707 search results for bridge maintenance

E55E1

Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles Letting Date: 07/07/26, : 2027 Counties: Orange and Osceola Contract Calendar Days: 365 (12 Months) This is a Maintenance, FILL, MAINTENANCE CONTRACTS ONLY CY 50.000 0160- 4- TYPE B STABILIZATION SY 40.000 0173- 76- GROUT

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2026/jul07/e55e1.pdf?sfvrsn=157bef9c_1

RStandardPlansFY2026-27

Replacement Maintenance of Traffic 370-001 Bridge Approach Expansion Joint - Concrete Pavement, Plans may be used for maintenance operations or adopted by other authorities for use on projects under, of the FDOT Standard Specifications for Road and Bridge Construction. DIS UTION OF EXEMPT PUBLIC, of these sensitive documents. Structure is defined in Section 334.03(27), F.S., as "a bridge, viaduct, tunnel, of roadways and structures. These Standard Plans may be used for maintenance operations or adopted

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/2027/rstandardplansfy2026-27.pdf?sfvrsn=2993a081_1

2027FDM282TollSiteDesignandLayout

structures, box culverts, or bridge foundations must be located at least 5 feet from the toll site, follow the roadway’s horizontal curve iii. The parallel portion of the maintenance driveway, the maintenance vehicle parking. (e) See the TEB Site Plans and the RTC Site Plans for their respective site, along the maintenance pull-off area up to the toll site envelope. See Standard Plans, Index 521-512, : (a) Maintenance access/clearance must be provided per NEC and manufacturer’s requirements. The more

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/2027fdm282tollsitedesignandlayout.pdf?sfvrsn=2b3df426_1

D3-07-09-26BSN

AND MAINTENANCE PROGRAMS 1074 Hwy 90 Chipley, Florida 32428 Chipley, FL June 09, 2026 Advertisement, as established by the Department’s budget. Maintenance contracts do not require a contractor, . If deemed necessary by the Department, certain maintenance contracts will contain specific requirements for maintenance contractor eligibility. Bid Solicitation Notice Page 2 PREQUALIFIED, in accordance with Article 3-1 of the Standard Specifications for Road and Bridge Construction

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2026/jul09/d3-07-09-26bsn.pdf?sfvrsn=d92eec0d_1

Project Planning Manual Chapter 5

, or other maintenance-type improvements usually done through an existing continuing services contract, development (such as easements, joint-use agreements, or maintenance agreements). The plan should consider, When deliberately structured to feed PD&E and Design, project planning studies become a bridge

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/policy/planning-manual/chapter-5-implementing-project-planning.pdf?sfvrsn=8c195181_10

1050102int

Product List No Construction Office No Maintenance Office No Materials Manual Cristina Croft Yes, . These items include steel bridge components, moveable bridge components, pedestrian bridges, castings

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/fy-2027-28/review/internal/1050102int.pdf?sfvrsn=798e1a9a_1

D4-08-07-26BSN

AND MAINTENANCE PROGRAMS FDOT District 4- Office of Procurement 3400 W. Commercial Blvd. Ft. Lauderdale, budget. Maintenance contracts do not require a contractor to have a certificate of qualification, , certain maintenance contracts will contain specific requirements for maintenance contractor, of the Standard Specifications for Road and Bridge Construction, or as amended by the project Specifications, and Bridge Construction. Insurance companies must be authorized to do business in the State of Florida

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d4/lettings/2026/aug07/d4-08-07-26bsn.pdf?sfvrsn=15d8faf8_1

PD&E_Manual_Combined_v4

, and transportation maintenance facilities. Bridge removal may be a component of a bridge, on coordination with OEM); or 7. A new bridge which provides new access to an area or bridge replacements (i.e., , restoration, retrofitting, or replacement of any road, highway, bridge, tunnel, or transit, maintenance and improvements when carried out within the existing ROW. 19. Purchase and installation of operating or maintenance equipment to be located within the transit facility

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/environment/pubs/pdeman/2026/pd-e_manual_combined_v3.pdf?sfvrsn=85e4d283_3

D2-05-20-2026BSN

AND MAINTENANCE PROGRAMS Lake City District Office Complex 1109 South Marion Ave. - MS 2015 Lake City, FL, on construction projects over $250,000.00 as established by the Department’s budget. Maintenance contracts do, description and specifications. If deemed necessary by the Department, certain maintenance contracts will contain specific requirements for maintenance contractor eligibility. Bid Solicitation Notice, and Bridge Construction, or as amended by the project Specifications Package or any Supplemental

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d2/lettings/2026/may20/d2-05-20-2026bsn.pdf?sfvrsn=eaef03d4_1

E1Y38

OF I-75 TO N OF BRIDGE NO 030298 Limits: 03175025 Project(s): 45127615201(*) Federal Aid No: N/A Total Roadway Length: 6.552 Miles Contract Days: 140 Total Bridge Length: 0.000 Miles Letting Date, and resurfacing and pavement markings on SR 29 from South of I-75 to North of Bridge #030298, Roadway 0101- 1- MOBILIZATION (45127615201) LS 1.000 0102- 1- MAINTENANCE OF TRAFFIC (45127615201) LS

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d1/lettings/2026/jul16/e1y38.pdf?sfvrsn=5b03b528_1

Standard Plans - FY 2026-27

information. Skip to Standard Plans for Bridge Construction Last Updated: 08/20/26 Standard Plans, 308 SPI 370-001 Bridge Approach Expansion Joint Concrete Pavement, Miscellaneous 508-T01 Traffic Control Devices for Movable Span Bridge Signals, 17351 700-106 Rural Narrow Bridge Treatment 17359 700-107 Bridge Weight Restrictions 17357 700-108 Typical Signing for Truck

https://www.fdot.gov/design/standardplans/current/27

Standard Plans - FY 2026-27 CADD (DGN - CEL)

Maintenance of Traffic 102-200 DGN CEL Temporary Acrow 300 Series Detour Bridge General Notes and Details, Standard Plans within FDOT Contract Plans Skip to Standard Plans for Bridge Construction Last updated, Construction Operations Maintenance of Traffic 102-100 DGN Temporary Barrier 415, 305 353-001 DGN Concrete Slab Replacement 308 370-001 DGN Bridge Approach, DGN Traffic Control Devices for Movable Span Bridge Signals 17890 509-070 DGN

https://www.fdot.gov/design/standardplans/current/dgns

E59F1

No: N/A Total Roadway Length: Contract Days: 250 Total Bridge Length: Letting Date: 09/01/26, 1.000 0101- 1- MOBILIZATION (45099115201) LS 1.000 0102- 1- MAINTENANCE OF TRAFFIC (45097315201) LS 1.000 0102- 1- MAINTENANCE OF TRAFFIC (45099115201) LS 1.000 0102- 4- 1 PEDESTRIAN OR BICYCLE, AND MAINTENANCE, INTERSECTION ED 3,250.000 0102-107- 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2026/sep01/e59f1.pdf?sfvrsn=f71d5e76_1

E54E5

 Florida Department of Transportation Bid Solicitation Notice and Approximate Quantities Letting: 05260602 Call Order: 004 Proposal: E54E5 District:05 Counties: VOLUSIA Road Name: FC5 Targeted Asphalt Repair on SR 44 in Volusia County Limits: Midpoint Project(s): 42914217234(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 120 Total Bridge Length: 0.000 Miles, CONTROL (MH) 0101- 1- MOBILIZATION LS 1.000 0102- 1- MAINTENANCE OF TRAFFIC LS 1.000 0102- 14

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d5/lettings/2026/jun02/e54e5.pdf?sfvrsn=cfddba3e_1

456237-TechnicalScope-rev FINAL DRAFT

for ghost stripe showing thru with lanes shifted. Requested to contact bridge maintenance to ask, questions for shifting lane lines on the bridge. Deck sealer requested from bridge maintenance. o, 0.482-1.235 13010001 435038-2 (2022) Bridge Rehab MP 0.480-1.204 13010001 196069-1 RRR (2000) MP, transition to rigid barrier along the northbound approaches of the Green Bridge (bridge No. 130132, were reduced to 10-ft and 11-ft to provide for 6-ft buffered bike lane. o Bridge typical – reduce

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/procuement_marketingd1/documents/fy26-27/ad--27104/456237-technicalscope-rev-final-draft.pdf?sfvrsn=abdbe15b_1

D3-06-11-26BSN30Day

AND MAINTENANCE PROGRAMS 1074 Hwy 90 Chipley, Florida 32428 Chipley, FL May 12, 2026 Advertisement, as established by the Department’s budget. Maintenance contracts do not require a contractor, . If deemed necessary by the Department, certain maintenance contracts will contain specific requirements for maintenance contractor eligibility. Bid Solicitation Notice Page 2 PREQUALIFIED, in accordance with Article 3-1 of the Standard Specifications for Road and Bridge Construction

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/contracts/d3/lettings/2026/jun11/d3-06-11-26bsn30day.pdf?sfvrsn=ac63ee20_1

455-500IntReviewPkg

of Estimates Manual Approved Product List Construction Office Not contacted Yes Maintenance Office, in accordance with the Standard Specifications for Road and Bridge CONSTRUCTION: to construction. The project, to SPI 455-500 for Subsurface Exploration requirements. REQUIREMENTS FOR USE: Bridge Construction

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/design/standardplans/irr/2028/455-500intreviewpkg.pdf?sfvrsn=e4a1e7cb_1

FedTech Bulletin 16-03 Revisions for ER findings (closing documents) 1-27-2026 final

NO NO 71 Maintenance In-house NO NO 72 Maintenance Consultant NO NO 84 Operations Grant NO NO 88, Organizations NO YES NBIS Bridge Inspection NO NO Final Inspection and Acceptance of Federal-Aid, EMERGENCY SIGN REPR/REPL F EMERGENCY SIGNAL REPR/REPL G EMERGENCY ROAD REPAIR H EMERGENCY BRIDGE

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/planning/policy/metrosupport/upwp-external/fedtech-bulletin-16-03-revisions-for-er-findings-(closing-documents)-1-27-2026-final.pdf?sfvrsn=56123a15_1

2027FDM918DrngMap

, and for emergency response and maintenance purposes. Use the following horizontal scales: Standard, and station the begin and end of bridges and bridge culverts. (6) Label road names, state numbers

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/roadway/fdm/2027/review/2027fdm918drngmap.pdf?sfvrsn=8a422a19_1

Chapter5s12

to the Final As-Built Plans. (8) Final As-Built Bridge Plans The Structures Designer and Facilities Engineers need accurate bridge records available for inspection, maintenance, rehabilitation, for Road & Bridge Construction Review and Administration Manual, Topic No. 700-050-05 FDOT Design, details changed during construction (k) All Bridge, Approach Slab, and Lighting details different, information on the proper matrices, plans sheets, log books, and forms for bridge projects: Topic

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/construction/manuals/cpam/newcleanchapters/chapter5s12.pdf?sfvrsn=846be428_20
20 of 707 results
Top