7243 search results for Pavement

D5-06-04-24BSN

of sidewalk and concrete ditch pavement; installation of drainage structures and pipe; and removing, Reconstruction, Milling & Resurfacing, Drainage Improvements, Rigid Pavement Construction, Sidewalk, Gravity Wall, Utility Construction, Signing & Pavement Markings, Lighting and Intelligent Transportation, - MAINTENANCE OF TRAFFIC (43847815201) LS 1.000 0102- 2-200 SPECIAL DETOUR- TEMPORARY PAVEMENT (43847815201, MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH SY 1,170.000 0327- 70- 19 MILLING EXISTING

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2024/jun04/d5-06-04-24bsn.pdf?sfvrsn=72c356db_2

521-611

transitions : 12. Junction slabs with rigid pavement: the two inch increase in concrete barrier height is not required. Index 400-091 - Approach Slabs (Rigid Pavement Approaches) Index 400-090 - Approach Slabs (Flexible Pavement Approaches) 11. The following Indexes contain details, Barrier. See Typical Sections on Sheets 2 and 3 for details. 8. Shoulder or Roadway Pavement is required, e c a s t C o n c r e t e B a r r i e r Pavement (See Notes 3 & 4) Shoulder

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/521-611.pdf?sfvrsn=dc45cec6_1

521-610

. Junction slabs with rigid pavement: the two inch increase in concrete barrier height is not required. Index 400-091 - Approach Slabs (Rigid Pavement Approaches) Index 400-090 - Approach Slabs (Flexible Pavement Approaches) 11. The following Indexes contain details of the intersection of the retaining, on Sheets 2 and 3 for details. 8. Shoulder or Roadway Pavement is required on top of the junction slab, r Pavement (See Notes 3 & 4) Shoulder or Roadway Overbuild Type SP NOTES: surface for all

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2026/idx/521-610.pdf?sfvrsn=fecd8620_1

431311-1_RRR(2016)MP17.208-19.155_PLANS

AND PAVEMENT MARKING PLANS ROADWAY PLANS PROJECT LOCATION KAREN VAN DEN AVONT, P.E. 44794 ORLANDO, FL, SIGNALIZATION PLANS A SIGNING AND PAVEMENT MARKING PLANS ROADWAY PLANS 10/8/2015 STomkins H:\08.104\23, S-5 S-4 S-2 - S-3 S-1 SHEET NO. SIGNING AND PAVEMENT MARKING PLANS SUBSURFACE UTILITY DATA, AND PAVEMENT GENERAL NOTES TABULATION OF QUANTITIES KEY SHEET SHEET DESCRIPTION BARTOW, FL, DETAIL RESURFACING MILLING AND � SURVEY SR 45 MILLING PAVEMENT FOR DEPTH (3.5") MILL EXISTING

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy-25-26/ad--26105/431311-1_rrr(2016)mp17-208-19-155_plans.pdf?sfvrsn=11ec1f8b_1

D3-03-13-25BSN

) LS 1.000 Section 0003 Signing 0706- 1- 3 RAISED PAVEMENT MARKER, TYPE B EA 9.000 0918-712-100 INTEGRATED MULTI-POLYMER PAVEMENT MARKINGS, WHITE, SOLID 6" GM 0.058 0918-712-110 INTEGRATED MULTI-POLYMER PAVEMENT MARKINGS, YELLOW, SOLID 6" GM 0.058 0918-712-120 INTEGRATED MULTI-POLYMER PAVEMENT MARKINGS, WHITE, 10-30 SKIP 6" GM 0.058 0918-712-130 INTEGRATED MULTI-POLYMER PAVEMENT, DETOUR- TEMPORARY PAVEMENT (44778815201) LS 1.000 0102- 2-300 SPECIAL DETOUR- TEMPORARY EARTHWORK

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2025/mar13/d3-03-13-25bsn.pdf?sfvrsn=5d70b948_1

TP-05-13-25BSN2

of Becker Road on Florida's Turnpike (State Road 91). Major work includes bridge replacement, pavement, , signing and pavement marking, intelligent transportation systems (ITS), drainage, and lighting, PAVEMENT (44852415201) LS 1.000 0102- 2-300 SPECIAL DETOUR- TEMPORARY EARTHWORK/BASE (44852415201) LS, EXISTING ASPHALT PAVEMENT, 2" AVG DEPTH SY 929.000 0327- 70- 6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH SY 1,040.000 0327- 70- 8 MILLING EXISTING ASPHALT PAVEMENT, 2 1/2" AVG DEPTH SY

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/may13/tp-05-13-25bsn2.pdf?sfvrsn=27663455_1

15_Traffic_Calming_Redlines

signing, pavement markings, and channelization is in accordance with the Manual on Uniform Traffic, in 5 mph increments.  Crosswalks – Standard crosswalks marked only with signs and pavement markings, hydrants or mailboxes. Information on signing and pavement markings for vertical deflections can, . They generally do not create problems for bicyclists and motorcyclists. Because pavement area, or Bulb-outs Realignment of curb at intersection or mid-point of a block to decrease pavement width

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/floridagreenbook/16th-edition/15_traffic_calming_redlines.pdf?sfvrsn=906f4a21_5

15_Traffic_Calming_Rulemaking

of the traffic calming design and implementation. • Make certain that all signing, pavement, crosswalks marked only with signs and pavement markings do not affect motorists’ speeds and should, on signing and pavement markings for vertical deflections can be found in the MUTCD Manual, . They generally do not create problems for bicyclists and motorcyclists. Because pavement area is usually, pavement width. See Figure 15 - 5 . Visually and physically narrows the roadway, shortens

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/floridagreenbook/16th-edition/15_traffic_calming_rulemaking.pdf?sfvrsn=a0271aae_1

521-610

. Junction slabs with rigid pavement: the two inch increase in concrete barrier height is not required. Index 400-091 - Approach Slabs (Rigid Pavement Approaches) Index 400-090 - Approach Slabs (Flexible Pavement Approaches) 11. The following Indexes contain details of the intersection of the retaining, on Sheets 2 and 3 for details. 8. Shoulder or Roadway Pavement is required on top of the junction slab, Pavement (See Notes 3 & 4) Shoulder or Roadway Overbuild Type SP NOTES: surface for all pavement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/521-610.pdf?sfvrsn=c3b5c2ad_1

521-611

transitions : 12. Junction slabs with rigid pavement: the two inch increase in concrete barrier height is not required. Index 400-091 - Approach Slabs (Rigid Pavement Approaches) Index 400-090 - Approach Slabs (Flexible Pavement Approaches) 11. The following Indexes contain details, Barrier. See Typical Sections on Sheets 2 and 3 for details. 8. Shoulder or Roadway Pavement is required, e c a s t C o n c r e t e B a r r i e r Pavement (See Notes 3 & 4) Shoulder

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/idx/521-611.pdf?sfvrsn=9e2e0b43_1

FY2026-27RevisionLog

BARRIER INLET detail; Changed "Edge of Pavement" callout to "Edge of Traveled Way"; Added Barrier Gutter, ; Changed "Edge of Pavement" callout to "Edge of Traveled Way"; Added Slope Break (Typ. as Required, TRANSITION" detail to "SUPERELEVATION - HIGH SIDE LOCATON" in the "SHOULDER PAVEMENT WARP" details; Renamed "SHOULDER PAVEMENT WARP" details to "SHOULDER PAVEMENT TRANSITIONS". 430-030 Sheet 2: Added, all ditch pavement except for miscellaneous asphalt.” Sheet 2: Update the geotextile type

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/fy2026-27revisionlog.pdf?sfvrsn=9a9c25fb_1

TP-12-19-25BSN

reconstruction and lighting, signing, pavement marking, traffic signals and Intelligent Transportation, - MAINTENANCE OF TRAFFIC (43546145201) LS 1.000 0102- 2-200 SPECIAL DETOUR- TEMPORARY PAVEMENT (43546145201, EXISTING ASPHALT PAVEMENT, 3 1/2" AVG DEPTH SY 16,005.000 0327- 70- 4 MILLING EXISTING ASPHALT PAVEMENT, 3" AVG DEPTH SY 29,072.000 0327- 70- 6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH SY 12,238.000 0327- 70- 8 MILLING EXISTING ASPHALT PAVEMENT, 2 1/2" AVG DEPTH SY 4,632.000 0327- 70

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/lettings/2025/dec19/tp-12-19-25bsn.pdf?sfvrsn=546f4e73_1

D2-11-19-25BSN

- 71- REINFORCEMENT GRID FOR SOIL STABILIZATION SY 25.000 0339- 1- MISCELLANEOUS ASPHALT PAVEMENT TN, CONCRETE DITCH PAVEMENT, NON REINFORCED, 6" SY 900.000 0524- 1- 49 CONCRETE DITCH PAVEMENT, 6, and dispose of Fabric formed concrete slope pavement, earth work, sidewalk repair & sodding in areas, : The Improvements under this Contract consist of construction of concrete pavement, base work, drainage, PLAIN CEMENT CONCRETE PAVEMENT, 11" SY 21,836.000 0350- 3- 14 PLAIN CEMENT CONCRETE PAVEMENT, 12.5" SY

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2025/nov19/d2-11-19-25bsn.pdf?sfvrsn=892893bd_3

E8W48BidTabs

ponds, Coral Ridge Drive interchange reconstruction and lighting, signing, pavement marking, traffic, 1,050,000.00000 1,050,000.00 0155 0102 2200 SPECIAL DETOUR- TEMPORARY PAVEMENT 43546145201 (112404.000, EXISTING ASPHALT PAVEMENT, 3 1/2" AVG DEPTH 16,005.000 SY 6.00000 96,030.00 5.00000 80,025.00 6.18000 98,910.90 0395 0327 70 4 MILLING EXISTING ASPHALT PAVEMENT, 3" AVG DEPTH 29,072.000 SY, PAVEMENT, 1 1/2" AVG DEPTH 12,238.000 SY 6.00000 73,428.00 5.00000 61,190.00 6.18000 75,630.84

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/tp/bid-tabs/2025/dec19/e8w48bidtabs.pdf?sfvrsn=7f9e34f1_1

MASTER - D1 CAP FY25_FINAL

when tasks are delayed • Pavement cores need 90-day turnaround • Positive float belongs, – Signing and pavement marking – Signalization – Drainage • Issues and concerns – Safety, will include – 3D Survey – Widening and Realignment – Signing and pavement marking, will include – 3D Survey – Resurfacing – Signing and pavement marking – Miscellaneous work, – Resurfacing – Signing and pavement marking – Miscellaneous work to be performed • Issues

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/cap-presentation/master---d1-cap-fy25_final.pdf?sfvrsn=a5d0ddc5_1

D1 ACTIVE CONSTRUCTION PROJECTS

- PAVEMENT ONLY RESURFACE (FLEX) E1V22 44620615201 N/A Heartland Operations Center SR 64 FROM W, Operations Center SR 37 FROM SR 62 TO POLK COUNTY LINE - PAVEMENT ONLY RESURFA CE (FLEX) E1W13, Center SR 70 FROM TURNER AVE TO E OF FORD DEALERSHIP - PAVEMENT ONL Y RESURFACE (FLEX) E1W21, CREEK - RESURFACING E1W61 44911515201 N/A SR 45 (USB 41) FROM 26TH ST W TO SR 55 - PAVEMENT ONLY, D123074B SR 700/35 (US 98) FROM S OF GRIFFIN RD (CR 582) TO SHARON DR - FLEXIBLE PAVEMENT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/districtoffices/d1web/contracting/activeprojectslist/d1-active-construction-projects.pdf?sfvrsn=48d3f52d_52

D1-01-16-25BSN

ASPHALT PAVEMENT TN 10.000 0515- 1- 2 PIPE HANDRAIL - GUIDERAIL, ALUMINUM LF 40.000 0515- 2-111, Inspection, Cleaning, Repair and Ditch Pavement Repairs Limits: Midpoint Project(s): 43272927214, , Repair and Ditch Pavement Repairs Call Order: 005 Proposal: E1X59-R0 ALT Item Description Unit, - LIMEROCK-NEW MATERIAL FOR REWORKING BASE CY 50.000 0339- 1- MISCELLANEOUS ASPHALT PAVEMENT TN, 1.000 0524- 1- 2 CONCRETE DITCH PAVEMENT, NON REINFORCED, 4" SY 25.000 0524- 1- 4 CONCRETE DITCH

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2025/jan16/d1-01-16-25bsn.pdf?sfvrsn=c1ef144a_1

PublicHearing_VOLUSIA COUNTY_Summary_2027_2031

of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2027 2028 2029 2030 2031 Construction, ) FROM US 1 TO HERBERT ST. Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2027 2028, 15/600 (US 17/92) FROM ST JOHN'S RIVER BRIDGE TO N OF SAXON BLVD Type of Work: PAVEMENT ONLY, OF WISCONSIN AVE Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2027 2028 2029 2030 2031, AVE TO VOLUSIA AVE Type of Work: PAVEMENT ONLY RESURFACE (FLEX) Phase Funding Source 2027 2028

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/fdot-d5-work-program-reports/fdot-work-program-public-hearing-reports-past-years/publichearing_volusia-county_summary_2027_2031.pdf?sfvrsn=f2cfbb8a_1

2026-27-Update-Training

Walls and Sand Filters), Sign Supports 2)Ryan Gray –Standard Plans Specialist • Pavement Markings, Plans Standard Plans –Primary Updates: 1)Index 706-001 Typical Placement of Raised Pavement, RPMs within the arrow to match the rest of the RPMs. 2)Index 711-001 Pavement Markings • Sheet 7, ; CLARIFIED edge of pavement details; Updated wrong-way arrows to match 706-001. • Sheet 7: Updated, Pavement Markers Sheet 2: Removed RPMs from Wheel Path in Wrong-Way Arrow • Removed two RPMs from

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/training/2026-27-update-training.pdf?sfvrsn=b8fda28d_1

44927515201-ESTIMATES-QUANTITIES_Phase IV - Rev

700 ALL 0704 1 4 Tubular Marker, 36" Yellow Post EA 38 38 0706 1 3 Raised Pavement Marker, Type B EA 5703 5703 0710 11 101 Painted Pavement Markings, Standard, White, Solid, 6" GM 17.9010 17.901 0710 11 102 Painted Pavement Markings, Standard, White, Solid for Interchange and Urban Island, 8" GM 0.7670 0.767 0710 11 123 Painted Pavement Markings, Standard, White, Solid for Crosswalk and Roundabout, 12" LF 3308.0 3308 0710 11 124 Painted Pavement Markings, Standard, White, Solid

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy24-25/ad--25136/44927515201-estimates-quantities_phase-iv---rev.pdf?sfvrsn=c2b2250_1
20 of 7243 results