that the instrumentation is as described in the Contract, gauges are as shown in the Plans or as directed by the Geotechnical Foundation Design Engineer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/january-2021/design-build/sp4550000db.docx?sfvrsn=8e0dda17_2

Evaluation of East Gainesville Mico-Mobility

 Evaluation of East Gainesville Florida Microtransit Mobility Project FDOT Project, Department of Transportation (FDOT) Transit Office for their assistance in understanding the scope, .................................................16 2.3.3.1 Public Engagement in Service Design and Improvement, -responsive transit FDOT Florida Department of Transportation FMLM First-mile, last-mile FTA Federal, . Microtransit services can provide 1 mobility as a service and offers an innovative design choice

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/transit/documents/evaluation-of-east-gainesville-mico-mobility_df843015-657d-46d5-834f-a82a98bf5c20.pdf?sfvrsn=37915487_2

Historical Item Averages Statewide 12 Months

OF SALVAGEABLE MATERIAL TO FDOT 0120 1 164 $9.52 $56,482,898.32 5,932,823.200 CY N REGULAR, SPECIAL DESIGN, 12" 0289 1104 1 $127.00 $11,938.00 94.000 SY Y COARSE AGGREGATE BASE SPECIAL DESIGN, 772.000 LF N PVC PIPE FOR BACK OF SIDEWALK, NON STANDARD DIAMETER 0430964 6 1 $60.00 $7,740.00 129.000

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fpo/fpc/reports/historicalitemaveragecost/moving/statewide/pdf/historical-item-averages-statewide-12-months.pdf?sfvrsn=32501f5b_1

6600000.impl

in accordance with the manufacturer’s instructions and the Design Standards, Index No. 17781, n n e c t o r c o n f o r ms to Telecommunications Industry Association (TIA)-232 standards. Ensure, a c e a n d c o n n e c t o r c o n f o r ms to TIA- 232 standards. Ensure that the serial ports, . Ensure t h e s e r i a l i n t e r f a c e a n d c o n n e c t o r c o n f o r ms to TIA- 232 standards, n f o r ms to TIA- 232 standards. Ensure that the serial ports support data rates up to 115200 bps

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/implemented/6600000.impl.pdf?sfvrsn=62fd0eb5_0

SP4550000DB-723

 455 STRUCTURES FOUNDATIONS (DESIGN BUILD). (REV 2-28-23) (FA 10-19-22) (FY 2023-24) SECTION, are not detailed in the Plans, employ a qualified Specialty Engineer to design cofferdams, and to sign and seal, design calculations and settlement estimates and to provide information for final pile/shaft length design. Ensure that the instrumentation is as described in the Contract Documents. Supply 110 V, are as shown in the Plans or as directed by the Geotechnical Foundation Design Engineer of Record (GFDEOR

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/design-build/sp4550000db-723.pdf?sfvrsn=42102fcc_2

SP4550000DB-722

 STRUCTURES FOUNDATIONS (DESIGN BUILD). (REV 12-22-21) (FA 1-25-22) (7-22) SECTION 455, in the Plans, employ a qualified Specialty Engineer to design cofferdams, and to sign and seal the plans, distribution between side friction and end bearing to provide evaluation of the preliminary design calculations and settlement estimates and to provide information for final pile/shaft length design, in the Plans or as directed by the Geotechnical Foundation Design Engineer of Record (GFDEOR). Use

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/design-build/sp4550000db-722.pdf?sfvrsn=47fe5644_2

SP4550000DB-122

 STRUCTURES FOUNDATIONS (DESIGN BUILD). (REV 7-14-21) (FA 7-19-21) (1-22) SECTION 455, in the Plans, employ a qualified Specialty Engineer to design cofferdams, and to sign and seal the plans, distribution between side friction and end bearing to provide evaluation of the preliminary design calculations and settlement estimates and to provide information for final pile/shaft length design, in the Plans or as directed by the Geotechnical Foundation Design Engineer of Record (GFDEOR). Use

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/design-build/sp4550000db-122.pdf?sfvrsn=951c94e4_2

SP4550000DB-721

 STRUCTURES FOUNDATIONS (DESIGN BUILD). (REV 1-07-21) (FA 1-13-21) (7-21) SECTION 455, in the Plans, employ a qualified Specialty Engineer to design cofferdams, and to sign and seal the plans, distribution between side friction and end bearing to provide evaluation of the preliminary design calculations and settlement estimates and to provide information for final pile/shaft length design, in the Plans or as directed by the Geotechnical Foundation Design Engineer of Record (GFDEOR). Use

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2021/july-2021/design-build/sp4550000db-721.pdf?sfvrsn=cb06bab9_2

SP4550000DB-722AddChng impl

 SP455 STRUCTURES FOUNDATIONS (DESIGN BUILD). (REV 12-14-21) (FA 1-25-22) (7-22) SECTION 455, are not detailed in the Plans, employ a qualified Specialty Engineer to design cofferdams, and to sign and seal, of the preliminary design calculations and settlement estimates and to provide information for final pile/shaft length design. Ensure that the instrumentation is as described in the Contract Documents. Supply, gauges are as shown in the Plans or as directed by the Geotechnical Foundation Design Engineer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/implemented/sp4550000db-722addchng-impl.pdf?sfvrsn=e9fcba72_2

SP4550000DB-722impl

 SP455 STRUCTURES FOUNDATIONS (DESIGN BUILD). (REV 12-9-21) (FA 12-14-21) (7-22) SECTION 455, are not detailed in the Plans, employ a qualified Specialty Engineer to design cofferdams, and to sign and seal, of the preliminary design calculations and settlement estimates and to provide information for final pile/shaft length design. Ensure that the instrumentation is as described in the Contract Documents. Supply, gauges are as shown in the Plans or as directed by the Geotechnical Foundation Design Engineer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/review/implemented/sp4550000db-722impl.pdf?sfvrsn=354b2d2_2

SP4550000DB-122impl

 455 STRUCTURES FOUNDATIONS (DESIGN BUILD). (REV 7-14-21) (FA 7-19-21) (1-22) SECTION 455, in the Plans, employ a qualified Specialty Engineer to design cofferdams, and to sign and seal, of the preliminary design calculations and settlement estimates and to provide information for final pile/shaft length design. Ensure that the instrumentation is as described in the Contract Documents. Supply, are as shown in the Plans or as directed by the Geotechnical Foundation Design Engineer of Record

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/january-2022/review/implemented/sp4550000db-122impl.pdf?sfvrsn=8f7e0257_2

SP45500000-723impl

 455 STRUCTURES FOUNDATIONS (DESIGN BUILD). (REV 9-29-22) (FA 10-19-22) (FY 2023-24) SECTION, are not detailed in the Plans, employ a qualified Specialty Engineer to design cofferdams, and to sign and seal, of the preliminary design calculations and settlement estimates and to provide information for final pile/shaft length design. Ensure that the instrumentation is as described in the Contract Documents, gauges are as shown in the Plans or as directed by the Geotechnical Foundation Design Engineer

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2023-24/review/implemented/sp45500000-723impl.pdf?sfvrsn=f05c7271_1

SP4550000DB-725

 455 STRUCTURES FOUNDATIONS (DESIGN BUILD). (REV 1-6-25) (FA 11-20-23) (FY 2025-26) SECTION 455, are not detailed in the Plans, employ a qualified Specialty Engineer to design cofferdams, and to sign and seal, design calculations and settlement estimates and to provide information for final pile/shaft length design. Ensure that the instrumentation is as described in the Contract Documents. Supply 110 V, are as shown in the Plans or as directed by the Geotechnical Foundation Design Engineer of Record (GFDEOR

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2025-26/design-build/sp4550000db-725.pdf?sfvrsn=aab76686_2

SP4550000DB-724

 455 STRUCTURES FOUNDATIONS (DESIGN BUILD). (REV 2-12-24) (FA 11-20-23) (FY 2024-25) SECTION, are not detailed in the Plans, employ a qualified Specialty Engineer to design cofferdams, and to sign and seal, design calculations and settlement estimates and to provide information for final pile/shaft length design. Ensure that the instrumentation is as described in the Contract Documents. Supply 110 V, are as shown in the Plans or as directed by the Geotechnical Foundation Design Engineer of Record (GFDEOR

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2024-25/design-build/sp4550000db-724cln.pdf?sfvrsn=c9ddd357_2

SP4550000DBEO-722

 STRUCTURES FOUNDATIONS (DESIGN BUILD). (REV 2-28-23) (FA 1-25-22) (7-22) SECTION 455, in the Plans, employ a qualified Specialty Engineer to design cofferdams, and to sign and seal the plans, distribution between side friction and end bearing to provide evaluation of the preliminary design calculations and settlement estimates and to provide information for final pile/shaft length design, in the Plans or as directed by the Geotechnical Foundation Design Engineer of Record (GFDEOR). Use

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2022/july-2022/design-build/sp4550000db-722-eo-memo-23-01.pdf?sfvrsn=ed5ca5d7_7
20 of 4361 results