7243 search results for Pavement

9320303.comm

 9320303 NONMETALLIC ACCESSORY MATERIALS FOR CONCRETE PAVEMENT AND CONCRETE STRUCTURES COMMENTS FROM INTERNAL/INDUSTRY REVIEW John Westphal 414-4141 john.westphal@dot.state.fl.us Comments: (6-5-17, Internal) 1. Should we call for seven samples of straight bars as there are seven straight bar tests? Response: 2. “representing a random production LOT, per bar size” Response: 3. Three times per project? Response: 4. “bent” Response

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2018/january-2018/review/comments-responses/9320303.comm.pdf?sfvrsn=40eaf0a6_0

D6900000

require the removal or disturbance of overlying pavement, curb, grass, or sidewalk, remove such pavement, assemblies, remove the amplifier and the detector pad and its framework from the roadway pavement, with an approved asphaltic concrete mix or concrete pavement mix so as to restore the roadway

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2002/january-2002/workbook/d6900000.pdf?sfvrsn=422902a0_0

D6900000.do

or disturbance of overlying pavement, curb, grass, or sidewalk, remove such pavement and subsequently, , remove the amplifier and the detector pad and its framework from the roadway pavement. After removing, asphaltic concrete mix or concrete pavement mix so as to restore the roadway to the satisfaction

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2003/january-2003/workbook/d6900000.do.pdf?sfvrsn=a6bdb551_0

2870000SS

. ConstructAsphaltTreatedPermeable Base (ATPB) and Outlet Pipe for use under concrete pavement, in accordance, compensation for work specified in this Section, including removal of existing shoulder pavement, ), grouting around and stubbing into existing or proposed drainage structures or ditch pavement; restoration of ditch pavement, sod and other areas disturbed by the Contractor, backfill in place, disposal

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2005/january-2005/workbook/2870000ss.pdf?sfvrsn=d17542aa_0

0010003SS

. Theportionoftheroadbedimmediately below the base course or pavement, including below the curb and gutter, valley gutter, shoulder and driveway pavement. The subgrade limits ordinarily include those portions, inches [300 mm] below the bottom of the base or pavement and outward to 6 inches [150 mm] beyond the base, pavement, or curb and gutter. Substructure

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2006/january-2006/workbook/0010003ss.pdf?sfvrsn=c9960c7b_0

2870000SS

. ConstructAsphaltTreatedPermeable Base (ATPB) and Outlet Pipe for use under concrete pavement, in accordance, compensation for work specified in this Section, including removal of existing shoulder pavement, ), grouting around and stubbing into existing or proposed drainage structures or ditch pavement; restoration of ditch pavement, sod and other areas disturbed by the Contractor, backfill in place, disposal

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2006/january-2006/workbook/2870000ss.pdf?sfvrsn=3451f976_0

9710605.resp

 9710605 PAVEMENT MARKING MATERIALS COMMENTS FROM INTERNAL/INDUSTRY REVIEW David Villani 678-558-1660 davev@ennisflint.com Comments: (11-19-15) 971-6.5.1 = I the 5 maximum retro with or without drop on glass? 711-4.4 implies black marking get drop on glass 971-10.2, -10.3 and -10.4 = how will compliance be verified? FL DOT lab, independent lab test reports, supplier lab report? 971-10.4.3 = is the 55 initial BPN done with or without drop on material, and is it tested in the lab

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/comments-responses/9710605.resp.pdf?sfvrsn=e4f375cd_0

7110200.resp

 7110200 THERMOPLASTIC PAVEMENT MARKINGS COMMENTS FROM INTERNAL/INDUSTRY REVIEW Gevin McDaniel 850-414-4284 gevin.mcdaniel@dot.state.fl.us Comments: (11-16-15) The term "High Skid Thermoplastic" must be changed to either "High Skid Resistance Thermoplastic" or "High Friction Thermoplastic". Response: Agree, change made. ****************************************************************************** Marshall Douberley 863-519-2382 marshall.douberley@dot.state.fl.us Comments

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/july-2016/review/comments-responses/7110200.resp.pdf?sfvrsn=8d199aea_0

3470204.FHWA

in accordance with 347-5.2. Sidewalk, ditch pavement, slope pavement, Traffic Separator, or curb and gutter, in accordance with 347-5.2. Sidewalk, ditch pavement, slope pavement, Traffic Separator, or curb

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/fhwa/3470204.fhwa.pdf?sfvrsn=61e96a7_0

9320103.impl

 932 NONMETALLICACCESSORYMATERIALS FOR CONCRETE PAVEMENT AND CONCRETE STRUCTURES. (REV4-3-15)(FA4-14-15)(1-16) SUBARTICLE932-1.3.2isdeletedandthefollowingsubstituted: 932-1.3.2 P h y s i c a l R e quirements: Silicone Sealant Type Test Method TypeA TypeB TypeC TypeD Flow ASTMD5893 NoFlow Slump (maximum) ASTM D2202 0.3inches Extrusionrate (minimum) ASTM C1183, Procedure A 20 ml/min 20ml/min 20ml/min 20ml/min Tack-free time at 77 ± 3ºF and 45 to 55% Relative Humidity ASTM

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/implemented/9320103.impl.pdf?sfvrsn=7f36584_0

0010300Admin.impl

. Theportionoftheroadbedimmediately below the base course or pavement, including below the curb and gutter, valley gutter, shoulder and driveway pavement. The subgrade limits ordinarily include those portions, inches below the bottom of the base or pavement and outward to 6 inches beyond the base, pavement

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2016/january-2016/review/implemented/0010300admin.impl.pdf?sfvrsn=3453285c_0

4250000.origind

and cover meet the grade and slope of the pavement surface opened to traffic. 425-6.4 Reinforcing, , to meet the finished grade of the proposed pavement, or if outside of the proposed pavement area, the approval of the Engineer. When adjusting structures in flexible pavement, restore final road

https://fdotwww.blob.core.windows.net/sitefinity/docs/default-source/specifications/by-year/2015/january-2015/review/internal/4250000.origind.pdf?sfvrsn=1495c47f_0
20 of 7243 results